Monthly Operating Rept for Dec 1985
ML20210H231
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/31/1985
From: Loignon G, Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Barry L
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8604030014
Download: ML20210H231 (5)


Text

"a s

f Director, Office o f Res ource Management December Monthly Opera t ing Repert January 10, 1986 ATTACH ME NT I AVERAGE DAILY UNIT POWE R LEVE L DOCKET NO.

50/395 UNIT V.

C.

SUMMER I DATE 01/15/86 COMPLETED BY G.

A.

Loignon TELEPHONE (803) 345-5209 MONTH DECEMBER 1985 DAY AVERAGE DAILY PO WE R LEVEL DAY AVERAGE DAILY PO WE R LEVEL (MWe-Net)

(MWe-Net) 1.

-9 17.

49 2.

-13 18.

257 3.

-13 19.

541 4.

-14 20.

635 5.

-14 21.

633 6.

-14 22.

631 7.

-22 23.

683 8.

-36 24.

802 9.

-36 25.

266 10.

-35 26.

77 11.

-34 27, 449 12.

-33 28.

798 13.

-29 29.

800 14.

-32 30.

833 15.

-33 31.

877 16.

-33 8604030014 851231 PDR ADOCK 05000395 R

PDR nA y

p (sys

e Director, Of fice of Resource Mansgement December Monthly Operating Report Page 2 January 10, 1986 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE 01/15/86 COMPLETED BY G. A. Loignon TE LEPHONE (803) 345-5209 OPERATING STATUS

1. Reporting Period :

DECEMBER 1985 Gross Hours in Reporting Period : 744

2. Currently Authorized Power Level (MWt):

2775 Max. Depend. Capacity (MWe-Net):

885 Design Electrical Rating (MWe-Net):

900

3. Power Level to which restricted (If Any)(MWe-Net): N/A
4. Reasons for Restrictions (If Any): N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor Was Critical 385.2 6,439.9 11,993.3
6. Reactor Reserve Shutdown Hours 0.0 0

0

7. Hours Generator on Line 320.1 6,274.6 11,640.3
8. Unit Reserve Shutdown Hours 0

0 0

9. Gross Thermal Energy Generated (MWH) 661,338 16,504,980 29,837,566
10. Gross Electrical Energy Generated (MWH) 212,714 5,498,504 9,930,653
11. Net Electrical Energy Generated (MWH) 190,262 5,230,536 9,422,632
12. Reactor Service Factor 51.8 73.5 68.4
13. Reactor Availability Factor 51.8 73.5 68.4
14. Unit Service Factor 43 0 71.6 66.3 3

93.0 (1.6 60.3 lie !!qi t Avsilahilliy eaciut l

its 9-it Car +eity Fir *a~ fUeing Muel 28.9 67.5 60.7

. U9 f t An-c i t y Fr,* " G i. Q g Ef - fe;r, % L ;

T#

6f.3

{,7 p

_,%{

_je

s. e sw, ' q, m s,: s 6:0cm J% u4 N.

% -a t w i ls (Type, liata, dad hv u ic* M w h);

k:SK f

20. If Shut Down at End of E sport Period, Estimated Date of Startup:

N/A

21. Units in Test Status (Prior to Commerical Operation):

FORECAST ACHIEVED Initial Criticality N/A 10-22-82 Initial Electricity N/A 11-15-82 Commercial Operation N/A 01-01-84

ra =.

i..

Director, Office of Resource Management D2cember Monthly Operating Report Page 3

= January 10, 1986 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50/395 UNIT V.

C.

SUMMER I DATE 01/15/86 COMPLETED BY G.

A.

Loignon TELEPHONE (803) 345-5209 (1)

METHOD OF' (2)

TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS /.

NO.

DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER COMMENTS 12 851005 S

396.5 C-4

12) Re fue ling 13 851225 F-27.4 A

-1

13) Pre s sur ize r Spray.

Va lv e Failed Open.

r o e

..s

'h.

Director, Of fice.o f Res ource Management December Monthly Operating Report Page 4 January 10, 1986 ATTACH ME NT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE On December 1,

1985, the Virgil C. Summe r Nuclear Station, Unit No.

1-was shutdown for re fue ling.

On December 14, 1985, at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br />, the reactor was critical.

On December 16, 1985, at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />, low power ph'ys ic s testing was c'omp le t e.

On December 17, 1985, at 1227 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.668735e-4 months <br />, the generator was placed on line.

On December 25, 1985, at.0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />, the reactor was tripped manually from approximately 92% power.

A pre s s ur i ze r s pr a y va lv e failed open causing a reduction in system pressure.-

Automatic Safety Injection resulted from low pre s s ur i ze r pressure.

Upon repressurization,~the RCS was taken s ol id resulting in a challenge to the pre s s ur i ze r power operated relie f ~ va lves at approximately 2335 psig.

On December 26, 1985, at 0748 hours0.00866 days <br />0.208 hours <br />0.00124 weeks <br />2.84614e-4 months <br />, the reactor was critical.

At 1153 hours0.0133 days <br />0.32 hours <br />0.00191 weeks <br />4.387165e-4 months <br />, the generator was placed on line.

On December 31, 1985, the plant was operating at approximately 97%

power.

y.

-f,*

South Caronna Electric & Gas Company Dan A. Nauman F.O Box 764 Vics President a.

Columb:2, SC 29218 Nucktr Operations (803) 748-3513 SCE&G January

1. 0, 1986 Director, Of fice of Resource Management U.S.

Nuclear Regulatory Commission MNBB 7602 Washington, DC 20555 ATTN:

Mr. Learned W.

Barry

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operat ing License No. N P F-12 December Monthly Operating Report

Dear Mr. Barry:

Please find enclosed the December 1985 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No.

1.

This submittal is mad e in accordance with the requirements of Technical Specification 6.9.1.10.

If there are any questions, please call us at your convenience.

[

-w.

fy

yours,
{e r

D.xf. iauman RMF: GAL: DAN / led Attachment cc:

V.

C.

Summer K.

E.

Nodland T.

C.

N icho ls, Jr./0.

W.

Dixon, Jr.

R.

A.

Stough E.

H.

Crews, Jr.

G.

Pe r c iv a l E.

C.

Roberts R.

L.

Prevatte W.

A.

Williams, Jr.

J.

B.

Knotts, Jr.

H.

R.

Denton S.

D.

Hogge J.

Nelson Grace INPO Records Center Group Managers ANI Library O.

S.

Bradham L.

N.

Carter C.

A.

Price R.

E.

Rainear C.

L. Ligon (NSRC)

NPCF FILE r

.