Srction IV.F.2 Boonan W Pilgrim Nuclear Power Station
~'
Rocky Hill Road Plymouth. Massachusetts 02360-5599 Nancy L Desmond Regulatory Relations Group Manager August 7, 1997 BECo Ltr. 2.97-080 U. S. Nuclear Regulatory Commission Attn: Document Control Desk (w/o attachment)
Washington, DC 20555 Docket No. 50-293 License No. DPR 35
Subject:
' Schedulin,p of Pilorim Nuclear Power Station 1997
- Emeroency Preparedness Exercise in accordance with the requirements of 10 CFR 50, Appendix E, Section IV.F.2, Boston Edison Company plans to conduct a full participation Emergency Preparedness Exercise with the Commonwealth of Massachusetts on November 5,1997.
Two copies of the proposed scope and objectives for this exercise are attached for your review.- Also included for your review is the proposed schedule for activities surrounding the exercise.-
The objectives include demonstration, where appropriate, of corrective actions taken in regard to areas that warrant attention previously identified during NRC inspections,
- emergency exercises, and drills;- The scope and objectives are submitted in accordance with FEMA's Radiological Emergency Preparedness (REP) Exercise Manual, FEMA-REP-14, dated September 1991.
If you have any questions or require additional information, please do not hesitate to contact
- Mr. Jack Spangler, Emergency Preparedness Department Manager,600 Rocky Hill Road, Plymouth, MA 02360, or call (508) 830-8041.
Nancy L. Desmond t
/n 1 bs 'S g n o 169 Q -
RWTlm
/
J Attachments cc: see next page 9708210129 970007 l{l{l3$$\\fhhkk!kk PDR ADOCK 05000293 i'
F PDR
10CFR50 Appendix E S ction IV.F.2 Page 2 U. S. Nuclear Regulatory Commission -
' Regional Administr&f, Region 1 (w/o attachment) cc:
U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Alan B. Wang, Project Manager (w/o attachment)
Project Directorate 1-3 U. S. Nuclear Regulatory Commission Office of Nertar Reactor Regulation Mail Stop: OWF 14B2 1 White Flint North -
11555 Rockville Pike Rockville, MD 20852 Chief of Emergency Preparedness and Radiation Protection Mall Stop:.14E21 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Senior NRC Resident inspector (w/o attachment)
Pilgrim Nuclear Power Station exercieeWc971tr. doc e