ML20210G214

From kanterella
Jump to navigation Jump to search
Mod 3,deobligating Funds,To Review of Tornado Missile PRA- Limerick Generating Station & Seabrook Nuclear Power Plant
ML20210G214
Person / Time
Site: Seabrook, Limerick, 05000000
Issue date: 09/03/1986
From: Mcguffin J, Wiggins E
NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY (FORMERL, NRC OFFICE OF ADMINISTRATION (ADM)
To:
Shared Package
ML20210G179 List:
References
CON-FIN-D-1310, CON-FIN-D-1326, CON-NRC-03-84-088, CON-NRC-3-84-88 NUDOCS 8609250354
Download: ML20210G214 (2)


Text

. .--. .

e9

.. CONT A ACT dD CODE PAGE OF PAGES

. AMENDMENT OF SOI.lCITATION/ MODIFICATION C F CONTR ACT 1 2

2. AMLNDMLNT/MobaF IC AT aON NO. 3. L P P LCilVL DAT L 4. REQuibil 'Orpuh CHASL R L Q. NO. S. PR OJECT NO. (tr apptace6 des 3 SEP 3 19BE 6.essvLo av NRR-84-088 dtd 7/7/86
7. AoMinisT L RLD Ov gif otne, then stem aj

[

U.S. Nuclear Regulatory Comission Division of Contracts Washington, DC 20555

8. N AML AND ADDH L $b OF CONT R AC1OR (14 0., stree t. coun ty, S tate and Zlf Codet y 9A. AMENDMENT OF SOLICsT ATION NO.

National Bureau of Standards Structures Division Building 226, Room B146 *B oA T L o <su sm., , ,,

Washington, DC 20234 ATTN: Dr. Emil Simiu loa Mgo F iCATiON Or CONT a ACieORDEF.

X NRC-03-84-088 CCDE l FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in item 14. The hour and date specified for rearpt of Offers is entended, es not * * -

senoed Offus rnost ace nowledge receipt of this amendment poor to the hour and date specified in the solicitation or as amended, by one of the following rnethods 41 By completing items 8 and 15. and retu r ning ___ copies of the amendment. (b) By acknowleds.no receipt of this amendment on each copy of the offe-submatted. Or (C) BV 9eparate letter or trie7am which includes a reference to the solicitation and amendment numters FAILURE OF YOUR ACKNOWLEDG MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE sPECIFIED MAY RESULT IN REJECTION OF YOUR OFFE R If by virtue of this amendment you des lre to change an offer attem sabmitted.such change may be rnMe by teieg am o-letter, provided each teleg'am Of lette- tnal es reff'rence to the s3ticatation and thss amendment and is rectived prior to the opening hour and date speched D. ACCOUNTING AND APP 5 TOP 64a AT ION DAT A (J/ eveur ed) 20-19-40-41-3 (D1310) 20-19-10-11-3 (01326) 31X0200.806 Deobligate: $26,950.89

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MOOlFIES THE CONTRACT / ORDER NO AS DESCRIBED IN ITEM 14.

W "' D C5"ORD"LANO 8e@O!Y$ *"'""" 8#"'#'** '#**"^""" " " ' " ' " ' ' ' * ' ' ^ " ' " " "*"

B. THE ABOVE NUMBL RED CONT R ACT/OR DE R #5 MODtFIED TO RErLECT THE ADMINISTR ATivE CHANGES isuch as changes m psyang offste 87Propr sefson date, e tc J 5E T F OR TH IN 4T E M 14, PUR$U ANT TO THE AUTHORIT Y OF F A R 43.103101 c.1Ht$ $UPPLLMLNT AL AGR E L ME N t t$ L NT E RE D sNTO PUE5v ANT T O AUTHORIT Y OF :

Xl Mutual agreement of parties.

l- ' D OT HL k threcsfy type of modniscatoon and ou tnorstvo l E IMPORTANT: Contractor is not, b is reau. red to sign this docurnent and return Copies to the issuing Of flCe le CL SL k ePT EON OF AMLNDML NT(MODIF nckT EON forgerused b> L'Ci eretnon headants. snesudsnc sokestataorvcontract eutvect metter ash < re franskir a The purpose of this modification is to deobligate $26,950.89 of excess funds remaining l under this interagency agreement, while the closeout process continues and change the j project officer. The total amount of NRC obligations is $87,249.11.

The following changes are hereby made to Article III - Estimate of Cost and Obligation of Funds:

l 8609250354 860903 PDR CONTR NRC-03-64-088 PDR E as proveded herein, ats terms ano condttions of the document referenced in item 9A or 10A, as heretofore cnanged, remains unchanged and in f utt force 1S A. N AME AND T oT LE OF SIGNER (Type or pnnes 16A. N AML AND T IT LE OF CONT R ACT ING OF F ICER (Type or pnnff JOHN C. Mo0UFFIN Deputy comptroner Elof s J. Wiggins 159. CpN T 6 AC T Oft /OF $ E R O R iSC. DATL $sGNED 16 6. UN 8 EDSTAT OF AM RICA 16C. O ATI. SIGN ED bl '

8> g 15senature of person authe&ased to angn) Q' 7

gY

i o isngnatu're of Contgc3 n s Offscert e NSN 7540 01 IS P 8070 30105 STANDARD FORM 30 (MEv.10 83)

PRlVIOUS EDITION UNU$ABLE Prescribed ev GS A F AR (48 CF R) 53.243 g _ __

~

f

.. .o NRC-03-84-088 Modification 3 Page 2 A. The estimated cost to the NRC of the work to be performed hereunder is reduced by $26,950.89 fron $114,200.00 to $87,249.11.

B. The amount presently deobligated by the NRC~ for the perfonnance of work hereunder is reduced by $26,950.89 from $114,200.00 to

$87,249.11, chargeable to the following accounting data:

B&R No. 20-19-40-41-3 FIN No. D1310 B&R No. 20-19-10-11-3 FIN No. D1326 The following change is hereby made to Article IV - Technical Direction and Authorized Representatives:

The Project Officer for this requirement is Ms. Jayne Halvorsen (telephone: 301-492-4221).

.