ML20210F953
| ML20210F953 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/31/1985 |
| From: | Grant N, Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| L-86-16, NUDOCS 8604020315 | |
| Download: ML20210F953 (18) | |
Text
_
t AVERAGE DAILY UMT POWER LKvat i
DOCKET NO.
50 M n UMT Turkey Point 3 DATE January 14, 1986 N.W. Grant COMPLETED gy TELEPHONE (3051652-3675 MONTH Decamber. 1985 DAY AVERAGE DAILY POWER LEVEL (M We Met) 12/ 1/85
-14 12/ 2/85
-9 12/ 3/85
-7 12/ 4/85
-17
~
12/ 5/85 110 12/ 6/85 377 12/ 7/85 381 12/.8/85 486 12/ 9/85 692 12/10/85 690 12/11/85 693 12/12/85 691 12/13/85 688 12/14/85 686 12/15/85 698 12/16/85 699 12/17/85 699 12/18/85 696 12/19/85 694 12/20/85 698 12/21/85 700 12/22/85 702 12/23/85 700 12/24/85 700 12/25/85 695 12/26/85 700 12/27/85 704 12/29/85 702 12/29/85 700 12/30/85 674 12/31/85 304 h5 8604020315 851231 k
PDR ADOCK 05000250
\\\\g R
r i
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 1/10/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.
UNIT NAME: TURKEY POINT UNIT 3 2.
REPORTING PERIOD: DECEMBER 1985 3.
LICENSED THERMAL POWER (MWT):
2200 4.
NAMEh 4TE RATING (GROSS MWE):
760 5.
DESIGN EmE?TRICAL RATING (NET MWE):
693 6.
MAXIMUM DEPEw2ABLE CAPACITY (GROSS MWE):
700 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____
666 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD 744 8760 114609.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
644.6 5404.9 79077.7
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE _________________
633.7 5227.9 78406.9
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1302579 11076010 162205521
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _
428480 3615850 51871545
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) ___
405808 3412376 49109581
- 19. UNIT SERVICE FACTOR _____________________
85.2 59.7 68.4
- 20. UNIT AVAILABILITY FACTOR ________________
85.2 59.7 68.5
- 21. CAPACITY FACTOR (USING MDC NET) 81.9 58.5 65.9
- 22. CAPACITY FACTOR (USING DER NET) 78.7 56.2 61.8
~23.
UNIT FORCED OUTAGE RATE _________________
14.8 15.0 7.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________
l of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50 250 UN3T NAME Turkey Point Unit #3 DATE 1 14-R6 COlWLETED BY M u crw REPORT MONTH Derombor-1985 TELEPHONE (1nsi 869 1675 3E 3
Eh Licensee Eg Cause & Corrective N..
DJte k
3g 4
255 Event U
Action to
$5 5
jgg Report 8 mV Prevent Recurrence H
g 6
19 851130 F
110.3 B
4 ZZ VALVEX Unit #3 shutdown to inspect motor operated valves grease and change the grease where uncertainties existed.
Other inspections of the f40V's to ensure compliance with the tested configuration were conducted. The unit then returned to full power operation.
20 851205 F
0.0 A
5 HH PutiPXX Unit 3 operated at reduced power in order to repair a steam generator feed pump thrust bearing. The unit then returned to full power operation.
i 2
3 4
F-Forced Reason:
Method:
Exhibit G - Instructions
% Scheduled A Lyuipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensae C-Refueling 3 Automatic Scram.
Event Report iLER) File (NUREG-D-Regulatory Rest ictson
%Other (E splain) 01611 1.-Operator Training a trense I samination F. Administ rative 5
G Operatumal i e rur (liplain t s _ /.o ao 44 eve.,..,#
Eshibit 1 Same Source pp/77)
Il-Other I E xplam)
2 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME Turkey Point Unit #3 DATE 1 14 M C
Y ?>
+
REPORT MONTH norombar 1985
.!3 licensee
[ =t, 4
Cause & Corrective No.
Date
{
3g g
jg5 Event u?
Action to
"[
$5 5
j ;F3 g Report *
'N U Prevent Recurrence 6
21 851230 F
0.0 A
5 250-85-44
~ZZ ZZZZZZ A failed rod position indication (RPI) caused a unit runback. The unit then operated at reduced power to repair a steam generator feed pump oil pump. The RPI repair was postponed until a January 1986 outage.
