ML20210F861
| ML20210F861 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/06/1987 |
| From: | Mcdonald J TENNESSEE VALLEY AUTHORITY |
| To: | Harold Denton NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20210F865 | List: |
| References | |
| NUDOCS 8702110179 | |
| Download: ML20210F861 (8) | |
Text
_,
.[
a - p TENNESSEE VALLEY AUTHORITY Watts Bar Nuclear Plant P. O. Box 800 Spring City, Tennessee 37381 February 6, 1987 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention:
Mr. Harold Denton, Director of Nuclear Reactor Regulation In the Matter of the Application of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 EMPLOYEE CONCERK9 TASK GROUP (ECTG) provides a listing of the report numbers, the related employee concerns, and the previous submittal dates if applicable. To assist you in your review of these reports Enclosure 2 provides a comparison between the ECTG Writer's Guide recommended report format and the transmitted reports. transmits the final element reports for 3 elements addressing Sequoyah Nuclear Plant employee concerns in the Engineering category.
As indicated by the report cover sheets, these reports have completed final review by the Senior Review Panel and the Employee Concern Task Group management. With these final reports, all employee concerns related to Sequoyah have been addressed for Engineering Subcategory 21800, Pipe Stress Calculations; and Engineering Subcategory 24100, Cable Terminations and Splices.
Please telephone Martha Martin at (615) 365-3587 (Watts Bar) if you have any questions.
Very truly yours, TENNESSEE VALLEY AUTHORITY d$
j%
J. A. Mcdonald Watts Bar Nuclear Plant Site Licensing Manager cc (See page 2.):
I h6 L 9 8702110179 870206 PDR ADOCK 05000327 P
PDR An Equal Opportunity Employer
m _ _
.r 2
\\
k.S.NuclearRegulatoryCommission cc (Enclosures):
Mr. James N. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C.
20555 l
U.S. Nuclear Regulatory Commission Region II Attn:
Mr. Gary Zech 101 Marietta Street
.WW, Suite 2900 Atlanta, Georgia 30323 Nr. B. J. Youngblood, Project Director PWR Project Directorate #4 Division of PWR Licensing - A U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Room 440, 5 Story Phillips Bethesda, Maryland 20814 3596T i
l l
l l
t
1
ENCLOSURE 1 Page 1 of 1 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUNBER ISSUE
)
Engineering 21807 IN-85-039-003 Acceptance Criteria for n
(Final)
Overlap Area of Calculations NOTE: Initial report transmitted 12/22/86.
Engineering 23803 OW-85-007-002 Cable Tray Overfills (Final)
IN-85-186-003 and Wall and Floor WI-85-100-011 Penetrations IN-85-798-004 IN-86-238-003 IN-86-232-002 IN-85-688-N05 IN-85-919-001 IN-85-432-002
}
IN-85-688-001 IN-85-856-003 PH-85-003-023 IN-86-028-002 IN-85-312-001 IN-85-734-001 IN-86-262-001 IN-85-832-001 IN-85-207-001 IN-85-519-001 WI-85-100-015 NOTE: Initial report transmitted 12/24/86.
Engineering 24102 J LH-85-004 Cable Termination and Splices (Final)
PH-85-003 Crisp Connections NOTE:
Initial report transmitted 12/22/86.
3596T
1 l
I I
l l
l l
l
[
i l
l
ENGINEERING CATEGORY Enclssura 2 Page 1 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT 1.0 Issue.
1.
Characterization of Issue (s)
Characterization 2.0 Summary 9.
Discussion, Findings and Conclusions 3.0 Evaluators Cover Sheet Information 4.0 Evaluation 8.
Evaluation Process Process
5.0 Findings
9.
Discussion, Findings, and Conclusions 6.0 Root Cause (Collective Significance)MW
- Overall Root Cause will not be considered at this report level.
7.0 Attachments /
Attachments as required List of Concerns Other items included 2.
Have issue (s) been identified in Engineering Element in another systematic Reports analysis?
3.
Document nos., tag nos.,
locations or other specific descriptive identifications stated in element.
4.
Interview files reviewed 5.
Documents reviewed related to the element 1992T
ENGINEERING CATEGORY Enclssure 2 Page 2 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT Other items included in Engineering Element 6.
What regulations, licensing Reports commitments, design require-(cont'd) ments, or other apply or control in this area?
7.
List requests for information, meetings, telephone calls, and other discussions related to element.
9
1 i
b l
8 4
i l
l l
l l
l I
l
- l.,,,.,,.
,m
'--m*'-
- - - - -