ML20210K090

From kanterella
Jump to navigation Jump to search
Notification of 990818 Meeting with BWROG in Rockville,Md to Discuss NRC Mgt on Various Issues.Draft Agenda,Which Provides Specific Items of Discussion Encl
ML20210K090
Person / Time
Issue date: 08/03/1999
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To: Richards S
NRC (Affiliation Not Assigned)
References
PROJECT-691 NUDOCS 9908060004
Download: ML20210K090 (5)


Text

/

p N

UNITED STATES y

7 2

g j

NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 30866 4001 August 3, 1999 MEMORANDUM TO: Stuart A. Richards, Director Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

Stephen Dembek, Chief, Section 2,.

Project Directorate IV & Decommissioning Division of Licensing Project Management i

Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH BOILING WATER REACTOR OWNERS GROUP (BWROG) AND NRC MANAGEMENT ON VARIOUS ISSUES DATE & TIME:

' Wednesday, August 18,1999 9:00 a.m. - 11:30 a.m.

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, MD Room O-4 B-6 PURPOSE:

The BWROG requested a meeting to brief NRC management on their current activities. The draft agenda (Attachment) provides the specific items of discussion.

I PARTICIPANTS:

Participants of the meeting from the NRC include members of the Office of Nuclear Reactor Regulation.

NRC/NRR BWROG B. Sheron G. Warren / Southern Nuclear Company et al.

J. Klapproth/GE J. Kenny /PP&L et al Project No. 691

,[ 3[

Attachment:

Draft Agenda l

cc: See next page Meetings between NRC technical staff and applicants or licensees are open for interested members of the public. petitioners, intervenors, or other parties to attend as observers pursuant g

]

to the " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal pI Bggigig 48344,9/20/94. Members of the public t.ho wish to attend should contact Stephen Dembek (NRC) at (301) 415-1455.

9909060004 990903

)

f pgJ [g /

PDR TOPRP pro w i j

j u

.o i

k August 3, 1999 l

l MEMORANDUM TO: Stuart A. Richards, Director Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

Stephen Dembek, Chief, Section 2 (Original signed by)

Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH BOILING WATER REACTOR OWNERS GROUP (BWROG) AND NRC MANAGEMENT ON VARIOUS ISSUES DATE & TIME:

Wednesday, August 18,1999 9:00 a.m. - 11:30 a.m.

LOCATION:

One White Flint North 11555 Rockville Pike i

Rockville, MD Room O-4 B-6 PURPOSE:

The BWROG requested a meeting to brief NRC management on their current activities. The draft agenda (Attachment) provides the specific items of discussion.

PARTICIPANTS:

Participants of the meeting from the NRC include members of the Office of Nuclear Reactor Regulation.

N_RC/NRR BWROG B. Sheron G. Warren / Southern Nuclear Company et al.

J. Klapproth/GE J. Kenny /PP&L T. Hurst/GE et al.

Project No. 691

Attachment:

Draft Agenda cc See next page Me# gs between NRC technical staff and applicants or licensees are open for interested meinbers of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Reaister 48344,9/20/94. Members of the public who wish to attend should contact Stephen Dembek (NRC) at (301) 415-1455.

OFFICE PDIV-2/LA PDIV-2/SC,

-w j,7 NAME EPeyfdn:rb SDembe_ F K

DATE 8/3 /99 8/3/9h OFFICIAL RECORD COPY DOCUMENT NAME: G:\\PDIV-2\\BWRog\\mtgno818 wpd

c-J-

f, F

Project No. 691 Boiling Water Reactor Owners' Group cc:

l

[

W. Glenn Warren James M. Kenny BWR Owners' Group Chairman BWR Owners' Group Vice Chairman l

l Southem Nuclear Company PP&L, Inc.

42 Invemess Parkway Two North Ninth Street PO Box 1295 Mail Code GENA 6-1 Birmingham, AL 35201 Allentown, PA 18101-1179 Thomas J. Rausch Drew B. Fetters RRG Chairman PECO Energy Commonwealth Edison Company Nuclear Group Headquarters Nuclear Fuel Services MC 61 A-3 1400 Opus Place,4* Floor -

965 Chesterbrook Blvd.

Downers Grove, IL 60515-5701 Wayne, PA 19087-5691 H. Lewis Sumner Carl D. Terry i

Southem Nuclear Company Niagara Mohawk Power Corporation 40 invemess Parkway Nine Mile Point Station PO Box 1295 OPS Bldg /2" Floor Birmingham, AL 35201 PO Box 63 Lycoming, NY 13093 George T. Jones John Kelly PP&L, Inc.

New York Power Authority MC GENA 6-1 14* Floor Mail Stop 14K Two North Ninth Street Centroplex Building Allentown, PA 18101 123 Main Street White Plains, NY 10601 Thomas G. Hurst Thomas A. Green GE Nuclear Energy GE Nuclear Energy M/C 182 M/C 182 175 Cudner Avenue 175 Cudner Avenue San Jose, CA 95125 San Jose, CA 95125

\\

l

i l

NRC/BWR OWNERS' GROUP MANAGEMENT MEETING - August 18,1999 - 9:00 AM DRAFT AGENDA DISCUSSION TOPICS PRESENTER i

Introduction Glenn Warren (SNC)

Role of NRC BWROG Project Manager NRC Revised Source Terms BWROG Appendix R-Circuit Analysis BWROG Vendor Oversight - GE Loss-of-Coolant Accident Jim Klapproth (GE)

Methods Audit Results Post-Accident Sampling System BWROG DC Motors BWROG Improved Water Chemistry (tentative)

BWROG Safety Limit Minimum Critical Power Ratio Relocation BWROG to Core Operating Limits Report STATUS ITEMS PRESENTER Response Time Testing BWROG Excess Flow Check Valves BWROC Emergency Procedures BWROG JOG AOV BWROG Motor Operated Valve / Periodic Verification BWROG Action Item Status Review Glenn Warren (SNC) r Topics are presented in terrns of proposed level of discussion and do not need to be discussed in the order given i

l

!'//

3 Mehing with Boiling Water Reactor Owners Group on August 18,1999 DISTRIBUTION EMail BSheron JZwolinski/SBlack SRichards SDembek EPeyton GTracy GHolahan/TCollins JZwolinski/SBlack JStrosnider/RWessman RCaruso OPA (e-mail to OPA)

PMNS Hard Coov Central File '

PUBLIC PDIV-2 Reading OGC ACRS Receptionist (OWFN and TWFN)