ML20210R176

From kanterella
Jump to navigation Jump to search
Forwards Draft Integrated Matls Performance Evaluation Program Review of Sc Agreement State Program. Review Team Recommendations Were Discussed with State & Staff on Last Day of Review
ML20210R176
Person / Time
Issue date: 08/11/1999
From: Lohaus P
NRC OFFICE OF STATE PROGRAMS (OSP)
To: Bryant D
SOUTH CAROLINA, STATE OF
Shared Package
ML20210R181 List:
References
NUDOCS 9908170047
Download: ML20210R176 (3)


Text

<

arg g

  • 4 UNITED STATES g

j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 30886 0001 g,,+

August 11, 1999 o

Douglas E. Bryant, Commissioner Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201

Dear Mr. Bryant:

The Nuclear Regulatory Commission (NRC) uses the Integrated Materials Performance Evaluation Program (IMPEP)in the evaluation of Agreement State programs. Enclosed for your review is the draft IMPEP report which documents the results of the Agreement State review held in your office on July 16-20,1999. Mr. James Lynch, State Agreements Officer, Region Ill, was the team leader for the South Carolina review. The review team's recommendations were discussed with you and your staff on the last day of the review. The review team's proposed recommendations are that the South Carolina Agreement State program be found adequate to protect public health and safety and compatible with the NRC program.

NRC has significantly changed the manner in which periodic reviews are conducted for Agreement State programs to assure that public health and safety are adequately protected from the hazards associated with the use of radioactive materials and that Agreement State programs are compatible with NRC's program. The new process, titled IMPEP, employs a team of NRC and Agreement State staff to assess both Agreement State and NRC Regional Office radioactive materials licensing and inspection programs. All reviews use common criteria in the assessment and place primary emphasis on performance. Additional areas have been identified as non-common performance indicators and are also addressed in the assessment.

The final determination of adequacy and compatibility of each Agreement State program, based on the review team's report, will be made by a Management Review Board (MRB) composed of NRC managers and an Agreement State program manager who serves as a liaison to the MRB.

In accordance with procedures for implementation of IMPEP, we are providing you with a copy of the draft team report for review prior to submitting the report to the MRB. We welcome your comments on the draft report. If possible, we request comments within four weeks from your receipt of this letter. This schedula will permit the issuance of the final report in a timely manner that will be responsive to your needs.

The team will review the response, make any necessary changes to the report and issue it to the MRB as a proposed final report. Our preliminary scheduling places the South Carolina I

)

9908170047 990811 PDR STPRG ESGS 1 m v.w w

N ssen

r-AUS f ;iggg Douglas E. Bryant 2

MRB meeting in the last week of September 1999. We will coordinate with you to establish the date for the MRB review of the South Carolina report and will provide invitational travel for you or your designee to attend. NRC has video conferencing capability if it is more convenient for the State to participate through this medium. We will work with your staff to establish a video conference if you so desire, if you have any questions regarding the enclosed :eport, please contact me at (301) 415-3340 or James Lynch at (630) 829-9661.

Sincerely, OrleinalSigned By:

PAULH.LOHAUS.

Paul H. Lohaus, Director Office of SMte Programs

Enclosure:

As stated cc:

Virgil R. Autry, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health & Environmental Control T. Pearce O'Kelley, Chief j

Radiological Health Branch Department of Health & Environmental Control I

l Distribution:

DIR RF RWoodruff, Ril DCD (SP01) PDR (YES)

SDroggitis Babu-Eid, NMSS KSchneider DPiskura, Rlli LRakovan, ASPO RFunderburg, CA DCollins, Ril RTrojanowski, Ril DCool, NMSS JGreeves, NMSS GD=gan, NMSS South Carolina File STr:by, OGC HN:wsome, OGC e

DOCUMENT NAME: G:\\lMPEP\\99DRL7p.S G:\\lMPEP\\S 9.DFT To receive a cop r of this document, Indicate in the bor: "T/dcp without attachment'erdj

  • = Copy with attachrnentienclosure "N". No copy OFFICE Rlll:RSAO l

QSMRl K)Sfp l

l l

NAME JLLynch:kk MW FCCombr,1 ' '

PHL"ohaus l DATE 08/H/99 $#

08A /99 08/

/99 GF OSP FILE CODE: SP-AGJE b N N$lNf

Douglas E. Bryant AIIIII1888 MRB meeting in the last week of September 1999. We will coordinate with you to establish the j

dato for the MRB review of the South Carolina report and will provide invitational travel for you or your designee to attend. NRC has video conferencing capability if it is more convenient for the State to participate through this medium. We will work with your staff to establish a video conference if you so desire. If you have any questions regarding the enclosed report, please contact me at (301) 415-3340 or James Lynch at (630) 829-9661.

j Sincerely, t

91 0

.b fNT Mk' aul H. Lohat's, Director Office of State Programs

Enclosure:

As stated cc:

Virgil R. Autry, Director Division of Radioactive Waste Management Bureau of Land and Waste Management i

Department of Health & Environmental Control T. Pearce O'Kelley, Chief Radiological Health Branch Department of Health & Environmental Control l

t i

J