ML20210F033
| ML20210F033 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 12/31/1985 |
| From: | Musolf D, Myrabo A NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8604020006 | |
| Download: ML20210F033 (5) | |
Text
._
OPERATING DATA REPORT DOCKET NO.
50-263______.
DATE i-2-86.___
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS l
INotes l
- 1. Unit Name :
__-_____________________Monticetto l
l
- 2. Reporting period: __________-_-______ DECEMBER I
l
- 3. Licensed Thermal Power (MWt):
____________1670 l
I
- 4. Nameplate Rating (Gross MWe):
_____________569 l
l L
- 5. Design Electrical Rating (Net MWe): _____545.4 l
1
- 6. Maximum Dependable Capacity (Gross MWe): __564 l
l
- 7. Maximum Dependable Capacity (Net MWe): ____536 l-___________-_____________l
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
t
- 9. Power Level To Which Restricted, If Any (Net MWe): __ N/A___________________
- 10. Reasons For Restrictions, If Any:
__N/A_____________________________________
___--________--_____________a______________--______
-_--__-~--_----__---
l i
l This Month Yr.-to-Date Cumulative
~~
1.1. Hours In Reporting Perlod
_____744
_____8760
____127153
~
- 12. Number Of Hours Reactor Was Critical
___744.0
___8163.0
__ 98249.2
- 13. Reactor Res'erve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hours Generator On-Line
___744.0
___8030.6
__ 96017.3
- 15. Unit Reserve Shutdown Hours
_____0.0
______0.0
_______0.0
- 16. Gross Thermal Energy Generated (MWH)
_1224946
_13059696
_146254242
- 17. Gross Electrica L Energy Generated (MWH) __420064
__4466224
__49651277
~
- 18. Net Electr ica l Energy Genera ted (MWH)
__404128
__4286986
__47472039
- 19. Unit Service Factor
__100.0%
___ 91.7%
____ 75.5%
- 20. Unit Availability Factor
__i00.0%
___ 91.7%
____ 75.5%
- 21. Unit Capacity Factor (Using MDC Net)
_ 101.3%
___ 91.3%
____ 69.7%
- 22. Unit Capacity Factor (Using DER Net)
__ 99. 6%-
___ 89.7%
____ 68.5%
- 23. Unit Forced Outage Rate 0.0%
0.6%
4.9%
24.-Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
_ May 1, 1986 _ 1986 refueling outage - 54 days _________________________
l
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:____________
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved l
INITIAL CRITICALITY t
INITIAL ELECTRICITY COMMERCIAL OPERATION B604020006 851231 PDR ADOCK 05000263 R
PDR Iy
b NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263______
DATE 1-2-86 ___
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ DECEMBER _.____
12-1-85 to Power operation.
Unit in end-of-cycle coastdown status 12-31-85 on 12-31-85.
i Note: Power operation defined as essentially 100% of rated power except for weekend Load drops for specified surveitLance testing.
4 a
T
- =
-m w,-
--*--4
AVERAGE DAILY UNIT POWE0 LEVEL DOCKET NO.
50-263______
UNIT MonticelLo__
DATE 1-2-86 ___
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ DECEMBER _______
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i
__________535.___________
17
__________551____________.
2
__________548____________
18
__________548____________
3
__________551____________
19
__________549____________
4
__________549____________
20
__________547____________
5
__________.,51[___________
21
__________460____________
6
__________550_________:___
22
__________547____________
7
__________551____________
23
__________552____________
8
__________504____________
24
__________550____________
l 9
__________554____________
25
__________.52____________
l l
10
__________553____________
26
__________552____________
11
__________551____________
27
__________554____________
l l
12
__________551____________
28
__________550____________
i 13
__________548____________
29
__________479____________
14
__________551____________
30 55'-___________
15
_ _ _ _ _ _ _ _ _ _5 5 0 _ _ _ _ _ _ _ _ _ _ _ _ -
31
__________550____________
16_
__________550____________
INSTRUCTIONS On this format, List the average daily unit power Level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
I' 0
UNIT SilllIDOt.'NS AND POWER REDUCTIONS DOCKET NO.
50-263 UNIT N AME Monticello DATE.
1-2-A6 COMPLETED BY A. L. Myrabo REPORT MONTil DECEMBER TELEPHONE 612/295-5151 r.
'E u. 5 5
=
~
3a b.,
Cause & Correctne N.
l)3:e h
f
? f *-i I '#"I
- 3. 3 E3 Acason to e
E2 2
52
- 2
- f Repur :
v2 L pretent Recurrence 2:
~:
6 NONE 5
h l
3 4
F: Forced Reason.
Method:
Esinbii G - Instructions 5: Schedute,I A. Equipment FailureIE.splain) 1-Manual for Preparation of Data Bataintenance of Tes 2-Manual Seram-Entr> Sheets for Licensee C. Refueling 3 Automatic Sstam.
Esen Report LLER) File sWREG-D. Regulatory Restriction 4-Other ( Esplain) 0161) l'.-Opeutor Ts.iining A 1.isene l'.uminaison F Admumiraine 5
G Operational Eiror IEsplami Esinbis 1 - Sanne Source 49/77) 110;her (Esplam)
O-Off Northem States Power Company 414 Nicollet man Minneapohs, Mannesota $$401 Telephone (612) 330 5500 January 8, 1986 Director, Office of Resource Management U S Nuclear Regulatory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report December, 1985 Attached are twelve copies of the Monthly Operating Report for December, 1985 for the Monticello Nuclear Generating Plant.
D d b--
David Musolf i
Manager of Nuclear Support ervices DMM/MMV/ dab cc: Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman U -
.. s,. g/ og,, e f,/ D '
as.g31GU j Attachment a
/.
S g.D i
i i
t i