OPERATING DATA REPORT DOCKET NO.
50-348 DATE May 2, 1986 COMPLETED BY J. D. Woodard TELEPHONE (20s)899-5156 OPERATING STATUS
- 1. Unit Name.-
Joseph M. Farley - Unit 1 Notes 1) Cumulative data since
- 2. Reporting Penod. April, 1986 12-1-77, date of commercial
- 3. Licensed Thermal Power (MWt):
2652 operation 860
- 4. Nameplate Ratmg (Gross MWe):
829
- 5. Design Electncal Rating (Net MWe):
873.4 1
- 6. Maximma Dependable Capacity (Gross MWe):
827.5
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
I N/A N/A
- 9. Power Level To Which Restncted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
O Cur' ulative This Month Yr to-Date n
- 11. Hours la Reportmg Period 714 2.879 73.751
- 12. Number Of Hours Reactor Was Critical 719.0 2,845.2 52,478.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On.Line 719.0 2.840.5 51,246.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,872,495 7,303,662 130,175,204
- 17. Gross Electrical Energy Generated (MWH) 621,828 2,427.950 41,731,330
- 18. Net Electrical Energy Generated (MWH) 590,794 2,303,816 39,301,534 j
- 19. Unit Service Factor 100.0 98.7 69.5
- 20. Unit Availability Factor 100.0 98.7 69.5 99.3 96.7 66.5
- 21. Unit Capacity Factor (Using MDC Net) 99.1 96.5 64.3 j
- 22. Unit Capacity Factor (Using DER Net) 0.0 1.3 11.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Esch):
Refueling / maintenance outage. 10/4/86 approximately 8 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY R-6-77 8-9-77 INITIAL ELECTRICITY 1-20-17
.8-18-77 COMMERCIAL OPERATION 12-1-77 12-1-77 8605140105 860430 PDR ADOCK 05000348 R
PDR (4/77 )
L
\\
DOCKET No.
50-348 c
UNIT DATE May 2, 1986 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 StONTl!
April, 1986 j
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ner)
(5tWe-Net) 826 708 g'
g7 2
826 3g 829
~-
~
~~ 8 26 -
-. - - g9 -.
826 3
4 824 20 824 825 21 825 826 1
6 825 n
7 823 23 828 i
g 823 24 827 9
829 25-825 10 830 26 824 gg 829 n
823 821
[2 997 3
13 827 3
824 14 827 30 825 4
i 15 A?;
31 16 828 4
INSTRUCDONS On this form:r. list the aversge d:aly umt power Icvelin MWe Net for e:ch d:y in the reportmg month. Compute Io
, the ne:re:t whole me;swatt.
(9/77) o
O O
o UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J.M. Farley - Unit 1 DATE Mnv 2.
1986 HEPORT MONTH Anril TELErilONE (2051899-5156 w.
'5 w 5 j
c r.
No.
Date g
{
g!d LI'8"5'8 5%
ft Cause & Cassective C
5sx Eyens g7 p3 gg,go,,,,
Oj N
- E $ l N'P"" "
g" Pscvent Hecurrence
8 '
d THERE WE G NO UNIT SHl 'TDOWN 3 OR sit NIFICANT POWER REDUC'1 10NS DURIN ; THE MONTH OF APRIL.
j I
1 I
1 l
1 2
3 4
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain)
I-Manual for Psepasation of Data B Maintenance ei Test 2 Manual Scram.
Entsy Sheets for I.icensee C-Refueling 3 Automatic Scram.
Event Repmt (l_ER) File INUREG-i D-Regulaimy Resiriction 4-Other (Emplahi) 0161) l E-Operator Tsaining & license Examination l
F-Adminisisasive 5
G-Operational Esror (Emplain)
Exhibit ! Same Source (9/77)
II Othes (Explain) 4
/.
M111ing Address Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower "v sav'c ew!*C s 6:e?
May 9,1986 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the April 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very truly, Ill.k.
R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy)
- i a
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE SUM 4ARY OF OPERATIONS April, 1986 There were no unit shutdowns or significant power reductions during the month of April.
The following major safety-related maintenance was performed 7
in the month of April:
1.
Miscellaneous corrective and preventive maintenance was performed on diesel generators.