So- % L MEMORANDUM FOR:
Lester S. Rubenstein, Acting Deputy Director Division of PWR Licensing-A FROM:
Paul W. O'Connor, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A SEP 191986 THRU:
B.J. Youngblood, Director PWR Project Directorate #4 Division of PWR Licensing-A
SUBJECT:
REQUEST FOR INDIVIDUAL SH0LLY NOTICE:
REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETP0 INT CHANGES Your consent is requested to publish the attached Sholly Notice for Wolf Creek as an individual notice. The subject Technical Specification change will add conservative reductions to reactor trip system instrumentation trip setpoints to incorporate increased uncertainties identified during system calibrations carried out at higher temperatures than those used by the vendor prior to plant operation.
These changes had been considered low priority by the' licensee until they recognized that they were needed to support operation during the Cycle 2 operation scheduled to begin in November.
If this notice is included in the next bi-weekly notice Wolf Creek could be subject to an unnecessary delay in return to power if a significant improvement in the proposed refueling schedule is accomplished.
(s\\
Paul W. O'Connor, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A I
l
- v. DISTRIBUTION:
s Docket J11es l
NRC PDR
^
l Local PDR l
PWR#4 Reading l
P0'Connor MDuncan BJYoungblood Reading l
hg PWR#4/DPWR-A PWR#4/DPWR-A P0'Connor/ rad BJYoungblood j l%
(h 8609250371 860919 PDR ADOCK 05000482 P
pop L