4 OPERATING DATA REPORT WNP-2
- 1..27..86..R.EVISION 1 date 1.
DOCKET: 50-397 2.
- REPORTING PERIOD:_ DECEMBER 1985 DUTAGE + DN-LINE HOURS 3.
UTILITY CONTACT:
LEONARD HUTCHISON (509) 377-2501 EXT-2486
~
4.
LICENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe) 6.
DESIGN ELECTRICAL RATING (NET MWe):
7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
i O.
MAXIMUM DEPENDABLE-CAPACITY (NET MWe)a 9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT,-SIVE REASONS:
o -._____
- 10. POWER.TO WHICH RESTRICTED, IF ANY (NET MWe):
- 11. REASONS FOR RESTRICTIONS, IF ANY:
MONTH YEAR CUMULATIVE
- 12. REPORT PERIOD HOURS
- 13. HOURS REACTOR CRITICAL
- 14. RX RESERVE SHTDWN HRS
- 15. HRS GENERATOR DN LINE
- 16. UNIT RESERVE SHUTDOWN HOURS
- 17. GROSS THERMAL ENERGY (MWH)
- 10. GROSS ELECTRICAL ENERGY (MWH) 4
- 19. NET ELECTRICAL ENERGY (MWH)
- 20. UNIT SERVICE FACTOR
- 21. UNIT AVAILABILITY FACTOR
- 22. UNIT CAPACITY FACTOR-(MDC NET)
- 23. UNIT CAPACITY FACTOR (DER NET)
D__
__10.1%
___1QfG___
- 24. UNIT FORCED DUTAGE RATE 0
_743.3 7d5,.f___
- 25. FORCED OUTAGE HOURS 1.
- 26. SHUTDOWNS-SCHEDULED DVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):
B604020714 851231 PDR ADOCK 05000397 R
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
_ b L
O.t
c.
\\:
De
. ~.
i Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372 5000 January 28, 1986 Docket No.
50-397 Director Office of Resource Management
-U.S. Nuclear Regulatory Comission Wastington, D. C.
20555
Dear Sir:
Transmitted herewith is a revision of the Monthly Operating Report for December 1985.
Very truly yours, hi b?
M4 C. M. -Power s (M/D 927M)-
WNP-2 Plant M.anager CMP /lc Enclosure cc: Mr. John B. Martin -