ML20210F969
| ML20210F969 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/18/1986 |
| From: | Carey J DUQUESNE LIGHT CO. |
| To: | Harold Denton, Tam P Office of Nuclear Reactor Regulation |
| References | |
| 2NRC-6-098, 2NRC-6-98, TAC-64378, NUDOCS 8609250313 | |
| Download: ML20210F969 (2) | |
Text
_. _ _
'A@
M 2NRC-6-098 Beave Vall
- o. 2 Unit Project Organization Telecopy (
643-Ext.160 P.O. Box 328 Sept. 18, 1986 Shippingport, PA 15077 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Secondary System Rad Monitoring Change Gentlemen:
As notified by a reviewer, our Amendment 12 change to Table 7.5-1 is in error since it does not describe the number of secondary system rad monitors currently included in plant design. Attached is our proposed revision to Table 7.5-1 to correct this error. This change will be included in Amendment 13.
DUQUESNE LIGHT COMPANY By
(/JUd. Caref Sr. Vice President RWR/ijr NR/ RAD / MON /CHNG Attachment cc:
Mr. Peter Tam, NRC Project Manager Mr. L. Prividy, NRC Resident Inspector l
pd I I 8609250313 860918 PDR ADOCK 05000412 A
PDR 0
gf e
BVPS-2 FSAR TA3LE 7.5-1 (Cont)
Qualification Number Indicator Implementation Power Variable Ranre/St atus Tyne / Cat egorv Environmental Se t smie of Channels Device Date (13)
Suceiv Conformance Primary Plant 0-350 in A1, D2 Yes Yes 3 per plant
' 2 meters fuel load IE Yes DWST level I channel on plasma display I recorder Auxiliary feedwater 0-400 gpm A1, 81, D2 Yes Yes 2 per loop 6 meters fuel load IE Yes flow 3 recorders Cors exit 200-2300*F A1, Bl. C1 Yes Yes
.51 All channels on fuel load IE Yes t emperature plasma display; I channel on meter and recorder I
Contaiheent area 10*-10 R/Hr A1, B1, B2, E2 Yes Yes 2 per plant 2 meters fuel load IE Yes radiation level 2 recorders (high range) le*P
~2 3
Secondary system 10 -10 p Ci/CC A1,.82 E2 Yes Yes 1 per plant 1 meter fuel load IE Yes radiation 1 recorder RCS subcooling 200*F sub-A2, B2 Yes Yes
' 2 per plant 2 channels on fuel load IE Yes cooling to plasma display; 35*F super-I channel on meter beated and recorder Control rod in/Dut 53 No No 1/ rod I status complete non-1E Yes position light / rod reutron flux 6
Lower range I to 10 CPS B1 Yes Yes 2 per plant 2 channels on fuel load IE -
. Yes plasma display; I channel on recorder Uppear range 0-2002 of power 51 Yes Yes 2 per plant 2 channel on fuel load IE Yes
. plasma display; I channel on on recorder Amsndsect 12 2 of 11 June 1986
<