Text
I OPERATING DATA [EPORT 1
DOCKET NO. 50 - 35E DATE MARCH 14. 1996 i
COMPLETED BY PHILADELPHIA ELECTRIC COMPANY N.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION PRJCLEAR GENERATION DIVISICR4 i
TELEPHONE t215) 841-50Et OPERATING STATUS
- 1. UNIT NAME LIMERICK UNIT 1 i NOTES UNIT 1 INCURRED ONE l
l 3
j
- 2. REPORTING PERIOct FEBRUART, 1986 l
AUTOMATIC SCRAM.
l l
l
- 3. LICENSES THERMAL POWERItedTII 3E93 l
l l
l
- 4. HAMEPLATE RATING (GROSS PO4Elt 1138 l
-l l
l
- 5. DESIGN ELECTRICAL RATING INET tedE):
1955 ' l l
l l
- 6. MAXIFR#l DEPEDWA8LE CAPACITY (GROSS 704 Ell 1992 l
l l
l
- 7. MAXIPRAt DEPEteA8LE CAPACITY (HET tedE18 1955 l
l
- 8. IF CHANGEC OCCLNt IN CAPACITY RATINGS (ITEMS NLRSER 3 THROUGH 7) SINCE LAST REPORT SIVE REASONS Q1 February 1,1986 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the unit was declared to be in amercial coeration.
i
- 9. PONcR LEVEL TO letICH RESTRICTED, IF ANT (HET tedEls
- 10. REASON 5 FOR RESTRICTIONS. IF ANYS 1
THIS MONTH YR-TO-OATE CUMULATIVE
- 11. NOURE IN REPORTING PERIOC 672 672 672
- 12. PRASER OF HotNIS REACTOR NAS C8tITICAL 651.1 651.1 651.1
- 13. REACTOR RESERVE SHUTD0604 NOLNt3 0.0 0.0 0.0
- 14. NOLNts GENERATOR OH-L2NE 645.6 645.6 645.6 i
- 15. t#4IT RESERVE SHUTD0let HOURS
- 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (Ptef) 2,109.974 2.199,974 2 199.974
- 17. GROSS ELECTRICAL ENERGY GENERATED 'IPSOf) 699.970 699.970 699.970
- 18. NET ELECTRICAL ENERGY GENERATED (1941) 673,943 673,943 673,943
- 19. 124TT SERVICE FACTOR
%1 96.1
%1 j
8605140144 860228 gDR ADOCK 05000352 i
l 7
- 20. 194IT AVAILABILITY FACTOR M.1 96.1 96.1
- 21. LMIT CAPACITY FACTOR IUSING IWC NET) 95.1 95.1 95.1
- 22. LHIT CAPACITY FACTOR tuSING DER NET) 95.1 95.1 95.1
- 23. LMIT FORCEO OUTAGE RATE 3.9 3.9 3.9
- 24. SNUTD0644S SCHEDULED OVER HEXT 6 MONTHS (TYPE, DATE. AM DLRATION OF EACHit Unit 1 will be shutdown in May for surveillance testing and general maintenance necessary to onerate until the lst refueling cutage. 'Ihe outage is expected to take six to eight keeks.
- 25. IF SHUTD0644 AT Ele OF REPORT PERICO, ESTINATED DATE OF STARTUP8 4
1
- 26. UNITS IN TEST STATUS (PRIOR TO Cot 9tERCIAL OPERATIONil FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/64 INITIAL ELECTRICITY MID APRIL 85 4/13/85 ComERCIAL OPERATION IST STR 86 t/91/86 e
9 9
I
~de e
h
- e i
e y}
(
/
+
s E
AVE 2 AGE DAILY WIT POWE2 LEVEL l'
r DOCKET HD. 50 - 352 UNIT LIMERICK (MIT 1 DATE MARCH 14, 1986 CortPANY PHILADELPHIA ELECTRIC CortPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION MJCLEAR GENERATIDH DIVISION TELEPHONE t2151 841-5022 4
MONTH FEBRUARY 1986 DAY AVERAGE DAILY POWER LEVEL D4Y AVERAGE DAILY POWER LEVEL (PS4E-HET) title-NET) 1 1061 17 1050 2
1057 18 1049 3
1054 19 1956 4
1059 20 1058 5
1059 21 1065 6
1064 22 1955 7
1059 23 1060 8
1054 24 1060 9
1065 25 1059 10 623 26 1058 11 85 27 1957 12 950 28 1059 13 1040 14 1046 15 1074 16 1044 1
m
e UNIT SHUTD0hNS,APG POWE3 CEDUCTIONS DOCKET NO. 50 - 352 UNIT NAME LIMERICK UNIT 1 DATE MARCH 14, 1966 REPORT MONTH FEBRUARY 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY i
W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE I215) 8'41-5022 l
I I
l l NETH00 0F 1 LICENSEE lSYSTEMICOMPONENT! CAUSE Ate CORRECTIVE I
lTYPEIDURATICHlREASONISHUTTING D0 bell EVENT l CODE l CODE l ACTION TO HO.I DATE I (Ill (HOURS!l (21 l REACTOR (3) l REPORT S I (4) l (5) l PREVENT RECURRENCE I
I I
I I
I I
I i
1 1 860210 l Fl 26.4 l A I 3
