ML20210R425
| ML20210R425 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/28/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Horn G NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| 50-298-97-07, 50-298-97-7, NUDOCS 9709030118 | |
| Download: ML20210R425 (19) | |
See also: IR 05000298/1997007
Text
__
_
.__ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ , _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ . - . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ - . _ . _ _ _ . . _ _ _ _ _ _ . _ _ _ _ _ _
,. c
. Q:
/g* "C%. $\\ _
NUCLEAR REGULATORY COMMISSION
.
UNITED STATES
- '
$_
-
g'
REoloN IV
..
'
611 RYAN PLAZA drive.SulTE 400
%
,I"
9
ARLIN
N E AS
11-8064
G. R. Horn, Senior Vice President
of Energy Supply
Nebraska Public Power District
4
141415th Street
4
j
Columbus, Nebraska 68601
1
j.
- SUBJECT: COOPER ENGINEERING FOCUS MANAGEMENT MEETING
Dear Mr. Horn:
-This refers to the meeting conducted at Cooper Nuclear Power Station on August 21,
1997. During that meeting we discussed the weaknesses in your operability assessment
1
,
- process noted during a recent inspection. We also discussed the improving quality of your
-
safety evaluations. Detailed results of the engineering focus inspection on operability
assessments and safety evaluations can be found in NRC Inspection Report 50 298/97-07,
1
a
The discussion of the weaknesses in your operability assessments provided us insight into
your understanding of the causes. We found the perspective supplied by operators and
engineers that routinely perform operability assessments particularly useful. The -
discussion of your treatment of operability assessmente during startup helped us to
,
!
evaluate the impact on safe plant operation. We also gained insight into your
!
improvements in your safety evaluations. In general,-we considered the meeting very
j
worthwhile,
in accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code
- of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document
Room.
(
i'
Should you have any questions concerning this matter, we will be pleased to discuss them
with you.
2-
Sincerely,
,
,
e
y
<
- pc
\\
,
omas
w
n, Director
g/
Division of Reactor Projects
4
Docket No.: ' 50-298
' License No.: DPR-46
Enclosures:
1. . Attendance List
2. Licensee Presentation
[fhkN
N,
9709030118 970828
t
ADOCK 05000298
G
_
N
-
.
. - . . -
.
--- - ,, .
. -
-
--
-
_
____---
.-
.
Nebraska Public Power District
3-
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
Nebraska Department of Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
Dr. Mark B. Horton, M.S.P.H.
Director
Nebraska Department of Health
P.O. Box 950070
Lincoln, Nebraska 68509 5007
R. A. Kucera, Department Director
of Intergovernmental Cooperation
Department of Natural Resources
P.O. Box 176
Jef ferson City, Missouri 65102
Kansas Radiation Control Program Director
)
. . . . .
.
_ _ _ _ _ _ _ _ _ _ -
.
-
O
__
-
.
.
Nebraska Public Power District
-4
AUG 2 81997
bec to DCD (IE45)
bec distrib. by RIV:
Regional Administrator
Resident Inspector
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Branch Chief (DRP/TSS)
RIV File
Project Engineer (DRP/C)
l
l
DOCUMENT NAME: R:\\_CNS\\CN8-21MS.DRP
To receive copy of document, indicate in box: "c" = copy wtthout enclosures
"E" = Copy w:th enclosures "N" = No copy
BlV:PE:DRP/C
(s.
C:DRP4
D:DRP
CSMarschall;dt @
EECt$1HW
TPGwynn\\ ,,(gf)
,
8/tr/97
8 6 /97
8/f/97
11'
OFFICIAL ~ RECbR g COPY
--
.
.
Nebraska Public Power District
-2-
cc w/ enclosures:
John R. McPhail, General Counsel
Nebraska Public Power District
P.O. Box 499
Columbus, Nebraska 68602-0499
P. D. Graham, Vice President of
Nuclear Energy
Nebraska Public Power District
P.O. Box 98
Brownville, Nebraska 68321
B. L. Houston, Nuclear Licensing
l
and Safety Manager
Nebraska Public Power District
P.O. Box 98
- Brownville, Nebraska 68321
.
