. VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT 4
REPORT NO. 86-01 APPROVED BY: / b d 2ew u u nt.
t.a J.wn.4n4.
i STATION LAN AGER'
~
I i
l l
?
I Nk 8604020351 851231 p
PDR ADOCK 05000280 yDP R
\\Y\\
i t
Section Page 1
Operating Data Report - Unit #1 2
Operating Data Report - Unit'#2 3
Unit Shutdowns and power Reductions - Unit #1 4
Unit Shutdowns and Power Reductions - Unit #2 5
Load Reductions Due to Environmental Restrictions-Unit #1 6
Load Reductions Due to Environmental Restrictions - Unit #2 Average Daily Unit Power Level-Unit #1 Average Daily Unit Power Level-Unit #2 Summary of Operating Experience Amendments to Facility License or Technical Specifications 11 & 12 Facility Changes Requiring NRC Approval 11 & 12 Facility Changes That Did Not Require NRC Approval 13 Tests and Experiments Requiring NRC Approval 13 Tests and Experiments That Did Not Require NRC Approval 14 Other Changes, Tests and Experiments Chemistry Report 15 Description of AllInstances Where Thermal Discharge 16 Limits Were Exceeded Fuel Handling 17 & 18 Procedure Revisions That Changed the Operating Mode 19 l
Described in the FSAR Description of Periodic Tests Which Were Not Completed 20 Within the Time Limits Specified in Technical Specifications l
a l
l.s 11 Section Page
' Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Mechanical Maint? nance 21 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Electrical Maintenance 21 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Instrument Maintenance 21 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Mechanical Maintenance 21
' Maintenance of Safety Related Systems During Outage or
. Reduced Power Periods - Unit #2 - Electrical Maintenance 21 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Instrument Maintenance 21
-m
,~,--o-.--,
- ~- -
ADM-4c Page1 ACACEMINT 5 l
Pcge 1 of 3 OFF. RATING DATA REPORT FEB02 W
~
DOCl*IT NO. 50-280 DATI H1-02-86 COMPLETED BY V. Jones
- "ELEPEONI (804)357-318 OPE?ATING STATUS l.
Unit Kame:
Surry Unit 1 Notes 2.
Reporting Period:
12-01-85 to 12-31-85 3.
Licensed Thermal Power (MWt):
2441 4
Nameplate Racing (Gross MWe):
847.5 5.
Design Electrical Rating (Net MWe): 788 6.
Mar 4== Dependable Capacity (Gross MWe):
82n 7.
Mar 4== Dependable Capacity (Net MWe):
7R1
~
S.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Tr.-to-Date Cummulative
- 11. Hours In Reporting Period 744.0 8760.0 114192.0
- 12. Number of Ecurs Reactor Was Crit.ical 744.0 7935.4 72312.1
- 13. Reactor Reserve Shutdown Hours 0
0 3774.5 14.
Ecurs Generator On-Line 744.0 7R29.4 70838.5
- 15. Unit Reserve Shutdown Hours 0
0 3736.2 16.
Gross Thermal Energy Generated (MWE) 1729638.3 17868445.6 163RR2622.7 17.
Gross Electrical Energy Generated (MWE) 571260.0 5919970.0 52771933.0
- 18. Net Electrical Energy Generated (MWE)
~ 542318.0 5,618,280.0 50033343.0 19.
Unit Service Factor 100.0%
89.4 %
62.0 %
20.' Unit Available Factor 100.0 %
89.4 %
65.3%
.21.
Unit Capacity Tactor (Using MDC Net) 93.3 %
82.3%
56.7%
22.
Unit Capacity Factor (Using DER Net) 92.5 %
81.4 %
55.6 %
- 23. Unit Forced Rate o'
2.0%
18.7 %
24.
Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Snubber inspection - March 14.1986 - 10 davs 25.
If Shut Down At End Of Report Period Estimated Date of Startup:
26.
Units In Test Status (Prior to Cot:nercial Operation):
Forecast Achievec INITIAL CRITICALIIT INITIAL ELECTRICITY COMMERCIAL OPEPATION (0/77)
i NU Page 2 A~J.T52*r0 1 Page 1 of 3 OPERA ~~NO DATA F.ZPOE*"
O EO DOTi'IT NO. 50-281 DATI 01-02-86 COEFLETED-EY. V. Jones 7 ** BONE w04) 357-3184 OPERATING STATUS 1.
