ML20210J652
| ML20210J652 | |
| Person / Time | |
|---|---|
| Issue date: | 07/17/1985 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Bernero R, Miraglia F, Thompson H NRC |
| Shared Package | |
| ML20210J638 | List: |
| References | |
| FOIA-85-800, FOIA-85-801 NUDOCS 8604030523 | |
| Download: ML20210J652 (8) | |
Text
r 2-JUL 171985 MEMORANDUM FOR: Hugh Thompson, Jr.
Robert Bernero Frank Miraglia Themis Speis William Russell FROM:
Darrell G. Eisenhut, Deputy Director Office of Nuclear Reactor Regulation
SUBJECT:
ASSIGNMENT OF SENIOR EXECUTIVES IN THE NEW NRR ORGANIZATION Enclorcd is a memorandum announcing the assignment of senior executives in the new NRR organization. This memorandum will be issued on Monday.
Therefore, by COB Friday, July 19, 1985, you should meet with all senior executives assigned to your new division and (1) notify them that upon reorganization their present position is abolished and (2) offer them the position shown.
If you have questions, please contact Jesse Funches.
Original SD 02Y W
Darrell G. Eisenhut, Deputy Director Office of Nuclear Reactor Regulation
Enclosure:
As stated DISTRIBUTION DEisenhut JFunches 8604030523 860306 PDWI FOIA GARDESS-800 PDR R:PPAS: D h
DD JFunches:cs t
07/17/85 07/17/85
F {poac oq'e.
UNITED STATES w
~
NUCLEAR REGULATORY COMMISSION n
.3 E
WASHINGTON, D. C. 20555 4,
./
....+
MEMORANDUM FOR: Branch Chiefs and Above FROM:
Harold R. Denton, Director Office of Nuclear Reactor' Regulation
SUBJECT:
RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION The Commission has approved the reorganization of the Office of Nuclear Reactor Regulation (NRR) as depicted in the enclosed charta. The assignment of senior executives to the organizational units is also included.
The new organization will be made effective after staff assignments and subsequent negotiations with the National Treasury Employees Union are completed.
l Harold R. Denton, Director Office of Nuclear Reactor Regulation t
l
Enclosures:
F As stated l
.. gny i
Office of Nuclear Reactor Regulation Director:
H. Denton Deputy Director:
D. Eisenhut Planning and Program Analysis Staff D@i rector: rating Reactors Assessment Staff G. Holahan Director:
J. Funches I
Division of Pressurized Water Division of Boiling Water Division of Pressurized Water Reactor Licensing #1 Reactor Licensing Reactor Licensing #2 Director:
H. Thompson Director:
R. Bernero Director:
F. Miraglia Deputy Director:
T. Novak Deputy Director:
W. Houston Deputy Director:
F. Schroeder Division of Safety Review Division of Human Factors and Oversight-Technology Director:
T. Spels Director:
W. Russell Deputy Director:
B. Sheron Deputy Director:
D. Beckham
)
e
. ' WP
~
t Division of Pressurized Water Reactor (PWR) Licensing #1 Director:
H. Thompson, Jr.
Deputy Director:
T. Novak i
Assistant Director for Technical Support (PWR #1)
Assistant Director:
J. Knight PWR Project Directorate #1 PWR Project Directorate #2 Engineering Branch (PWR #1)
Plant Systems Branch (PWR #1)
Project Director:
Project Director:
Branch Chief:
Branch Chief:
G. Lear L. Rubenstein R. Ballard W. GanentII PWR Project Directorate #3 PWR Pmject Directorate #4 Electrical Instrumentation and Reactor Systems Branch Prcject Director:
Project Director:
Control Systems Branch (PWR #1)
(PWR #1)
- 5. Yarga B. Youngblood Branch Chief:
Branch Chief:
R. Rosa C. Berif nger PWR Project Directorate #5 Facility Operations Branch (PWR #1)
Project Director:
Branch Chief:
V. Noonan V. Benaroya i
e l
. 't Division of Bolling Water Reactor (BWR) Licensing #1 Director:
R. Bernero Deputy Director:
W. Houston i
Assistant Director for Technical Support (BWR)
Assistant Director:
G. Lainas PWR Project Directorate il BWR Project Directorate #2 Engineering Branch (BWR)
Plant Systems Branch (BWR)
Project Director:
Project Director:
Branch Chief:
Branch Chief:
J. Zwolinskt D. Mir11er B. Liaw L. Hulman 1
BWR Project Dimetorate #3 BWR Project Directorate #4 Electrical Instrumentation and Reactor Systems Branch Project Director:
Project Director:
Control Systems Branch (BWR)
Branch Chief:
(BWR)
D. Ziemann W. Butler Branch Chief:
M. Srinivasan E. Adensam Facility Operations Branch (BWR)
Branch Chief:
D. Vassallo 4
h i
.. gay Division of Pressurized Water Reactor (PWR) Licensing #2 Director:
F. Miraglia Deputy Director:
F. Schroeder s
Assistant Director for Technical Support (PWR #2)
Assistant Director:
D. Crutchfield PWR Project Directorate #6 PWR Project Directorate #7 Engineering Branch (PWR #2)
Plant Electrical Instrumentation Project Director:
Project Director:
Branch Chief:
-~
and Control Systems Branch (PWR #2)
J. Stolz G. Knighton W. Johnston Branch Chief:
D. Parr PWR Project Directorate #B Special and Standardization Reactor Systems Branch (PWR #2)
Facility (Dperations Branch PWR #2)
Project Director:
Project Directorate Branch Chief:
A. Thadant Project Director:
C. Thomas Branch Chief:
H. Berkow W. Regan Integrated Safety Assessment TMI-2 Cleanup Project Project Directorate D1 rectorate Project Directgr:
Project Director:
C. Grimes B. Snyder Deputy Director:
W. Travers
M t
Division of Safety Review and Oversight Director:
T. Spets Deputy Director:
- 8. Sheron Regulatory improvempat Branch Risk and Reliability Assessment Branch Reactor Safety Issues Branch Branch Chief:
Z. Rosztoczy Branch Chief:
F. Congel Granch Chief:
W. Minners Engineering issues Branch Safety Program Evaluation Branch Branch Chief:
R. Bosnak Branch Chief:
K. Kniel o
.1er i
~
Division of Human Factors Technology Director:
W. Russell Deputy Director:
D. Beckham Operator Licensing Branch Human Factors issues Branch Maintenanc.e and Training Branch Technical Speelfications Coordfration Branch Branch Chief:
- 8. Boger Branch Chief:
F. Rowsome Branch Chief:
H. Bocher Acting Branch Chief:
E. Butcher
.