Dr, William D. Leech
MidAmerican Energy
907 Walnut Street
P.O. Box 657
Des Moines, Iowa 50303-0657
'
- Mr. Ron Stoddard
i
Lincoln Electric Systeni
11th _and O Streets
Lincoln, Nebraska 68508
Randolph Wood, Director
Nebraska Department of Environmental
Quality
P.O. Box 98922
Lincoln, Nebraska 68509-8922
Chairman
Nemaha County Board of Commissioners
l
Nemaha County Courthouse
l
1824 N Street
Auburn, Nebraska 68305
-_-
J
_ . , , , ,
. . .
-
.
....
..
.
.
.
Nebraska Public Power District
3-
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
Nebraska Department of Health
301 Contennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
Dr. Mark B. Horton, M.S.P.H.
'
Director
Nebraska Department of Health
P.O. Box 950070
Lincoln, Nebraska 68509-5007
R. A. Kucera, Department Director
of Intergovernmental Cooperation
Department of Natural Resources
P.O. Box 176
Jefferson City, Missouri 65102
Kansas Radiation Control Program Director
l
l
'
,
.
.
. . . -
i
,
.
_-
,.
Nebraska Public Power District
-4-
_ _ _
- AUG 2 81997
-
bec to DCDJIE45)-
I
bec distrib, b W:
- Regional Adml.ilstrator
Resident inspector
DRP Direciar -
DRS-PSB
- Branch Chief (DRP/C)
MIS System
- Branch Chief (DRP/TSS)-
RIV File
Project Engineer (DRP/C)
!
i
t
-.
m
i
1
1
l
!
l
i
i
DOCUMENT NAME: R:\\_CNS\\CN8 21MS.DRP
- To receive copy of document, Indicate in box: "C" = Copy without ecciosures
"E" = Copy with enclosures "N" = No copy
RIV:PE:DRP/C -
E
C:DRPgff
D:DRP
,
CSMarschall;of (ty)g EEC151W
TPGwynn) i,) 49
8/z5 /97 -
8{b/97
8/g97
IT'
OFFICI AL' RECOR gCOl'Y
-
x
\\e
i
G
.
Nebraska Public Power District
-4-
AUG 2 81997
bec to DCD (IE45)
j
bec distrib, by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS PSB
Branch Chief (DRP/C)
MIS System
'
Branch Chief (DRP/TSS)
RIV File
Project Engineer (DRP/C)
<
i
!
!
1
DOCUMENT NAME: R:\\_CNS\\CN8-21 MS.DRP
To receive copy of document. Indicais in box: "C" = Copy without enclosures
"E" = Copy wdh enclosures "N" = No copy
RIV:PE:DRP/C
E
C:DRPgCf l
D:DRP
l
,
CSMarschall;df C@1 EEC61W
TPGwynni ,,) g)
f
8/6/97
8 53/97
8/g97
\\\\'
OFFIClAL' RECOR% COPY
s
_
08/25/97
11:15'
D4E5'8285827
CNS-11 CENSING
@ 001
,,
ENCLOSURE 1
,
CNS/NRC ENGNIEERING MANAGEMENT MEETING
Subject: OPERABILITY ASSESSMENTS AND 50.59s
August 21,1997
MEETING ATTENDANCE LIST
- 31g* y. ~
. nepg:gby
_
.c
.
der
n ( 1 Phil O~raham, Site VP
y
$
3
._ WANJim P&lletier', Sr. Mgr, Engineering
.
- . .
Dan Bunian, Engineering Support Mgr.
Rick Gardner, Ops Mgr.
John Lindinger, Eng,ineering Supv.
Linda Dewhirst, Licensing Eng'r
Brad Houston, Licensing Mgr.
Paul Caudill, Sr. Mgr, SA/SS
Andy Sessoms, Sr. Mrs., QA
Stu hunahan, Work Control Mgr.
Ole Olson, Plant Eng'g Mgr.
Chuck Oaines, Mnte. Mgr.
Dave Van Der Kamp, Ops Supv.
Mike Hale, R.P. Mgr
Sara Stiers, Admin Sycs, Mgr.
Fadi Diya, Design Eng'g, Mgr.
Scott Freborg, Mutc. Eng'g Supv
Al Shiever, Outage Director
Mike White, HR Admin.