Unit Name:
Surry Unit #2 botes 2.
Esporting Period:
1?-01-R5 to 12-31-R5 3.
Licensed Thermal Power.(W :):
2441
~
4 Nameplate Rating (Gross We):
847.5 5.
Design Electrical Rating (Net W e): 788 6.
Mariar.2m Dependable Capacity (Gross We): 811 7..
Mnhm Dependable Capacity (Nat We):
775
~
E.
18 Changes Occur in Capacity Ratings (1:e=s Nunber 3-Througe 7) Since Las:
Report, Give leasons:
9.
Power Level To Ynich Restricted, If Any (Net We):
- 10. Reasons For Restrictions, If A=y:
This Month Tr.-to-Date Cn A m:ive
- 11. Ecurs in Esporting Period 744.0 8760.0 111072.0
- 12. Number of Ecurs Reactor Was Critical 744.0 5936.5 71942.7 13.
Reactor Reserve Shutdown Hours 0
0 32R.1 14.
Ecurs Generator On-Line 744.0 5857.8 70785.4
- 15. Unit Reserve Shutdown Hours o
o n
16.
Gross Thermal Energy Generated (EE) 174n111.1 133nR625.3 165307030.6
~
- 17. Gross Elec:rical Energy Generated (WE) 572275.0 4297830.0 53588304.0 i
- 18. Net Electrical Energy Generated (WE)-
03137.o 4072445.0 50"86583.0
- 19. Unit Service Fac:c:
inn %
an.9%
63.7 %
20.
U it Available Factor 100%
66.9 %
63.7 %
, 21. Uni: Capacity Factor (Using MDC Net) 94.2 %
60.0 %
58.7%
22.- Unit Capacity Factor (Using DER Net) 92.6 %
50.0%
58.0 %
- 23. Unit Forced Rate n
.3%
13.5 %
24.
Shutdowns Scheduled Over Nex: 6 Months (!ype. Date, and Duration of Each):
Snubber inspection - March 28.19R6 - 10 days 25.
If Shut Down A: End Of Repor: Period Es:1=ated Date of Startup:
26.
Units in Test Sta:us (Prior to Cc=mercial Operation):
Forecast Achieved I!*ITIA1 CK!TICALITY INI!*.Al n TCTRICITY CO.M RCIAL OPEEATION (c/77)
Page 3 4
.L w
CC m.;
M M
t' O
e E
m a
n h ed C
,25
= > O c -
7 7 E06-M
$ U.T.
.M**
=
g c =
0GC O >
U" M
S
=4"W M
v o
o
--E.I O !c-I IM
=
c=
=
m'WW>W
..M af*I E.
Z < e en Z*2<=O
- .: 5
- ==r C3tr M
2 V= g w
=SE
=
I. Z ' E EW" I,
- 4. <U =_
.$_s: D c E.
.= g i"
=IC.
F.
vN Z
E" I
hp O
t U
[.
~
e.
T O
I N
+
M E
Z o
e 8
susuodmea mT W
.s E-m
=
.. s 5as:r-E E
~
.caas-
$E I I-64+
massI; C
1::
f C
C 6
.s.
M w
M m.
E""
2:<
m w
at
=
eZ E
3 O
g
.# w [
- y w
E
.E j
_9 E
=m u
- =
=
=
=
W e
k 5
K
-O N
m tlll necruunna o
w z
Z Smilnys s
N
~
2 1
s
.5
=
.a Jo Po458M E.
s.
=
I W
W" J 4 w I E Y
- W
\\.
I. W
=
=
=_
6 2 *=
=
=
E,$ W.S.E i
6,e a
a2"#
- g = Ah e
=
($2n0H)
I I..3 z =I ~fA.
W unnema
.* r 3 s g a.
m e
E1 a.b eTil s=XEE T.
3
- W Il
$NEYOW6d" e.
D5C nw J3
""w as 82
- ~,
M p.
bM N
- I
- L".'
. _ - - _... ~. _, _ _ _. _ _
R
.o r
50 - 281 IM)CRET No.
