Application for Renewal of QA Program Approval for Radioactive Matl package:0231.Rev 12 to QA Program, Encl
ML20210J769
Person / Time
Site: 07100231
Issue date: 07/26/1999
From: Campbell R
CHEM-NUCLEAR SYSTEMS, INC.
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20210J774 List:
References
RA-0135-99, NUDOCS 9908050091
Download: ML20210J769 (2)


Text

7/-o23/~/

c

'/

,e HEM-NUCLEAR SYSTEMS, LLC

~id 140 Stoneridge Drive

  • Columoia. South Carolina 29210 * (803) 256-0450 July 26,1999 RA-0135-99 Director Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Docket 0231 Renewal

Dear Director:

This submittal provides Revision 12 of the Chem-Nuclear Systems, LLC Quality Assurance Program for your review and approval pursuant to 10 CFR 71.101, Paragraph (f). Our current GA approval,0231, expires on August 31,1999 and this submittal requests renewal of that approval. The following information, other than typographical and grammatical changes, provides detailed descriptions of the changes made in this revision.

1.

Policy Statement revised to reflect corporate name change to Chem-Nuclear Systems, LLC.

2.

Section 1.1.1, revised " Low-Level Waste Disposal Operations" to read "Barnwell Operations", incorporated waste processing services performed at the Chem-Nuclear Consolidation Facility.

3.

Section 1.1.2, revision split " Technical Services and Operations" into Section 1.1.2, " Service Operations" and Section 1.1.3 " Commercial Operations". Former Section 1.1.3, " Controller" deleted. Actual Change is shown below:

1.1.2 Service Operations - Provides engineering for CNS activities.

Manages large component projects and special projects. Service I

Operations provides the licensing expertise for CFR Part 71 transportation casks.

j ; V, 1.1.3 Commercial Operations - Provides transportation and waste

{\\j j v processing services to generators of radioactive waste.

1 4.

Globally replaced " General Manager, Quality Assurance" with " Senior Manager, Quality / Licensing".

9908050091 990726 PDR ADOCK 07100231 C

PDR 1

I July 26,1999 RA-0135-99 Page 2 of 3 5.

Globally added QC to QA to read "QA/QC".

6. - Section 2.0, second paragraph, added " nozzle dam and processing services" to activities governed by QA Program.

i

. 7.

Section 2.2, added "SNT-TC-1 A" as a basis for personnel qualification.

8.

Section 2.5, added "NOA-1" as a basis for program.

9.

Section 4.3.1,'added "NOA-1" to be imposed by way of procurement documents as applicable.

l l

10. Section 5.3, deleted first paragraph which was redundant to second paragraph and procedure covering this activity.

. 11. Section.6.2, revised to remove redundant requirements addressed in Sections 3.0 and 5.0.

L

12. Section 7.1.1.4, added " international" accreditation for work performed outside the United States.

l l

13. Section 7.4.2, added " Compliance". Section now reads:

l

" Inspection records or certificates of conformance/ compliance attesting to the acceptance of items are available";

- 14. Section 7.6, deleted terms receipt and shop inspections, since they are covered by term " inspections".

15. Section 8.1.4, deleted first sentence, "The storage area shall contain only items which have been inspected and accepted." It is acceptable to have a Nonconforming item hold area within the storage area as long as acceptable items are quarantined from nonconforming items. This may be accomplished by tagging and/or a placing the nonconforming item in a segregated hold area.
16. Section 8.2.1, added "important to safety" in front of bulk raw materials.

Varioes commercial grade bulk raw materials, e.g. lime, cement. do not require this level of control.

17. Appendix A, CNS Organization chart revised to reflect current organization.

k.

Y July 26,1999 RA-0135-99 Page 3 of 3 Revision 12 of the CNS Quality Assurance Program incorporates title changes cnd technical clarifications while maintaining equivalent or enhanced program commitments, assuring continued compliance with 10 CFR 71, Subpart H.

Our understanding is that there is no fee associated with this request for renewal. -.This understanding is based our phone discussion with your Frank Jacobs on July 23,1999.

. If.you have any questions or comments regarding this submittal, please contact me at (803) 541-5065.

Sincerely, Chem-Nuclear Systems, LLC g

)

Richard E. Campbell Senior Manager, Quality / Licensing Docket No. 71.0231 Enclosure i

t l