Mike Bennett, Licensing Supv.
Larry Newman, Asst. Ops Mgr
Terry RatzlaiT, SS
Yancy Armstrong
Terry Brown, EP Mgr.
Craig Jorgensen, STE
R. Loyd Church, Core Ccoling Eng'r
Joe Cass, Containment Eng'r
Brian Newell, Asst. Matc. Mgr.
Jim Drasier, Sr. Eng'r
r
NRCNfTFNDEFR
Ellis Merschoff
Mary Miller
Art Howell
Elmo Collins
Charlie Marschall
Chris Skinner
i
GIIRST ATTENDEES
Bill Leech, Mid American
Bill Tumbull, MEC
Rich Kosch, LES
Rod Stoddard, LES
Forrest Remick, LAG
.
i.
-
Efict050RE 2 '
~
CNS/XRC
Engineering Management
,
Meeting
, , .
.
.
. . -
August 21,1997
Cooper Nuclear Station
.
. . _ . _ _ _ . . _ _ . _ _ _ _ . . _ . _ _ . . - _ _ _ _ _ . . _ _
. .. ... . . .
__
.
.
.
-Q& & . WN '
's.
V^
" ^
Philip Graham
Cooper Nuclear Station
Vice President-Nuclear
Nebraska Public Power District
2
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.-.
.-
.
- .
.
-.
..
-
..
.
-
-
-.
. _.
.
.
1
HISTORY OF OPERABILITY ASSESSMENTS
Dan Buman
-,~.
.
.
--
-
. _ _ .
!
ENGINEERING SELF ASSESSMENT, FEB.1996
- Revealed im arovements were neec'ed in the
performance of OAs
i
IMPROVEMENT ACTIONS IMPLEMENTED
!
-Engineering management team defined the
standard
!
- Mandatory su aervisor review of all OAs
'
-Developed Training Program Description (TPD)
and certified engineers
-
Nebraska Public Power District
3
'
.
-
.
. - . . .
. .
.
. - .
-
. .
.
- -
-
-
- - - - -
- - .
_ - - -
. -
.
.
HISTORY OF OPERABILITY ASSESSMENTS
i
Dan Buman
--
_.
-
-
- ~-
__
_.
GUIDANCE FOR PERFORMANCE OF OAs
l
~
-Procedural guidance contained in Problem
!
Identification and Resolution (PIR) procedure
- Additional guidance in the form of an operations
{
instruction, which echoes t7e key elements of
'
-Engineering Support Personnel 3rd Quarter
Continuing Training
Nebraska Public Power District
4
_ _ _
_ _ _ _ - - _ _ _ _
_
1
.
.i
.
HISTORY OF 50.59s
Dan Buman
__
_
_
ENGINEERING SELF ASSESSMENT, FEB.1996
- Found weaknesses in 50.59 performance
IMPROVEMENT ACTIONS IMPLEMENTED
- Engineering management team definea standard
'
)
- Mandatory supervisor review of all 50.59s
- Developed new Training Program Description (TPD)
- Streamlined procedural guidance
SUBSEQUENT ENHANCEMENTS
- Further refined the standard
- Developed and provided training to Station Operating Review
Committee (SORC) members
- Developed performance indicator for 50.59
- 3rd quarter Engineering Support Personnel continuing training
Nebraska Public Power District
5
I
,
_
.
.
..
. . ,
._
- - . -
.
.
INSPECTION INTERFACE
Dan Buman
-
-
-
_
_ _ .
CREATED DEDICATED, MULTIDISCIPLINE TEAM
I
-Operations, Engineering, Licensing
- Purpose
e To provide an organized interface with the inspectors
e Prepare and organize materials in advance to ensure
prompt response
- Goals
e Perform a " mini-self-assessment" prior to the
inspection and provide a status report to the
inspectors
e Complete the inspection with no unresolved issues
Nebraska Public Power District
6
.
_ _ _ _ _ _ _ _ . _ _ _ _ _ _
-
-
-
.
.
h
John Lindinger
i
--
~~ ~
.-
_ _ . . .
