Text
&c.d 3/n/rt "o
\\
o Q R.fi-/d b /mi
'Af Duquesne Lidit 23cjgy 2)9211960 Nuclear Construction Division ftEsio*,"[p*l'is*2$s*"8 ** 8""'
Ma ch 19 6 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:
Mr. Richard W. Starostecki Division of Project and Resident Programs
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 10CFR50.55(f) Evaluations of PSAR QA Program Organizational Changes Gentlemen.
The purpose of this letter is to provide the attached six 10CFR50.55(f) evaluations of organizational changes to the Quality Assurance Program descrip-tion (Section 17, BVPS-2 PSAR).
As described in these evaluations, the changes will aid the Duquesne Light Nuclear Group as the Beaver Valley Unit No. 2 project evolves from con-struction to startup and will provide the organizational freedom necessary for the QA Program to be implemented in accordance with tha requirements of 10CFR50 Appendix B.
These changes do not reduce the commitments in the program description previously accepted by the NRC.
DUQUESNE LIGHT COMPANY 6
By
(
- 3. V. Carey Vice President JJS/jdw NR/PSAR/ CHANGES Attachment cc: NRC Document Control Desk. (w/a)
(){
Mr. G. Walton, NRC Resident Inspector (w/a)
Mr. P. Tam, Project Manager (w/a) g t-8603270053 860307-PDR ADOCK 05000412 A
United States Nuclear Regulatory Commission Mr. Richard W. Starostecki 10CFR50.55(f) Evaluations of PSAR QA Program Organizational Changes Page 2 COMMONWEALTH OF PENNSYLVANIA SS:
COUNTY OF BEAVER On this
/
day ofL
/N#/)
,/
O
, before me, a Notary Public in and for said Commonwealth and County, personally appeared J.
J. Carey, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing S ubmi t tal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his kno, ledge.
Cb
/
bDM Notary Public r
1:.
p) a
. p ?;;U OCT. 23.1989 r.:: Mtics of Nearles peuw.
gtttA g. FATTORE. eTARY PUSHC gipplNGPORT BORO, BEAVit COUNTY g; CO2Mit$ log gIPiRE3 OCT. 23.1989 WemAer. Pennsykania Associati:n cf Pf','S
United States Nuclear Regulatory Commission Mr. Richard W. Starostecki 10CFR50.55(f) Evaluations of PS AR QA Program Organizational Changes Page 3 JJS/jds Attachment bec: C. E. Ewing
- w/o/attachnents J. D. Sieber
- w/o/ attachments R. J. Swiderski
- w/o/ attachments N. R. Tonet
- w/o/ attachments L. E. Arch
- w/o attachment T. D. Jones
- w/o/ attachments C. O. Richardson, Jr., SWEC (5) - w/o/ attachment A. A. Dasenbrock, SWEC
- w/o/ attachment J. Sutton, SWEC
- w/o/ attachments NCD File
- w/ attachment l
d 4
1.
DUQUESNE LIGHT COMPANY NUCLEAR GROUP Quality Assurance Unit Evaluation - 10CFR50.55(f)
SUBJECT:
BVPS-2 PSAR, Section 17 1.1 Page Affected by the Change
^
17.1-3A 1.2 Identification of the Change Figure 17.1-3A, attached, has been revised to reflect current titles and reporting assignments pertaining to the Unit 2 functional organization.
1.3 Reason for the Change These organizational changes will aid the Duquesne Light Nuclear Group as the Beaver Valley No. 2 Unit Project evolves from construction to startup.
1.4 Basis for concluding that the revised program. incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B and the Safety Analysis Report Quality Assurance Program description commitments pre-viously accepted by the NRC:
}
The administrative changes provide the organizational freedom necessary for. the QA Program to be implemented in accordance with the requirements of 10CFR50, Appendix B.
D Reviewed By:
Date: I b 4
Approved By:
((
52, Date: M7/fg
O e
Nuclear Group Vice President I
Special Nuclear Projects Vicar President I
Nuclear Technical Assistant l
l Engineering &
Start-up &
Quality Construction Operations Assurance Manager Manager Manager Figure 17.1 - 3A Duquesne Light Company BVPS-2 Project Beaver Valley Power Station - Unit 2 Preliminary Safety Analysis Report
x DUQUESNE LIGHT COMPANY NUCLEAR GROUP Quality Assurance Unit Evaluation - 10CFR50.55(f)
SUBJECT:
BVPS-2 PSAR, Section 17 2.1 Page Affected by the Change 17.1-6 4
2.2 Identification of the Change Insert the following sentence in the middle of the last section of 1
Paragraph 17.2.lA:
"As BVPS-2 nears completion Duquesne Light may assume
~
certain responsibilities previously delegated to others."