UNITsiluil>0WHs ant)I'OWER REI)DC110NS IINIT NAME Surry 2
,llA1 E HI-03-86 00MPl.E T Ell ny V..lones REi' ORT MONill Dec.,1985 r
(804) 357-3184 l
"t_
h
$se(
1.lcensee 5%
4 Cause A correceive c
et 7 5 gg
.E e E
u Acts., so N"-
08
h jE
.c 3 ac Event vY}
reevent Recussence h
o6 jIX Repool#
None During thi i Perio<
f 1
./
a i
I I
j i
i
)
4 I
l 1
Methoil:
Enlilbit G. Instructions F: Forced Resum:
5: Scheduled A Eigvipment Fellme(Emplain) l-Manuel for riepsession of Dans B-Maintenance of Test 2-Manasi Screm.
Entry Sheets foe 1.lcensee 3 Autmnatic Scram.
Event Repnet (LER)I'lle (NtlRI.G-C Refueling D Regulatoey Restelettem 4-Othee (Emplain) 0161) y
- =
E-Opereine Teetning & Ucense Eneminetkat 9
5 F-Adadmittestive Exhibit 1 Ssme Simecc
.s-G-Operational Essos (Emplain)
I l'8/ F7)
II.0thes (Emplain)
Page 5
' LOAD REDUCTIONS DUE TO ENVIRON'.: ENTAL RESTRICTIONS UNIT NO. I MONTH: Dec.,1985
'DATE TI:E HOURS LOAD, Mi?
REDUCTIONS,!Ei
%'H REASON NONE DURING THIS REPORTING PE 110D.
i l
l l
. MONTHLY TOTAI,
Page 6 LOAD REDUCTIONS DUE To C;VIRON" INTAL RESTRICTIONS C;IT NO.2 MONTH: Dec.,1985 i
DATE TI:E HOURS LOAD, IN' REDUCTIONS,'M IMI REASON NC NE DURING '?lIIS REPORTING PERIOD
'ee 1
MONTHLY TOTAL
........._s_......_..._
~ ~.
- _ ~. _ - _. _. _.. _. _.
4 e.
2 i
PHOGRAP NOSl20Mt Ol/el/Hn 15 46.I*
WEPLQ AVEk&GF 04 f L V UNI T P0mF R LEVEL SURRf PudER $lallDN DECEMRER'1965 l
REPORTING MON [H t
DOLMff 40.90-281 DOCar t NH. $0-286 DATE JANuage 62. l #9e
. C OM PL E T E D f4 f V. JONI%-
5 L
U N I f 0N F UN If f W 0 Avtga6E 04lLv POWER LEVEL AvFRAGE Dally POWF# LEVtl D4v
-MW E -fa i-
-MWL-Nrt.
c
)
720.5 h! ).9 2
F?%.7 614.2 s
F29.4 616.7 4
728 8 616.1 i
128 3 6te.1 2
6 126.8 622.9 i
7%S.9 625.8 i
H 726 0 hST.1 l
9 F29 3 707.1 1
to F27.9 763.R
{
11 726.8 76%.3 i
12 727.0 76R.9 13 T25.8 Ten.e Is F29.F 766.R j
lb T27 2 768.9 Ig 711.1 7FO.9 17 729.3 769.6 i
le 727.0 7en.O j
19 727.6 767.6 20 F26.9 766.9 k
21 721.4 166.h b
i 22
-727.8 76h.4 t
1 23 F24 9 767.0 24 F25.0 766.1 75 729 2 767.6 i
26 727.0 769.6
{
27 F 2 'F. 2 766.8 26 Fis.S 76h.4 1
29 737.S 766.6 I
10 F38.1 766.2 l
18 793.4 766.8 i
1 4
l 1
5 h
i 11 i
e 3Q' l
8
-a d
6 m
SUh3h7ARY OF OPERATING EXPERIENCE Page 8 MONTH / YEAR DEC.1985 Listed below.in chronological sequence by unit is a summary of operating-experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT ONE 12-01-85 0000 This reporting period begins with the unit at 95% power,.
765 MW's due to 1-CN-DC-1 A being out of service.
12-27-85 1647 Started power increase at 3%/hr. to 780 MW's.
1747 Holding power at 97%.780 MW's.
'12-31-85 2400 This reporting period ends with the unit at 97% power,780 MW's due to 1-CN-DC-1 A being out of service.
b 9
e S
J I
5"'t M!.F.Y. OF~ OPET.;.""N O I.: PIT. IN CI Page 9
~ -
~
MONTH / YEAR DEC.1985 Listed below in chronole-ical'secuence by unit is t. summary of operating
- experiences for this month v hich recuired load recuctions or resultec in significant non-loed related incidents.
UNIT TWO 12-01 0000 This reporting period begins with the unit at 80% power,.