. -
WHAT WE REVIEWED
- Recently Performed OAs
)
- Procedures
I
- Training
-Self Assessments
CURRENT STATUS OF OAs
- OA conclusions are correct
- Process and procedure needs improvement
-Training and guidance differences between
Operations and Engineering were identified
- OA documentation needs improvement
Nebraska Public Power District
7
._______________/
I
=
.
!
i
John Lincinger
-
-
-
-. - -
.
i
IMMEDIATE ACTIONS
-Revised procedure immediately
-Reviewed active OAs prior to start up
~
.
FURTHER ENHANCEMENTS
-Capture in one single and accessible document
-Create a performance indicator
-Upgrade and add requalification in OA training
Nebraska Public Power District
8
\\.
_ - _ _ _ _ _ _ _ _ _ _ - _ _ - _ - _ _ _ _
/
~
!
.
.
.
50.59
.
Linc a Dewhirst
\\
-.
.
. - -
.
__
_
l
WHAT WE REVIEWED
- Recently performed 50.59 screens and
evaluations.
- Procedures
-Training
-Self Assessments
- Performance Indicator Data
Nebraska Public Power District
9
)
l
_ _ - _ _ _ _ _ _ _
_ - _ _ _
_
-d
,
.
.
. . . . .
.
. - - _ - _ _ _ _ _ _ _ _ _ _
,
.
.
..
50.59 SORC REJECTION RATE
Goal- 3 Month Average <2% by End of 1997
IN ejection Rate (Screens)
R
25%-
inRejection Rate (Evaluations)
!
Ii
- Overall Rejection Rate
(3 Month Average)
Goal
20% -
5
a:
.! 15% -
U
i
a:
"""5
10%-
~$[
f
fh-
m
.
5% -
'S7-
-
%
,
.
.
.
.
-.
Nov48
Dec48
Jon47
Feb47
Mar 47
Apr47
Mey47
Jun47
M47
Aug47
Sep47
OctJ7
Nov47
Dec-97
._
_
m
-
u..
_ _ _ _ . -- _ - - -
--
h--
- '
_
c.
.-
-
-
--
.
.
B
50.59
Linda Dewhirst
-
>
_ _ _
___
CURRENT STATUS OF 50.59
-Monitoring changes to 50.59 in the industry
-Specific issues identified during the assessment
and inspection have been addressed
- Non-intent" used but not clearly defined in
"
procedures
Nebraska Public Power District
10
. _ _ - _ _ _ _ -
/
- - -
- - - - -
,
.
.
.
.
e
50.59
. Linda Dewhirst
-
- -
-
-_
. . - _ _ -
- . . -
FURTHER ENHANCEMENTS
- Non-intent" recognized as a possible
"
vulnerability and will be addressed
-50.59 has shown improvement
e Standards and expectations have been raised
e SORC rejection rate
e Training: Focused and performance-based
- Periodic Assessments (internal and external)
facilitate improvements
e USA affiliates assisting CNS in September,1997
Nebraska Public Power District
11
. ____- ___
.
.
. .
. .
.. .
.
.
-
. .
__
p.
_
.
._.
.
__
--
.
_.
,
!.
-
CNS PHILOSOPHY
Jim Pelletier/ Mike Peckham
~~
.
--
_ - _
_
WE'VE MADE PROGRESS IN OA AND 50.59
l
- Monitoring industry & regulator initiatives on
50.59
-GL 91-18 is incorporated in OA process and
training
COMMITMENT TO CONTINUOUS IMPROVEMENT
-Defining, raising, and communicating our
standarcs
e Handling the unexpected / Corrective actions
e Design / Licensing Basis
Nebraska Public Power District
12
.
-
-
-
-
-
/
_ _ _ _ _ _ _ _ _ _ _ _ _ -
.
..
.
_ - -
-
CNS PHILOSOPHY
Jim Pelletier/ Mike Peckham
"* "
'
i
""
'
~-
. _ _ . .
.
BUSINESS PLAN SHORT TERM STRATEGIES
- Procedure Adequacy & Adherence
- Corrective Action Program
- Focus on Safety and Conservative Decision Making
- Process Improvement Culture
- Work Schedulirig/ Planning
- Communication within and between departments
-Interface with Regulatory, Oversight, and
Independent Assessment agencies
!
Nebraska Public Power District
13
___- -