August 5, 1999 MEMORANDUM TO:

Cynthin A. C!rpent:r, Chi;f Generic Issues, Environm:ntal, Fin:ncial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation FROM:

Peter C. Wen, Project Manager Original Signed By:

Generic issues, Environmental, Financial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH MATERIALS RELIABILITY PROJECT (MRP) REGARDING HIGH PRESSURE SAFETY INJECTION THERMAL FATIGUE CRACKING DATE AND TIME:

August 20,1999 9:00 a.m. - 12:00 noon LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North l

11555 Rockville Pike Rockville, Maryland 20852 Room 0-4B6 PURPOSE:

To discuss options regarding the near term inspection of small f

diameter, Class 1, high pressure safety injection system piping.

PARTICIPANTS:

NRC INDUSTRY j

R. Wessman K. Cozens, NEl W. Bateman J. Carey, EPRI G. Imbro M. Robinson, Duke Power K.Manoly l

K. Wichman f

M. Mitchell P. Wen, et. al.

Project No. 689 cc: See next page hQQ y

Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister l

48344,9/20/94. Members of the public who wish to attend should contact Peter Wen at l

(301) 415-2832.

lO DISTR,BUTION: See next page 7I'/37 File: G:\\RGEB\\PCW\\MNEl0820.WPD

/

SC:RGEph Df d OFFICE PM:RGEB NAME PWen:sw PCd FAkskcS DATE 8/g /99 8/h /99 9908090084 990805' PDR REVGP ERGN C

gy g 35 pn g e fRoc 6 m

/

1 UNITED STATES s

j NUCLEAR REGULATORY COMMISSION i

9 2

WASHINGTON, D.C. 20066-0001

\\*****/

August 5, 1999 MEMORANDUM TO:

Cynthia A. Carpenter, Chief Generic issues, Environmental, Financial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation Peter C. Wen, Project Manager [d C. W FROM:

Generic issues, Environmental, Financial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH MATERIALS RELIABILITY PROJECT (MRP) REGARDING HIGH PRESSURE SAFETY INJECTION THERMAL FATIGUE CRACKING DATE AND TIME:

August 20,1999 9:00 a.m. - 12.00 noon LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room O-4B6 PURPOSE:

To discuss options regarding the near term inspection of small diameter, Class 1, high pressure safety injection system piping.

PARTICIPANTG:

NRC INDUSTRY R. Wessman K. Cozens, NEl W. Bateman J. Carey, EPRI G. Imbro M. Robinson, Duke Power K. Manoly K. Wichman M. Mitchell P. Wen, et. al.

Project No. 689 cc: See next page Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94. Members of the public who wish to attend should contact Peter Wen at (301) 415-2832.

g..

Nuclear Energy institut)

Project No. 689 cc Mr, Ra'ph Beedle Ms. Lynnette Hendricks, Director l

Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy Institute Nuclear Energy Institute Suite 400 l

Suite 400 1776 l Street, NW 1

1776 l Street, NW Washington, DC 20006-3708 f

Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, Director Programs Washington Operations Nuclear Energy Institute.

ABB-Combustion Engineering, Inc.

Suite 400 12300 Twinbrook Parkway, Suite 330 1776 i Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 Mr. David Modeen, Director Mr. H. A. Sepp, Manager Engineering Regulatory and Licensing Engineering i

Nuclear Energy Institute Westinghouse Electric Company Suite 400 P.O. Box 355 1776 i Street, NW Pittsburgh, Pennsylvania 15230-0355 Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy institute Suite 400 1776 i Street, NW Washington, DC 20006-3708 Mr. Jim Davis, Director Operations Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708

n-i

[ DISTRIBUTION: MTG. NOTICE W/MRP(NEI) DATED d

Hard Coov -

~

1999 Anoust 5.

Central File'

- PUBLIC PGEB r/f OGC ACRS OWFN Receptionist PWen MMitchell EM931 SCollins/RZimmerman BSheron WKane DMatthews/SNewberry CCarpenter FAkstulewicz JStrosnider/RWessman W Bateman K Wichman M Mitchell KManoly.