Ltr Contract NRC-05-85-160,Mod 2,authorizing Performance of Task Order 007,to Technical Assistance in Reviewing Design Verification Activities at Comanche Peak
ML20210K216
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/09/1986
From: Edgeworth P
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sargent I
WESTEC SERVICES, INC.
References
CON-NRC-05-85-160, CON-NRC-5-85-160 NUDOCS 8604280051
Download: ML20210K216 (1)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .__ _ ____ __ _

  1. N 8 %o UNITED STATES NUCLEAR REGULATORY COMMISSION 3 f WASHINGTON, D. C. 20666

\ / APR 9 199B Mr. Ian H. Sargent, Vice President Eastern Operations WESTEC Services. Inc.-

2240 Butler Drive

' Suite 100 Plymouth Meeting, PA 19462

Dear Mr. Sargent:

Subject:

Modification No. 2 of Task Order No. 007 Under Contract No.

NRC-05-85-160 Entitled " Technical Assistance in Reviewing Design Verification Activities at Comanche Peak" As a result of a revision to the. scope of work under the subject: task order,-

increasing the*1eveli of' effort for the Mechanical Components (Issue Tracking) discipline and-reducing the level.of effort (85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br /> per professional) for the following disciplines: Electrical. Instrumentation and Control, ~

Civil / Structural, Mechanical Systems and Mechanical Components disciplines, the task ceiling is hereby increased by $17,641 from $304,184 to $321,825.

Authority is hereby provided, in accordance with Section G.11.1 entitled,

" Task Order Procedures," to perform Task ' Order No. 007, Modification No. 2 as described herein by this in your

' reference. technical proposal dated February 27, 1986, incorporated This task order shall be in effect as of July 7,1985 and shall continue through July 1,1987. The revised cost ceiling associated with this task order of $321,825 represents total estimated reimbursable costs in the amount of $295,220.31 and fixed fee in the amount of $26.604.69.

The total amount of the contract ceiling is not affected by this modification, 7 as funds for this effort have been obligated under the basic contract.

The contract's acknowledgement and acceptance of this Modification No. 2 is required, and shall be accomplished by signing three copies in the space provided below and returning two copies to the undersigned. The third copy is to be retained for your records.

S rel ,

JY t -

B604280051 860409 Paul J. Ed orth, Contracting Officer NR -0 -160 PDR Technical ontracts Branch Division of Contracts Office of Administration ACKNOWLEDGED AND ACCEPTED: -

Signature: /