Ltr Contract NRC-05-85-160,Mod 2,authorizing Performance of Task Order 007,to Technical Assistance in Reviewing Design Verification Activities at Comanche Peak
ML20210K216
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/09/1986
From: Edgeworth P
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sargent I
WESTEC SERVICES, INC.
References
CON-NRC-05-85-160, CON-NRC-5-85-160 NUDOCS 8604280051
Download: ML20210K216 (1)


Text

.

N UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

3 f

WASHINGTON, D. C. 20666

\\

/

APR 9 199B Mr. Ian H. Sargent, Vice President Eastern Operations WESTEC Services. Inc.-

2240 Butler Drive Suite 100 Plymouth Meeting, PA 19462

Dear Mr. Sargent:

Subject:

Modification No. 2 of Task Order No. 007 Under Contract No.

NRC-05-85-160 Entitled " Technical Assistance in Reviewing Design Verification Activities at Comanche Peak" As a result of a revision to the. scope of work under the subject: task order,-

increasing the*1eveli f' effort for the Mechanical Components (Issue Tracking) o discipline and-reducing the level.of effort (85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br /> per professional) for the following disciplines: Electrical. Instrumentation and Control, Civil / Structural, Mechanical Systems and Mechanical Components disciplines,

~

the task ceiling is hereby increased by $17,641 from $304,184 to $321,825.

Authority is hereby provided, in accordance with Section G.11.1 entitled,

" Task Order Procedures," to perform Task ' Order No. 007, Modification No. 2 as described in your technical proposal dated February 27, 1986, incorporated herein by this ' reference.

This task order shall be in effect as of July 7,1985 and shall continue through July 1,1987. The revised cost ceiling associated with this task order of $321,825 represents total estimated reimbursable costs in the amount of $295,220.31 and fixed fee in the amount of $26.604.69.

The total amount of the contract ceiling is not affected by this modification, as funds for this effort have been obligated under the basic contract.

7 The contract's acknowledgement and acceptance of this Modification No. 2 is required, and shall be accomplished by signing three copies in the space provided below and returning two copies to the undersigned. The third copy is to be retained for your records.

S rel,

JY t B604280051 860409 Paul J. Ed orth, Contracting Officer NR -0

-160 PDR Technical ontracts Branch Division of Contracts Office of Administration ACKNOWLEDGED AND ACCEPTED: -