ML20210Q676
| ML20210Q676 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/09/1987 |
| From: | Travers W Office of Nuclear Reactor Regulation |
| To: | Harold Denton, Miraglia F Office of Nuclear Reactor Regulation |
| References | |
| CON-NRC-TMI-87-011, CON-NRC-TMI-87-11 NUDOCS 8702170210 | |
| Download: ML20210Q676 (3) | |
Text
gy
-=
- w-
$G?:
~
- $1; Y
q w.m
~ ?:?-
b - "'hh 4lI "~
Q v~~~~~~~~'
February 9.1987
'NRC/TMI-87-011 h,-
NEMORANDUM FOR:
liarold R. Denton, Director M
Office of Nuclear Reactor Regulation k:q Frank J. Iliraglia. Director Division of PWR Licensing-B 4
3D FROM:
William D. Travers, Director yf f THI-2 Cleanup Project Directorate gm D
SUBJECT:
HRC THI-2 CLEANUP PROJECT DIRECTORATE WEEXLY STATUS M
REPORT F03 February 2 - 8, 1987 p
,k
'mM 1.
DEFUELING m.
Q~
Defueling continued using the Airlift System through Thursday. On
}
g?!
Friday, defueling workers began probing the upper core surface. The p
current top of the core contains a number of rock like structures of varying size from a few inches to approximately 2 feet. The.GPU defueling crews are currently in a two-week outage for data
-f acquisition.
4 2.
ENVIRONMENTAL IG)NITORING
~
f US Environmental Protection Agency (EPA) sample analysis results i
show that THI site liquid effluents are in accordance with
. [?f' regulatory limits NRC requirements, and the City of Lancaster
~
Agreenent.
3" ;~
THI water effluents are sampled from tha station (Units 1 and 2) discharge and analyzed by EPA. Gama spectrum analyses of the seven
./
daily composited samples for January 17 - 23, 1987 1rdicated no M
Till-2 related radioactivity.
f EPA's ganua spectrum analysis of the llRC's THI outdoor air sample 4
for the period January 29 - February 5,1987 showed no reactor 6"
related radioactivity.
M The Lancaster water works intake composited seven daily samples y/
January 18 - 24, 1987. The gama spectrum analyzed by EPA showed no l
reactor related radioactivity.
P' 3.
AUXILIARY AND FUEL HANDLING BUILDING ACTIVITIES p
M Desludging of the Auxiliary Building Sump started during the week.
K Scabbling of the diesel generator baseuent was completed during the week.
Lo Scabbling of the Seal Injection Valve Room was terminated during the 4
week. Modifications are being made to facilitate waste pickup.
- Flushing of tha pressurizer spray line was completed.
m l
l espece >
B702170210 870209 PDR ADOCK 05000320 R
PDR man.....................4......................;..................
unc ronu sis tio son sacu o 4o OFFICIAL RECORD COPY
Harold R. Denton 2
February 9,1987 Frank J. iiiraglia fiRC/TilI-87-011 4.
fiRC EVALUATI0 tis IN PROGRESS Technical Specification Change Request nunbers 49 and 51 and the associated Recovery Operations Plan Change Requests 31 and 33.
Technical Specification Change Request 52.
Technical Specification Change Request 55.
Solid llaste Facility Technical Evaluation Report.
lleavy Load Safety Evaluation Report, Revision 3.
Processed liater Disposition Proposal.
Safety Evaluation h? port for Use of Plasna Arc Cutting Torch.
Temporary Reactor Vessel Filtration Systen Safety Evaluation Report, Revision 3.
Pressurizer Defueling Safety Evaluation Report.
Safety Evaluation Report for Defueling of the Core Support Assenbly.
5.
liEETIfiG The next r.:eeting of the Advisory Panel for the' Decontanination of Three Nile Island Unit 2 will be held on February 26, 1987, at the Lancaster Council Chanbers, Public Safety Building, 201 North Duke Street, Lancaster, PA. The NEC and CPU huclear staffs will respond to the Panel's questions on the licensee's proposed disposition of the accident-generated water and on the T4RC staff's Draft Environnental Impact Statenent on the disposal of accident-generated water. There utl1 be an opportunity for public coment.
The necting is presently schedaled to begin at 3:30 Pit and will continue into the evening.
Persons desiring to speak before the Panel are requested to contact i:r. Thomas Saithgall at 717-291-1042, or write to hin at 2123 t!arietta Avenue, Lanuact-r, PA 17603, so that they uay be placed on the neeting agenda.
SR Min a WHuom D. % s llillian D. Travers Director TitI-2 Cleanup Project Directorate
"'C'>
"m>
" ^ " >
- ssc eonu ais oa soi nncu om OFFICIAL RECORD COPY j
g,y -
se:
,y;. ?
.j.y et.
'W-LIkrold R. Denton 3
February 9,1987 7~
' Frank J. iiiraglia -
fiRC/Till-87-011 p".
INTERNAL DISTRIBUTION
~CDITRL FILE-
-NRC PDR LOCAL PDR EDO OGC EPA
-DOE' RI Regional Administrator
.t
~ RI Division Directors Public Affairs, RI i
9; State Liaison, RI i
Tit! IlQ r/f 1
Till SITE r/f Till-2. Project Section File TitI-1ResidentOffice(5) b-THICleanupProjectDirectorate(14) t
- Q; e.
- o,
=l y
I i
L
.,e A
r I
I i
e L
? r.
l m
ornes >.T.M.I
.T.M.I.C.P......T.M.I.C. i...TM.IC,PD
= = >
.GGwg G1...*,.AT.h,,,,,,,,,,4rq!
2./.^./.87......2./.j,/.07 l
...r..
,./.87 2
r
, cus> 2./../.87.....
tac escu sis oo ooi nncu oua OFFICIAL RECORD COPY J