ML20210Q846

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Addendum to Rev 27 to 970523 Request for Changes to Fnmc Plan for Commercial Nuclear Fuel Div Fuel Mfg Plant in Columbia,Sc.Attachment to Ltr Provides Explanation of Addendum.Encl Withheld,Per 10CFR2.790(d)
ML20210Q846
Person / Time
Site: Westinghouse
Issue date: 08/18/1997
From: Robert Williams
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Weber M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19317C683 List:
References
CON-NRC-97-039, CON-NRC-97-39 NUDOCS 9709020180
Download: ML20210Q846 (2)


Text

/f7 t) ya Westinghouse Caramercial Nuclear Diawet R Electric Corporation Fuel Division f$Ns8[sg2%

NRC-97-039 August 18,1997 U.S. Nuclear Regulatory Commission Director, Office of Nuclear Material Safety and Safeguards ATTN: Mr, Michael F. Weber, Chief Licensing Bnmch (T8D14)

Division of Fuel Cycle Safety and Safeguards, NMSS Document Control Room Washington, DC 20555 Gentlemen:

SUBJECT:

CHANGES TO FIJNDAMENTAL NUCLEAR MATERIAL CONTROL (FNMC)

PLAN - REVISION 27 - ADDENDUM The Westinghouse Electric Corporation hereby submits an addendum to the May 23, 1997 request for changes to the FNMC Plan for the Commercial Nuclear Fuel Division's (CNFD) Fuel Manufacturing Plant located near Columbia, South Carolina. The attachment to this letter provides explanation of the addendum incorporated within the revised FNMC Plan (pages submitted as enclosures).

Westinghouse requests that the attachment and enclosures with this letter be withheld from 1 public disclosure in accordance with provisions of 10CFR 2.790(d). If you have any questions, please write to me at the above address, telephone (803) 776-2510 Extension 3393, or Fax (803) 695-3964.

Sincerely, WESTINGHOUSE ELECTRIC CORPORATION

- F PID ' 1 u

Robert A. Williams Safeguards Coordinator b hhh!b,h!hl,Il Att -

ent The Ht'sla;7chouse Commerch/NuclearFue/Dinston - wkinerofthe 1988Malcolm Balo@e NabonalQuahtyAwam' 97C9020180 970818 LO C n c1 PDR ADOCK 07001151 C

PDR klK L l '1 I

I LU. br;"r T)

LN

-d.

- ATTACHMENTTO NRC 97 039 4

In accordance with the thlephone discussion with your Mr. Thomas Pham, on August 14,1997, additional changes have been made to the event investigation timetables on pages 2,18,2.19, and

2.20 of the Columbia Fuel Fabrication Facility (CFFF) Fundamental Nuclear Material Control-(FNMC) Plan. Also,' a minor editorial change was made on page 3.13.

In addition, typographical errors have been corrected on pages xvil,2.16, 9.1, and 9.2.

All such changes are highlighted with (and/or bracketed by) bold type, to facilitate review, e

_ _ _