650 MW's due to the 4A feed water heater being out of serVICP.
12-08-85 1400 Re'.urning 4 A feedwater heater to service, commencing rawer increase as heaters are put into service.
2328 Unit at 100% power,805 MW's.
'12-31-85 2400 This reporting period ends with the unit at 100% power,805 MW's'.
I o
r O
6 t
0 8 9
page 10 AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS DECEMBER,1985 NONE DURING THIS REPORTING PERIOD -
es O
J s,
P:ge 11 FACILITY CllANGES REQUIRING NRC APPROVAL DECEMBER,1985 NONE DURING TIIIS REPORTING PERIOD FACILTY CHANGES THAT DID NOT REQUIRE NRC APPROVAL DC 80-98 A CYCS Ileat Tracing Modification Unit 1 This design change provides a diesel-backed redundant heat tracing system for portions of the Chemical and Volume Control System containing Boric Acid.
Summary of Safety Analysis The modification provides a more reliable and accurate means of monitoring CVCS temperature. The diesel-backed redundant heat tracing will provide a continuous stand-by power source which will automatically provide heating upon loss of primary system.
DC 81-119I NUREG-0696 Short Term I & C Project SPDS CRTs Shift Supervisor Console STA Consoles Installation Unit 2 This design change installed a shift supervisor console and a workstation on each unit for the shift technical advisor to provide improved communications and Emergency Response Capability within the main control room.
Summary of Safety Analysis The modification provides a separate source of plant ' status and information,
. therefore increasing overall plant safety.
DC 83-48 New Laundry Facility Unit 1 & 2 This design change installed a new laundry facility based on the use of wet-washing machines and electric dryers. The new laundry facility is located in a new building
, east of the Unit 2 containment and north of the service building.
Summary of Safety Analysis The modification improves overall operations by providing an efficient and economic means for processing radioactive protection clothing, boots, and respirators.
DC 84-01 Emergency Switchgear Room lialon System Unit 1 & 2 This design change installed a fixed fire suppression system according to Appendix R,Section III G.3.
Two separate IIalon fire suppression were installed; one in the Emergency Switchgear and Relay Rack Rooms for each unit.
Summary of Safety Analysis The installation of the lialon Fire Protection System supplements the existing fire protection measures. It provides a means for reducing the probability of losing safety related equipment due to a fire.
Page 12 FACILITY CIIANGES TilAT DID NOT REQUIRE NRC APPROVAL (continued)
DC 84-24 Addition of Emergency Lighting Unit 1 & 2 This design change installed 8-hour battery powered emergency lights in certain critical task areas to meet the requirements of Appendix R.
Summary of Safety Analysis The modification installed emergency lights essentially identical to existing emergency lights. It improves the ability to operate safe shutdown equipment locally after a fire and allows access / egress to areas of critical tasks.
DC 84-75 Appendix R - CCW and R11R Circuit Isolation Unit 1 & 2 This design change provides a means of isolating control room wiring and provides a means of operating Residual IIcat Removal pumps and Component Cooling Water pumps remote from the control room. A transfer switch and a control switch was installed on each pump's breaker compartment at the switchgear.
Summary of Safety Analysis The modification ensures operation of the CCW and RilR systems are available during a fire in the control room. This will result in continued operations necessary to achieve cold shutdown following a fire.
P:ge 13 TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL DECEMBER,1985 NONE DURING Tills REPORTING PERIOD TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL DECEMBER,1985 NONE DURING THIS REPORTING PERIOD n
'i Page 14 OTHER CHANGES, TESTS AND EXPERIMENTS' DECEMBER,1985
-NONE DURING THIS REPORTING PERIOD.
4 i
1 1
i r
f 1
1 1
L I
1 4
4 I
l I
/
l-i.