22 851231 F
0.0 A
5 HH HTEXCH The unit operated at 50% power to repair four leaking condenser tubes.
The unit then returned to full power operation.
I 2
3 4
F Forced Reaum:
Method:
Exhibit G - Instructions
% Scheduled A Lyuipment Failure (Esplain)
I Manual for Preparation of Data B-Maintenance or Test.
2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event Report tlER) Fde iNUREG-D Regulatory Restriction
$4)ther IExplam)
Ol6lI l.-Operator Training a btense f sanunation F Administrative 5
G Operator..I I nor il splain) 4-., to4. Asevc.,..,4 Eslobit I Sanx Source t'8/77 )
Il-Other il splami
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-250 UNIT Turkey Point Unit #3_
DATE
' January 14, 1986 COMPLETED BY N. W'. Grant TELEPHONE (305) 552-3675 REPORT HONTH December, 1985 See-the " unit shutdowns and power reductions" report.
r AVER AGE DAltY UMTPOWER f,EvrL DOCKE7 NO. 50-251 UNIT Turkey Point 4 DATE January 14, 1986 N.W.'Jran t C06FLETEDSY 11LEf110NE @i)552-3675 MONTH December. 1985 DAY AVERACE DAILY POWER LEVEL (MWe Net) 12/ 1/85
~
12/ 2/85 12/ 3/85 12/ 4/85 684 12/ 5/85 685 12/ 6/85 083 12/ 7/85 685 12/.S/85 686 12/ 9/85 6
12/10/85 684 12/11/85 684 12/12/85 681 12/13/85 6M 12/14/85 0
12/15/85 688 12/16/85 2
12/17/65 690 12/18/85 691 12/19/35 9I 12/20/85 9
12/21/85 39' 12/22/85 96 12/23/85 12/24/85 6
12/25/85 691 12/26/85 12/27/85 6
12/28/85 12/29/85 12/30/85 690 12/31/85 3 g
s
~t OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 1/10/86 COMPLETED BY N. W. GRANT TELEPHONE 305/552/3675 OPERATING STATUS
- 1. UNIT NAME TURKEY POINT UNIT 4
- 2. REPORTING PERIOD DECEMBER 1985
- 3. LICENSED THERMAL POWER (MWT):
2200 4.
NAMEPLATE RATING (GROSS MWE):
760 5.
DESIGN ELECTRICAL RATING (NET MWE):
693 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
700 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
666 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
4 9.-POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) ________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 8760 108341.0
- 12. NUMBER OF HOURS RFACTOR WAS CRITICAL _____
730.1 7916.8 77635.1
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE _________________
717.7 7855.0 75095.1
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
32.1
' 16. GROSS THERMAL ENERGY GENERATED (MWH) ____
1565959 16907623 159037729
- 17. GROSS ELECTRICAL ENERG7 GERERATED (MWH) _
512205 5450175 50642572
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 487776 5177927 47961208
- 19. UNIT SERVICE FACTOR _____________________
96.5 89.7 69.3
- 20. UNIT AVAILABILITY FACTOR ________________
96.5 89.7 69.3
- 21. CAPACITY FACTOR (USING MDC NET) 98.4 88.8 68.1
- 22. CAPACITY FACTOR (USING DER NET) 94.6 85.3 63.9
- 23. UNIT FORCED OUTAGE RATE _________________
3.5 9.1 6.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
REFUELING, 11 WEEKS, 1/10/86
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
esp le 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Turkey Point Unit #4 DATE 1-14-86 REPORT MONDI December. 1985 COMPLETED 8Y N.
u _ n ra n t TELEPHONE (305) 552-3675 3
Ek Licensee Eg 4
Cause & Corrective N...
- 1) ate h
3g 4
2s&
Event g?
3 Action to
$5 5
j di g Report 2r mO U
g Prevent Recurrence d
l 22 851123 F
26.3 8
4 ZZ ZZZZZZ Unit #4 shutdown to inspect motor operated valves grease and change the grease where uncertainties exist-ed. Other inspections of the M0V's to ensure compliance with the tested configuration were conducted. The unit then returned to full power operation.
I 2
3 4
f Forced Reasim :
Method:
Exhibit G - Instructitms N Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparation of Data fi Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automate Scram.
