Informs That Revised Commitment in in Response to Has Been Noted.Actions Described in Will Be Examined in Future Insp
ML20210R516
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/14/1997
From: Durr J
NRC (Affiliation Not Assigned)
To: Carns N
NORTHEAST NUCLEAR ENERGY CO.
References
50-336-97-01, 50-336-97-1, NUDOCS 9709030142
Download: ML20210R516 (3)


Text

,

l s @ itty O-

't UNITED STATES m

g-

,, g NUCLEAR REGULATORY COMMISSION

'2 WASHINGTON. D.C. 3066H001

% *....,C August 14, 1997 4

Mr. N. S. Carns, Senior Vice President and Chief Nuclear Officer Northeast Nuclear Energy Company PO Box 128 Waterford, CT 06385

SUBJECT:

INSPECTION REPORT NO. 50-336/97 REPLY

Dear Mr. Carns:

I This letter refers to your July 11,1907, correspondence, in response to our May 12,1997, letter. Your revised commitment is noted. We have subsequently received your Common Cause Analysis in your letter dated July 25,1997. Your actions as described in j

that letter will b9 examined in a future inspection.

Your cooperation with us is appreciated.

Sincerely e 8 "- o' s

Jade P. Durr Chief, Inst > Cons Special Projects Office Office of Nuclear Reactor Reculation Docket Nos. 50-336 0

'_. \\l l y

'k

./

\\ \\

l s

9709030142 970814 PDR ADOCK 05000336 G

PDR I!\\\\W\\\\WInRI!\\WpilgIII

e Mr. N. S. Carns 2

v cc:

M. Bowling, Jr., Unit 2 Recovery Office:

D. M. Goebel, Vice President, Nuclear Oversight J. K. Thayer, Recovery Officer, Nuclear Engineering and Support

/

P. D. Hinnenkamp, Director, Unit Operations F. C. Rothen, Vice President, Work Services

-J. Stankiewicz, Training Recovery Manager R. Johannes, Director - Nuclear Training 3

I cc w/cy of Licensee Response Letter:

L. M. Cuoco, Esquire

.J. R. Egan, Esquire V. Juliano, Waterford Library J. Buckingham, Department of Public Utility Control S. B. Comley, We The People State of Connecticut SLO Designee

- D. Katz' Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN S. P. Luxton, Citizens Regulatory Commission (CRC)

Representative T. Concannon E. Woollacott, Co-Chairman, NEAC

o Mr. N. S. Carns 3

Distribution:

Region i Docket Room (with s9py of concurrences)

Nuclear Safety information Center (NSIC)

PUBLIC FILE CENTER, NRR (with Oriainal concurrences)

NRC Resident inspector M. Kalamon, SPO, RI W. Lanning, Deputy Director of Inspections, SPO, RI D. Screnci, PAO 3

W. Travers, Director, SPO, NRR J. Andersen, PM, SPO, NRR M. Callahan, OCA R. Correla, NRR W. Dean, OEDO S. Dembek, PM, SPO, NRR G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR D. Mcdonald, PM, SPO, NRR P. McKee, Deputy Director of Licensing, SPO, NRR l

L. Plisco, Chief, SPO, NRR S. Reynolds, Technical Assistant, SPO, NRR D. Screnci, PAO Inspectiort Program Branch (IPAS)

DOCDESK DRS Fife

=.

Nht Rope Ferr3 Rd. (Route 156). Taierford. CT 06385

[ NuclearEnergy V

m. e N,icar Pm, si.iio.

Northessi Nuclear Enerr ' spany P.O. Box 128 Waterford. CT 06385-0128 (860) 447 1791 Fas (860) 444 4277 ne Nord.ea.i tee s.ie.

r JUL l i 1997 Docket No. 50-336 B16637 9

U.S. Nuclear Regulatory Commission 1

Attention: Document Control Desk Washington, DC 20555 d

Millstone Nuclear Power Station, Unit No. 2 Commitment Revision - Reciv to Notice of Violation 336/97-01-09 The purpose of this letter is to revise the schedule for a commitment made in our letter dated May 12,1997.M We stated that we would perform a root cause analysis for the -

events cited in the. violation, and for subsequent events, to determine appropriate additional corrective actions, and would submit it to you by July 11,1997.

4 A Common Cause Analysis, which investigated personnel performance in the area of radiation worker. practices, has been completed. - Subsequent to Notice of Violation 336/97-01-09, we received a Notice of Violation applicable to Millstone Unit Nos.1,2, and 3.m The root causes and corrective action recommendations contained in the Common Cause Analysis will be utilized in our response to Notice of Violation (245/97-02-17, 336/97-02-17, and 423/97-02-17).

The revised commitment is as follows:

B16418-1 The results of this Common Cause ' Analysis, including the additionai corrective actions, will be provided to the NRC by July 25,1997.

m Martin L Bowling, Jr. to U.S. Nuclear Regulatory Commission, " Millstone Nuclear Power Station, Unit No. 2, Facility Opetsting L.icense No. DPR 65, Reply to Notice of Violation 336/97-01-09 inspection 50-336/97-01," dated May 12,1997.

- Wayne D. Lanning to Bruce D. Kenyon, "NRC Combined Inspection 50-245/97-02; 50 336/97-02,50 423/97 02 and Notice of Violation," dated June 24,1997.

/

p WA22 5 M112-95

U.S. Nuclear Regulatory Commission "4

B16637\\Page 2 Shou',d you have any questions regarding this matter, please contact Mr. Ravi G. Joshi at (860) 440 2080.

NORTHEAST NUCLEAR ENERGY COMPANY NY k 1

Martin L Bowling, Jr.

V Millstone Unit No. 2 Recovery Officer l

l-cc:

H. J. Miller, Region 1 Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P, Beaulieu, Senior Resident inspector, Millstone Unit No. 2 W. D. Travers, Ph.D. Director, Special Projects Office W. D. Lanning, Deputy Director, inspections, Special Project Office J. P. Durr, Branch Chief, Inspections, Special Project Office t