l f
4 i
r f
4 4
s k
I L
t i-t I
I
. -, - - ~ -,, -. - - -. -,,.,,,,-
,-.<-._-,,,,n,~n---.-,n,
- /,
P3' 2E-06 Page 15 VIRGI:IA PO:IR SURRY PG E S3.I'IG:
CHI 2 TIS"'RY FIPOPC DECEMBER 19 86 I
0'IT 10. 1 U;IT 10. 2 AtGJYSIS F7XIFJ MIFIbD: AVERAGE
!AXIFIN MIhT D AVERP2 4
Gross PM h_M., uCi/ml 1.32E+0 1.03E-1 1.02E+0 1.41E-1 2.06E2 9.98E-2 Susatxiad Solids, p:2n 0.00 0.00 0.00 0.00 0.00 0.00 Gross Tritiun, uCi/mi 2.05E-1 1.09E-2 1.00E-1 2.37E-1 1.0992 1.20E-1 131 Iodine
, uCi/ml 2.71E-2 1.17E-2 1.75E-2 2.48E-4 5.73E5 1.26E-4 i
131 131 i
I j7 0.48 0.17 0.27 0.25 0.05 0.13
' Ehf.rocen, ec/ke 36.6 25.4 31.1 29.6 25.5 27.7
'ithiun, c:r::
0.81 0.55 0.74 1.37 1.17 1.28 Boron-10, c;zn*
58 43 52 147 124 134 Oxvoen, (D.O.), azn 6-0.005 60.005 6 0.005 6 0.005
- 0.005
- 0.005 Chloride, arn f0.010 40.010 4 0.010 4 0.010 40.010
- 0.010 oH @ 25'C 6.89 6.57 6.79 6.60 6.41 6.49
- Baron-10 = Obtal Boron x 0.196 l
Rag.pss: No Lithitra added to either unit.
4 Cat bed in service as follows:
Unit 1 12-12-85 frm 1740 to 2056 4
12-31-85 frcrn 0500 to 0720 Unit 2 12-13-85 frcrn 1730 to 2027 I
r
}
_._._,m_
' )
DESCRIPTION OF ALLINSTANCES WHERE '
THERMAL DISCHARGE LIMITS WERE EXCEEDED DECEMBER,1985 NONE DURING THIS REPORTING PERIOD 1
1 t
E 4
1 J
1 l
i 1
Page 17 FUEL MANDLINj UNIT 4 1
DECEMBER,1985 DATE NO. OF ANSI NO.
NEW OR SPENT TUEL SHIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL None Durir g This Reporting Period
- r
'I g
Page 18 FUEL MANDETNG 2
UNIT 6 DECEMBER,1985 DATE NO. OF ANSI NO.
NEW OR SPENT FUEL SHIPPED /RICCXXKK ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL Shipg_ent_
Assembly umber 1
131041B 3.2
< 5 mair.
^
W49 LM0418 W17 LM040T
- 12 12-09-85 W27 LM0411 IV38 LM0417 W28 LM0419 "13 12-13-85 W44 LM041X WO2 1A1040P W10 LM0410 12-20-85
- 14 W52 LM0426 W19 LM040V W16 LM040U
- 15 12-27-85 W46 LM0415 W23 LM040C ir ir W45 LM041R 3.2
< 5 m/hr.
- g Page-19 2
PROCEDURE REVISIONS THAT CIIANGED THE OPERATING MODE DESCRIBED IN THE FSAR DECEMBER,1985 i'
NONE DURING THIS REPORTING PERIOD I
I i
f 4
1 I
k i
e r
D I
g 1
q f
l, I
r i
i b
r I
i
~f
.e,
Page 20 DESCRIPTION OF PERIODIC TESTS WlIICII WERE N_OT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICA110NS DECEMBER,1985 NONE DURING Tills REPORTING PERIOD
=
6
r
- O..'t Page 21 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 DECEMBER - 1985 NONE DURING THIS REPORTING PERIOD MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED FOWER PERIODS UNIT NO. 2 DECEMBER - 1985 NONE DURING TIIIS REPORTING PERIOD
-W
r 0
0 s
VIRGINEA ELECTMIC AND POWHH COMi*ANY Hacnwonn,VswoixrA unust W.L.Srawaar w.2".'lo".' ","..
January 13, 1986 J
Mr. Maurice R. Beebe Serial No.86-012 Office of Resource Management N0/JBL: ace U.S. Nuclear Regulatory Conunission Docket-Nos. 50-280 Washington, D. C. 20555 50-281 License-Nos..DPR-32 DPR-37
Dear Mr. Beebe:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of December,. 1985.
Very truly yours,
-=_
W. L. Stewart Enclosure (3 copies) cc:
Mr. James M. Taylor, Director (12 copies)
Office of Inspection and Enforcement Dr. J. Nelson Grace (1 copy)
Regional Administrator Region II 4-Mr. Donald J. Burke (1 copy)
NRC Resident Inspector Surry. Power Station 1
1 l
4 1
8 e
-