Event Report iLERI FileINUREG-D-Regulatory Restriction
@-Other I Explam) 0161)
I -Operator Training & Utense Isamination f Administratave 5
G Operati.nal I esor IliplainI c_ toao 44evc.,..,#
Eshibis 1 - Sana-Source l'8/77)
Il-Other ( E splain)
SUMMARY
OF OPERATING EXPER.TENCE DOCKET NO.-
50-251 UNIT Turkey Point Unit #4f DATE January 14, 1986 COMPLETED BY N. W. Grant TEI.EPHONE (305) 552-3675 REPORT I40 NTH December, 1985 See the " unit shutdowns and power reductions" report.
,, ~,, -, -, - -
AVER AGE DAILY VNIT POWER LEyst DOCKET NO.
50-11; UNIT St. Lucie Unit 1 DATE January 14, 1986 COMPLETED BY ll.W. Grant TELEMIONE (305)552-3675 MONTH nocomhorlong DAY AVERACE DAILY POWER LEVEL (MWe Net) 12/ 1/85
-2 12/ 2/85
-2 12/ 3/85
-2 12/ 4/85
-2 12/ 5/85
-2 12/ 6/85
-2 12/ 7/85
-2 12/ S/85
-2 12/ 9/85
-2 12/10/85
-2 12/11/85
-2 12/12/85
-2 12/13/85
-3 12/14/85
-3 12/15/85
-2 12/16/85
-3 12/17/85
-3 12/18/85
-3 12/19/95
-4 12/20/85
-16 12/01/95
-21 12/22/85
-23 12/23/85
-27 12/24/85
-27 12/25/85 128 12/26/85 361 12/27/85 640 12/28/85
-14 12/29/85
-8 12/30/85
-11 12/31/85
-29
OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 1/10/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.
UNIT NAME:
ST. LUCIE UNIT 1 2.
REPORTING PERIOD DECEMBER 1985
- 3. LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830 6.. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
872 827 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) ________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 8760 79152.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
129.4 7134.7 56156.0
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 205.3
- 14. HOURS GENERATOR ON-LINE _________________
66.8 7068.6 55802.1
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) ____
98138 18754731 140892267
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _
29860 6197850 46056505
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) ___
21068 5871444 43433792
- 19. UNIT SERVICE FACTOR _____________________
9.0 80.7 70.5
- 20. UNIT AVAILABILITY FACTOR ________________
9.0 80.7 70.5
- 21. CAPACITY FACTOR (USING MDC NET) 3.4 81.2 68.9
- 22. CAPACITY FACTOR (USING DER NET) 3.4 80.8 67.4
- 23. UNIT FORCED OUTAGE RATE _________________
58.7 1.4 4.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 01/01/86
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-335 UNIT NAME St-Iurio I! nit #1 DATE l-14-86 COMPLETED BY N_W_ Grant REPORT MONT}t Deromber. 1985 TELEPHONE (105);57 1675 "5
Licensee E r, b,
Cause & Corrective
!E 3
h Ek k
No.
- 1) ate g
3g g
jg5 Event u '?
Action to
$5 5
j di g Report 2r iE C Prevent Recurrence 6
03 851020 S
582.3 C
4 RC FUELXX The unit was returned to service from a refueling and scheduled maintenance outage.
04 851225 S
0.0 H
5 ZZ ZZZZZZ During the return to full power operation, power was reduced for physics testing, core barrel analysis and feedwater pump oil change.
.r
. 05 851228 F
94.9 A
2 CJ VALVEX The unit was shutdown to repair a pressurizer code safety valve and leaking PORV.
I 2
3 4
F Forced Reason :
Method:
Exhibit G. instructions
% Stheduled A-Equipment Failure (Emplain)
- 1. Manual for Preparation of Data R. Maintenance or Test 2-Manual Scram.
Entry Sheets for Ucensee C Refueling LAutomatic Scram.
Event ReporI(LER) FileINUREG-I). Regulatory Rest:ictson
$0ther (Esplain) 016!)
I -Operator Training & bcense Isammation F-Ad minist ra tive 9,
5 l
G Operatnwul I voir li'splain) 4.
Aoao Asevc.,..,#
E shibit !. Same Source t'8/77) 18-01her f l.splaml I
[
SUMMARY
OF OPERATING EXPERIENCE O :
DOCKET NO, 50-335 UNIT St. Lucie Unit #1 DATE Janu'a ry 14, 1986 COMPLETED BY N. W. Grant TELEPHONE (305)552-3675 REPORT MONTH December, 1985 See the-" unit shutdowns and power reductions" report.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety val.ves during the report month.
