Text
T 4
s OPERATING DATA REPORT DOCKET NO.
50-244 DATE Jmumrv 14. 1986 COMPLETED ?-Y bU
?!Abr b-Anirew E. McNfmda TELEPilONE (315) 524-4446 Ext. 301 OPERATING STATUS Ginna Station
- 1. Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Notes
- 2. Reporting Period:
hm 1985 Reactor power level reduction 1520
- 3. Licensed Thermal Power (MTt):
to approximately 98.5% on 490 12/11 and continued to the
- 4. Nameplate Rating (Gross MTc):
470 end of the report period due
- 5. Design Electrical Rating (Net MTe):
to abnonnal train feedwater
- 6. Maximum Dependable Capacity (Gross MTe):
490 Ptap vibrations.
- 7. Maximum Dependable Capacity (Net MTe):
470
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level to Thich Restricted, If Any (Net MTe):
- 10. Reasons For Restrictions, If Any:
This Month Yr. to-Dare Cumulative
- 11. Ilours in Reporting Period 744 8.760.00 141.120.00
- 12. Number of Iloors Reactor Tas Critical 744 7.838.46 108.287.17_
0 0
1 637.55*
- 13. Reactor Reserve Shutdown llours 744 7.732.25 106.024.63
- 14. Ilours Generator On Line 0
0 8.5*
- 15. Unit Reserve Shutdown llours 1 119 144 11 436_864 147.722.625
- 16. Gross Thermal Energy Generated (MTil) l'7. Gross Electrical Energy Generated (MTil) 375.569 3.807.449 48 ?o2.856
- 18. Net Electrical Energy Generated (MTil) 357.270 3,620.296 45.803.317 100%
88.27%
75.13%
- 19. Unit Service Factor 100%
88.27%
75.14%
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 102 17%
87.93%
70.67%
- 22. Unit Capacity Factor (Using DER Net) 102.17%
87.93%
70.67%
0%
1.8 %
7.3 %
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Annual Refmlina and Maintenance - Februarv 8.1986 anoroxinately 49 days duration.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cumulative total ecumnncino January 1. 1975 REV 4M eMg 8604020071 851231
[P l
\\l p
PDR ADOCK 05000244 R
6' 4 7. t Q.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE Januarv 14. 1986 COMPLETED BY M d <._ M K M,. 2 m_
' Andrew E. McNim(ra TELEPHONE
-1 (315) 524-4446 Ext. 301 at Ginna MONTH December, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
485 17.
479 2.
485 18.
478 3.
483 19.
478 4.
483 20.
478 5.-
485 21.
478 6.
484 22.
478 7.
485 23.
478 8.
484 24.
479 9.
484 25.
478 10.
483 26.
478 11.
481 27.
477 12.
479 28.
478 13.
479 29.
478 14.
479 30.
478 15.
479 31.
478 16.
479 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
r D(X:Kl{T NO.
50-204 ilNITNAME _.E. ENNA NUCLEAR PO_WER PLANT -
R UNIT SNUTDOWN AND POWER REDUCTIONS DATE --fJENU 14 _J986 COMPLI{TI{D llY sbdC M
Andrew E. McNamara REPORT MONTil DECEMBER 1985 TEl.EPflONE (315) ' 524-4446 Ext. 301 Ginna Station n
5 oI Licensee g.,
Cause & Corrective No.
Da te
{
j;j m
e 2
]o g j Event
- 4 g,j Action to s
gz g
- Ji e Report #
- j
!u Prevent Recurrence 2
g u
O Reactor Power level was reduced to approximately 98.5% on 12/11 and continued to the end of the report period to allaviate abnonnal main feedwater pmp vibrations.
l 1
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Adminis trative G-Operational Error (Explain) 3 E
uv os.u, ll-Other (Explain)
Exhibit I - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE January 14., 1986 COMPLETED BY M M c // / f d 6 h A / i'
" ' Andrew E. McNafnfra TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH December, 1985 The reactor power level was reduced to - 98.5% on 12/11/85 and continued to the end of the report period to alleviate main feedwater pump vibrations.
4
.O GINNA STATION o
MAINTENANCE REPORT
SUMMARY
DECEMBER, 1985 During the month of November, routine maintenance and inspections were completed.
Major safety related work included:
1.
Replace Hydrogen Regulator to Volume Control Tank 2.
Primary / Secondary Snubber Inspection 3.
R-13/14 Radiation Monitor Pump - P.M. Inspection 4.
- 1-B Charging Pump Inlet Valve Repair 5.
- 1 SPING Monitor Pump - P.M.
Inspection 6.
- 1-D Service Water Pump Motor - Major overhaul 7.
Tech. Support Center Diesel - P.M. Inspection 8.
Rebuild Charging Pump Plunger Assemblies 9.
- 1-G Aux. Building Exhaust Fan - Install 10.
Troubleshoot MOV-9703A Limitorque Drive - Faulty Torque Switch 11.
Annual Calibration of Radiation Monitoring System 12.
Annual Calibration of H Recombiner Instrumentation &
2 Controls 13.
Annual Calibration of Safety Related Instrumentation
?
1
g OPERATIONS' SUMMAW DECEMBER, 1985 The reactor power level was reduced to 98.5% on 12/11 ~and remained there through the end of the report period to allevia.te excessive main feedwater pumps vibrations.
Reactor Power Level (%)
Net Ger:erator Output (MWe)
Eerig.d High Idltw Hiqh Low 12/1 - 12/7 100 100 488 477 12/8 - 12/14 100
~98.5 486 477 12/15 - 12/21
~98.5
-98.5 480 476 12/22 - 12/28
~98.5
-98.5 481 476 12/29 - 12/31
~98.5
-96.5 480 476 l
l l
- 0.. -
- 71,
._,...f ia:
R_^jgm~f
,+,y-f
[?
D[
.r ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001' 02 i. u eu
.... ce ne,,. 5 4 e.2 7 00 GINNA STATION January 14, 1986 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555
Subject:
Monthly Report for December, 1985 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of December, 1985.
Very truly yours, Stanley Spector Superintendent of Ginna Production SMS/eeg Attachments cc:
Dr. Thomas E. Murley NRC (1)
/ f
'\\\\