ML20210Q963

From kanterella
Jump to navigation Jump to search

Forwards SE Re Review of 20th Yr Tendon Surveillance of Plant,Unit 1
ML20210Q963
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/28/1997
From: Buckley B
NRC (Affiliation Not Assigned)
To: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20210Q969 List:
References
TAC-M92045, NUDOCS 9709020234
Download: ML20210Q963 (2)


Text

.

1 August 28, 1997 Mr. James W. Langenbach Vice President and Director, TNI 4 GPU Nuclear Corporation P.O. Box 480 Middletown, PA 17057 i

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TMI-1) REVIEW OF TWENTY-YEAR REACTOR BUILDING TENDON SURVEILLANCE REPORT (TAC NO. M92045)

Dear Mr. (angenbach:

The staff has completed our review of your submittal dated April 7,1995, as supplemented November 29, 1995, and our findings are delineated in the enclosed Safety Evaluation. As noted in the enclosure, we concluded that (1) tendon lift-off forces should not be averaged in the trend analysis; so for ,

the analysis of future tendon lift-off forces, instead of using the average of the normalized tendon forces, the individual tendon forces as obtained from the lift-off of the same group of tendons should be used in the regression analysis; and (2) for future grease inspections, the method of assessing the grease voids should be modified to comply with the intent of Regulatory Guide 1.35 Revision 3, " Inservice Inspu tion of Ungrouted Tendons in Prestressed Concrete Containments." Otherwise, the overall condition of the containment tendon system program is found to be satisfactory.

This completes our efforts on this issue and we are, therefore, closing out TAC No. M92045 Sincerely, Original signed by Bart C. Buckley, Senior Project Manager Project Directorate I-3 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

Safety Evaluation cc w/ enclosure: See next page [

DISTRIBUTION Docket File B. Boger B. Buckley ACRS 9 h C ( I PUBLIC R. Eaton- T. Harris (TLH3) C. Hehl PDI-3 Rdg. E. Dunnington OGC DOCUMENT NAME:indeaee To sneehe e serv of tide h--* G:\BUCKLEY{

In TENDON.TMI beat 'C' = Copy without ettechmentlenenesure 'E' s Copy with attec,wnentlenclosure /f ft[= o copy 0FFICE Pol *3/ Pet Q'f4 16 Poll *3/1.A 16 Ecos l (A)D:PD'ly'3) / V l -

Stuckley ~' EDunnington /@

IIAflE GSepchi* REstt nJ DATE 08/IA/97 08/) 7 /97 08/2T/97 08/ C/A7 Of flCI AL SEcoltD COPV -

9709020234 970828 PDR ADOCK 05000289 ll lll 1lll! JI!!,l!I,1ll

. \

Three Mile Island Nuclear Station, Unit No. I cc:

Michael Ross Robert B. Borsum )

Director 0&M, TMI B&W Nuclear Technologies GPU Nuclear Corporation Suite 525 P.O. Box 480 1700 Rockville Pike Middletown, PA 17057 Rockville, MD 20852 John C. Fornicola William Dornsife, Acting Director Director, Planning and Bureau of Radiation Protection Regulatory Affairs Pennsylvania Department of GPU Nuclear Corporation Environmental Resources 100 Interpace Parkway P.O. Box 2063 t Parsippany, NJ 07054 Harrisburg, PA 17120 Jack S. Wetmore Dr. Judith Johnsrud Manager, THI Regulatory Affairs National Energy Comittee GPU Nuclear Corporation Sierra Club P.O. Box 480 433 Orlando Avenue Middletown, PA 17057 State College, PA 16803 Ernest L. Blake, Jr., Esquire Shaw, Pittman, Potts & Trowbridge

-l a i g on b37 Chairman l Board of County Commissioners  !

of Dauphin County l Dauphin County Courthouse '

Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Edwin L. Schmidt Senior Resident inspector (TMI-1)

U.S. Nuclear Regulatory Commission P.O. Box 311 Middletown, PA 17057 Regional Administrator, Region I U.S. Nuclear Regulatory Comission 475 Allendale Road King of Prussia, PA 19406