ML20210Q307

From kanterella
Jump to navigation Jump to search
Application for Rev to Certificate of Compliance 9071 for Model AP-101 to Reflect Shipments in Which Cask Cavity Is Dry When Delivered to Carrier for Transport.Fee Paid
ML20210Q307
Person / Time
Site: 07109071
Issue date: 04/02/1986
From: Jerome Murphy
ANEFCO, INC.
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
26783, NUDOCS 8605140030
Download: ML20210Q307 (2)


Text

'

7/- 96 7/

LNEFCO ANEFCO INC. l%"Jaomo Oe877 203 4ai.3358 RETURN TO' 396-Brs Poe 66 APR 11 P2 :22 April 2, 1986 gg U.S. Nuclear Regulatory Commission

'86 APR 14 P3:24 Division of Fuel Cycle & Material Safety Washington, D.C.

20555 N'

Attention:

Charles E. MacDonald

'O Chief, Transportation Certification Branc g

DOCxrTED

Subject:

ANEFCQ. Model AP-10lType B (U) Lic.ense g'

g3nge Minor Modification

'3

Reference:

Docket No. 71--9 0 3 _,. m.

APR 111986 >

_}

g.

g Mall SECT 10ff DOCKET CLERK k

8 Gentlemen:

ANEFCO Inc. requests that the NRC revise'the ANEFCO Model AP-101

~

cask, NRC Certificate of Compliance no. 9071, to reflect shipments in which the cask cavity is dry (no free water) when delivered to a carrier for transport when" dry loaded" in lieu of " wet" loading such as within reactor fuel pools.

In accordance with our current NRC Certificate of Compliance, Condition 6 states that "In preparation for shipment, the cask must be drained of all excess water".

In addition Condition 6 elaborates and mandates"a vacuum pump must be used......corres-ponding the measured temperature of.,the drained water"l This requirement specifically applies to wel loading but as written encompasses all -shipments-including dry loading.

ANEFCO and the respe'cti've' c'a'sk ' tis ~ers', ' upon' receipt of the cask, will inspect the, cavity for, water...and..take appropriate action to ensure the cask cavity is g~ (no free water) prior to dry loading.

Therefore, we request that Condition 6 be modified or changed to include that the " cask cavity will be dry (no free water) when 5^

delivered to a carrier for transport when dry loaded utilizing f,8 appropriate preshipment inspection techniques and procedures".

0 SE Your cooperation in expediting this request is appreciated.

We ma enclose our check No. 1238 in the amount of ($150.00) one hundred gr and fifty dollars for this modification fee as requested.

Very truly yours, Log _8g_Lff_I____________,

Remitter

.e

$g ANEFCO Ing C h e c k N o. [55[_ ~_ [ ~_'_'_ ['_((~_ ~ ['

Nu h

Am mt/ M___

v Fce C:tri; vy /c d ___________

n D. Murp Type cf ;

Ou

_d_ __,g_ _ _ _ __

resident Date Cher k

-J.f gf B_k____

g Date CcmpMid _ y/' n /f _ _ __,

/

BY: h4 _% M_ _ _. _ _ _ _ _

L

~

I I

,W

~7/-967/

ooc m so.

~

.24 7J'S couraot no.

DATE OF D00._

/)}l/dl((d DATE RCVD.

/)[///(([s FCUF PDR FCAF.

LPDR W

I&E REF.

WUR SAFEGUARDS FCTC OTHER DESCflIFFION:

Ykk

)10 6, %

innGL mzin D. M I

m f

..