l 86-11 l HA I INSTRU l A FULL REACTOR SCRAM FROM 99.8% POWER. OCCURR~
l l
l l
l l
l l
l AS A RESULT OF HIGH NEUTRCH FLUX (FLON BIASEDL l
l l
l l
l l
l l THE HEUTRON FLUX SPIKE WAS A RESULT OF AN l
l l
l
[
l l
l I INCREASE IN REACTOR PRESSIRE CAUSED BY THE l
l l
l l
l l
l l LNEXPECTED CLOSWE OF THE TLABINE CONTROL l
l l
l l
l l
l l VALVES. A GROLRe IN THE ELECTR0 HYDRAULIC l
1 I
I l
l l
l l CONTROL (EHCl CIRCUIT CAUSED THE TLR8INE l
l l
l l
l l
l l CONTROL VALVES TO CLOSE. THE CAUSE FOR THE l
l l
l l
l l
l l GROUFC IS LR4(N06M, BUT SUSPECTED TO HAVE l
l l
l l
l l
l l RESULTED FROM TESTING ACTIVITY letICH INVOLVE 0 l
l l
l l
l l
l l TEMPORARILY C0te4ECTING A DIGITAL. VOLTMETER IN l
l l
l l
l l
l l THE CIRCUIT TO MONITOR EHC SIGNALS.
I I
I ----- 1 I
I I
l l
1 1
I 26.4 I I
I I
I I
(1)
(El (3)
(4)
- F - FORCED REASON METHOD EXHIBIT G. INSTRUCTIONS
- 5 - SCHEDULED A - EQUIPMENT FAILURE iEXPLAIN) 1 - MAMJAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT ILERI D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE INUREG-01611 E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINI5TRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHERIEXPLAINI EXHIBIT I - SAME SOURCE k
b Dockot No. 50-352 Attachment to Monthly Operating Report for f
February, 1986
)
u n
'l 4.
Limerick Generating Station Unit 1 February 1 through*Pebruary 28, 1986 l
I.
Narrative Summary of Operating Experiences I
i I
On February 1, 1986 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, Limerick Generating Station Unit 1 was declared to be in commercial operation
,j with a net capacity of 1055 MWe.
On February 10, 1986 at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />, with the unit at 99.8%
I 1
rated power, a full reactor scram occurred as a result of high neutron flux (flow biased).
The neutron flux spike was the result of an increase in reactor pressure which was i
caused by the unexpected closure of the Turbine Control jj Valves.
A ground in the Electrohydraulic Control (EHC) circuit caused.the Turbine Control valves to close.
The cause of the ground is unknown, but suspected to have resulted from testing activity which involved temporarily connecting a digital-voltmeter in the circuit to monitor EHC signals.
Reactor startup was begun the same day, the turbine-generator was synchronized at 1655 hours0.0192 days <br />0.46 hours <br />0.00274 weeks <br />6.297275e-4 months <br /> on February 11, 1986 and 100% rated power operation was achieved on February 12, 1986.
1 The unit ended the report period operating at 100% rated power.
- j; II.
Challenges to Relief Valves il
}
During this month, there were no challenges to the main steam system safety-relief valves.
4 l
a
't e
,j-f l
o
]le j*
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 1215)841 4000 March 14, 1986 Docket No. 50-352 Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Limerick Generating Station Monthly Operating Report Gentlemen:
Enclocad is the monthly operating report for Limerick Unit 1 for the month of February, 1986, forwarded pursuant to Technical Speci fication 6.9.1.6.
Very t ly yours, "J
/
R. H. Logue Superintendent Nuclear Services Attachment cc:
Director, Office of Inspection & Enforcement, USNRC (12 copies)
Dr.
T.
E.
Murley, NRC E.
M.
Kelly, Senior Resident Site Inspector Mr. David E. Ney, PA Dept. of Envir. Resources Mr.
P.
A.
Ross, NRC (2 copies)
INPO Records Center See Attached Service List