ML20210P440

From kanterella
Jump to navigation Jump to search
Forwards Update 2 of TMI-2 Post-Defueling Monitored SAR, Revising SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections
ML20210P440
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/18/1997
From: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210P444 List:
References
6710-97-2371, NUDOCS 9708270133
Download: ML20210P440 (2)


Text

.

,- 3 o

GPU Nuclesr,Inc.

1

('

~

kute 441 South nucmn  ::::::L,_

Tel 717 944-7621 6710-97-2371 August 18, 1997 U. S. Nucicar Regulatory Comnu. .ssion Attn: Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Possession Only License No. DPR-73 Docket No. 50 320 Update 2 of the Post-Defueling Monitored Storage Safety Analysis Report Enclosed is Update 2 of the Post-Defueling Monitored Storage Safety Analysis Report (PDMS SAR )

for TM1-2. The last revision of the PDMS SAR was issued as Update 1 on August 17, 1995.. Update 2 revises the PDMS SAR to reflect the current plant configuration and includes minor editorial changes and corrections.

I Significant changes in the TMI-2 plant configuration that are reflected in the PDMS SAR, Update 2 ~

include descriptions of the modified fire detection system, the relocation of a senrice air compressor (Chapter 7), the deletion of a number of non-radiological, deactivated systems and equipment that have been physically removed from the facility (Chapter 6) and organizational changes that have been made to within GPU Nuclear (Chapter 10). Several other minor changes were made througout the PDMS SAR, Update 2 to reflect minor changes in plant configura' ion, operating practices or system status. In addition, numerous editorial changes including updates of page and drawing numbers have been made.

Changes made from Update I to Update 2 of the PDMS SAR are identified by bold face type within the document. Because of pagination changes, a complete revision of the PDMS SAR has been issued as Update 2 - August 1997.

GPU Nuclear will issue the next revision of the PDMS SAR no later than 24 months from the date of this submittal.

I h CCb i

_.m _

9708270133 970818 PDR ADOCK 05 GOO 320 P PDR_

ll!h'-lllilk1!!i!!

l  !

_ _ _ _ _ - _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ - _ _ _ _ - _ - _ _ - . = _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _

,. .O

\,

Please contact J. Schork, TM1 Licensing at (717) 948-8832 shouki you have any questions regarding 7 . Update 1 to the PDMS SAR.

. Sincerely, W W tv James W. Langenbach Vice President and Director, TMl JSS-Attachment cc:~ Administrator, USNRC Region 1 TMI USNRC Sr Resident bspector TMI-2 Sr. Program Manager