1 4
q
,_.,y.,..__y
~e_
,,,__.,--._m_--,
AVER AGE DAILY UNIT PoWf 4 tsyst DOCKET NO. _50-389 UNIT St. I ncia unit 2 DATE January 14, 1986 COMPLETED BY N.W. Grant TELENIONE (305)552-3676 December, 1985 MONTH DAY AVERACE DAILY POWER LEVEL IMWe Net) 12/ 1/85 847 12/ 2/85 818 12/ 3/85 841 12/ 4/85 853 12/ 5/S5 854 12/ 6/85 854 12/-7/85 855 12/ 8/85 856 12/ 9/85 856 12/10/85 854 12/11/85 854 12/12/85 853 12/13/85 853 12/14/85 851 12/15/85 854 12/16/85 855 12/17/85 857 12/18/85 856 12/19/95 857 12/20/85 856 12/21/85 857 12/22/85 856 12/23/85 854 12/24/85 852 12/25/85 852 12/26/85 419 12/27/85
-a 12/28/85
-6 12/29/85
-27 12/30/85 608 12/31/85 856
.9 OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 1/10/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.
UNIT NAME:
ST. LUCIE UNIT 2
- 2. REPORTING PERIOD: DECEMBER 1985
.3.
LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850 5.
DESIGN 'LifCTRICAL RATING (NET MWE):
830 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
882 837 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
A SINCE LAST REPORT, GIVE REASONS:
- 9. P5EER tEvEL i5 ssiCs EEEisiCTE5; iF Asi isEf ssET_-------- :_---- :_--------
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 8760 21049.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
671.1 7442.7 18048.9
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE _________________
661.4 7371.7 17572.3
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) ____
1750638 19287968 44646533
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _
586730 6456980 14906680
- 18. NET ELECTRICAL ENERGY GENERATED iMWH) ___
555558 6108631 14071043
- 19. UNIT SERVICE FACTOR _____________________
88.9 84.2 83.5
- 20. UNIT AVAILABILITY FACTOR ________________
88.9 84.2 83.5
- 21. CAPACITY FACTOR (USING MDC NET) 89.2 84.6 83.4
- 22. CAPACITY FACTOR (USING DER NET) 90.0 84.7 82.3.
- 23. UNIT FORCED OUTAGE RATE _________________
11.1 13.3 10 8
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-389 UNIT NAME St. Lucie Unit #2 DATE l-14-86 REPORT MONTH December. 1985 COnet ETED BY NW (;ra n t TER.EPHONE (305) 552-3675 5?
3 h Ek Licensee 5%
Cause & Corrective No.
Date g
3g g
jgg Event U '2 Action to
$E 5
j C, g Report *r 85 0 Prevent Recurrence H
6 13 851226 F
82.6 A
2 pending IB CRDRVE A shutdown was required to repair a control rod drive mechanism. After the plant was brought back on line, power was held at a reduced level for secondary chemistry control and calibration of nuclear instru-mentation.
I 2
3 4
r Forced Reason :
Methnt:
Exhibit G. Instructitms s Stheduled A 1quipment Failure (Emplain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction
$ 0ther l Esplam) 0161)
I Operator Training & I; tense i sanunation F Admamstrative 5
G Operatnmal I iror (liplain t s _ toao u s w.,..c#
E stubit I - Same Sourse t'8/ 7 7 )
11 Other il splam t
7
SUMMARY
OF OPERATINC EXPERINECE DOCKET NO.
50-389 UNIT St. Lucie Unit #2 DATE January 14 986 COMPLETED BY N. W. Grant TELEPHONE (305)552-3675'
- REPORT HONTH December, 1985 4
See the " unit shutdowns and power reductions" report.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV.or safety valves du' ring the report month.
s
\\
L
\\
b 9
s 1
3
?
l
\\
w
P.O. BOX 029100MI AMI, F L 33102 M %,
FLORIDA POWEH & LIGHT COMPANY January 15,1986 L-86-16 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
Attached are the December 1985 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.
Very truly yours, Group,V c resident Nuclea nergy JWW/NWG: mis Attachment cc:
Dr. J. Nelson Grace Harold F. Reis, Esquire PNS-LI-86-13/1
(,'
',\\
PEOPLE.. SERVING PEOPLE