ML20210R132

From kanterella
Jump to navigation Jump to search
Requests Inclusion of Ws Orser,Sg Catola & Gr Overbeck as Corporate Managers & T Barrett,J Piening,L Cook & Gr Overbeck as Technical Advisors in Control Room Audit Program
ML20210R132
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/10/1987
From: Agosti F
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
VP-NO-87-0018, VP-NO-87-18, NUDOCS 8702170331
Download: ML20210R132 (3)


Text

1

.s

,g,g Nuclear Operations Detroit

,-> 6 Edison E4I" 28 t=..

February 10, 1987 VP-ND-87-0018 U. S. Maclear Regulatory Cosatiss' ion Attn Docusent Control Desk Washington, D. C. 20555

References:

1) Fermi 2 NIC Docket No. 50-341 NIC License No. IWF-43
2) Order Modifying License dated July 3, 1986
3) Detroit Elson to NIC htter, " Reactor.

Control Rocal Audit Program," GP-86-0009, dated November 17, 1986

4) Detroit Elson to NIC Intter, " Reactor Control Roomi Audit Program," VP-86-0102, dated Jtily 16, 1986

Subject:

Beactor Control Bocan Audit Progrant As required by paragraph IV (A) (2) of Reference 2, Detroit Wison is requesting that the following names be added to the list of corporate managers and qualified employes or consultants (technical advisors) identified in Reference 4:

Corporate Managers:

Mr. W. S. Orser, Vice President lanclear Engineering and Services Mr. S. G. Catola, NSIC Chairman Mr. G. R. Overbeck, Director Operator Training Technical Advisors:

Mr. Tim Barrett Certified Sinalator Instructor SRO Level Mr. Jay Piening Certified Sin 11ator Instructor j.

SRO Level 9

0 0

$$$JoSSkS$0$hi t

i P

L

~

USNIC February 10, 1987 VP-ND-87-0018 Page 2 Mr. Lonn Cock Certified Sinulator Instructor SRO Level Mr. G. R. Overbeck, Director Operator Training (Mr. Overbeck has held an SRO license on Fermi 2)

Summary of the 'nchnical Advisors are enclosed for your consideration.

Detroit R11 son believes that inclusion of the above qualified individuals in the Control Room Audit Program will enhance the program by adding relevant experience and perspective to conplement the group of qualified individuals currently comprising the audit team.

We trust that this request will meet your approval.

Should you have any questions regarding this matter, please contact Mr. George Trahey at (313) 586-4300 or Mr. Frank E. Agosti at (313) 586-4157.

Sincerely, A

n.

Ws L.

Enclosure cc: Mr. E. Greenman Mr. W. G. Rogers Mr. J. J. Stefano USNIC Region III

Enclosure to VP-NO-87-0018 l

gemamenr. m G. R. Overbeck seventeen years of managerial and supervisory experience during construction, testing and operation of Naval reactors and the Fermi 2 reactor. Professional responsibilities have included:

Director-Operator Training, Superintendent of Operations, Startup Manager, Assistant Superintendent of helear Production, Technical Engineer at Fermi 2 as well as Department Head and Engineer Officer in the Naval Reactors Program. He has a Bachelor of Science degree from the United States Naval Academy and has held a Senior Reactor Operator license at Fermi 2.

T. J. Barrett Approximately 12 years of nuclear experience during construction and operational phases (BNR, Navy Nuclear). Professional responsibilities have included plant operations (U. S. Navy Shutdown Reactor Operator, Electric Plant Operator, Senior Reactor Operator for the Zinuer Nuclear Power Station). He is G. E. SRO cortifled on BNR-6 systems,~ an ' instructor cartifled SRO at Fermi 2, and currently the Lead Licensed Operator Requalification Instructor for classroom and simulator.

L. J. Cook Approximately 12 years of nuclear experience during construction and operational phases (BNR, U. S. Navy). Professional responsibilities have included operations (U. S. Navy) and instruction (U. S. Navy and BNR). He certified as a Senior Reactor Operator while with General Electric Co. and currently holds a Senior Reactor Operator Certification at Fermi 2.

He is currently a Nuclear Operations Training Specialist at Fermi 2.

D. J. Planing Approximately 14 years of nuclear experience during construction and operationel phases (BNR, Navy helear).. Professional responsibilities have included plant operations (U. S. Navy Engineering Watch Supervisor / Prototype Instructor). He held a Senior Reactor Operator License for the Zinner Nuclear Power Station, a BNR. He is currently an NRC Certified Instructor at Fermi 2 (Classroom and Simulator).

l 1