2.3 Reason for the Change Engineering and construction work of Beaver Valley Unit No. 2 is nearing completion.
A 2.4 Basis for concluding that the revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B and the Safety l
Analysis Report Quality Assurance Program description commitments pre-viously accepted by the NRC:
The administrative change provides for the organizational freedom necessary for the QA Program to be implemented in accordance with the requirements of 10CFR50, Appendix B.
4 Prepared By:
m Date: 2.-5-6(,
2[Lfll Reviewed By:
Date:
1 I
Approved By:
[
gofse.
Date:
7 ((
u
. ~ - ~
w
'e DUQUESNE LIGHT COMPANY NUCLEAR GROUP Quality Assurance Unit t
Evaluation - 10CFR50.55(f)
SUBJECT:
BVPS-2'PSAR, Section 17 l
3.1 Page Affected by the Change j
17.1-7 3.2 Identification of the Change a
Revise the last sentence of the fourth section of Paragraph 17.2.1.lA.to l
read'as follows:
"The Administrative Procedures of organizations delegated responsibilities in the Quality Assurance Program are re-j viewed by the Quality Assurance Unit for compliance with l
the requirements of the Quality Assurance Program."
3.3 Reason for the Change The change made more accurately describes the Administrative Procedure review process.
3.4 Basis for concluding that the revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B and the. Safety Analysis Report Quality Assurance Program description commitments pre-i viously accepted by the NRC:
The administrative changes provida the organizational freedom necesscry for the QA Program to be implemented in accordance with the requirements of 10CFR50 Appendix B.
a Prepared By:
c( h Date:
- 2. W.
\\
1.fsh Reviewed By:
Date:
Approved By:
/,
L4 Date: Y7[f27 W
, - -. _, =
DUQUESNE LIGHT COMPANY NUCLEAR GROUP
' Quality Assurance Unit Evaluation - 10CFR50.55(f)
SUBJECT:
BVPS-2 PSAR, Section 17 4.1 Pages Affected by the Changes 17.1-9, 17.1-2A 4.2
_ Identification of the Changes Refer to Figure 17.1-2A, attached, for the following two changes.
A Deputy Quality Assurance Manager position has b blished to assist the Quality Assurance Manager een temporarily esta-QA/QC of startup activities and interfaces with the QA SurHe is responsib Section.
veillance Vendor Surveillance is responsible to the Dir Control for coordinating and conducting Duqueector, Operations Quality spections at the vendor plants.
sne Light Company in-4.3 Reasons for the Changes:
The temporary position of " Deputy QA Manager" startup assistance only.
It will be reevaluated at a later datewas deemed necessary for The Director of Quality Control (construction be directly responsible for Vendor Surveillancactivities) will no longer e.
4.4 Basis for concluding that the revised progra continues to satisfy the crits.ria of 10CFR50m incorporating these changes Analysis Report Quality Assurance Program de, Appendix B and the Safety viously accepted by the NRC:
scription commitments pre-The administrative changes provide the organi for the QA Program to be implemented in accordazational freedom necessary i
I i
nce with the requirements Prepared By: _
b h.
Date:_3-9-B(,
x Reviewed By:_
_ Date:
I/3 L Approved By:
A Date:
N
~ - - - - ' ' - - ' - '
a QA Unit Manager Deputy QA Manager Secretary Startup Director Director Director Director Director Quality Operations Inservice QA Engineering /
QA Operations Control Quality Control Inspection Procurement i
SQC Vendor Surveillance l
Figure 17.1-2A Legend Duquesne Light Company l
Quality Assurance Unit Lines of Responsibility Beaver Vall.ey Power Station - Unit 2
- - - - Lines of Communication Preliminary Safety Analysis Report i
l DUQUESNE LIGHT COMPANY NUCLEAR GROUP Quality Assurance Unit Evaluation - 10CFR50.55(f)
SUBJECT:
BVPS-2 PSAR, Section 17 5.1 Page Affected by the Change 17.1-9 5.2 Identification of the Changes The Duquesne Light Company Project Management Committee is chaired by the Duquesne Light Company-Vice President, Nuclear Group. Members of the com-mittee include appropriate unit heads from the Nuclear Group. Meetings are conducted quarterly or at the specific request of any member, as
~
necessary.
5.3 Reason for the Changes Due to the company reorganization, the Nuclear Group Vice President has responsibility for both BVPS #1 and BVPS #2 as do the Nuclear Group Unit Managers. Various other meetings are being held as Unit #1 personnel are becoming more involved in Unit #2.
5.4 Basis for concluding that the revised program incorporating the changes continues to satisfy the criteria of 10CFR50, Appendix B and the Safety Analysis Report Quality Assurance Program description commitments pre-viously accepted by the NRC:
The administrative changes provide the organizational f reedom necessary for the QA Program to be implemented in accordance with the requirements of 10CFR50, Appendix B.
Prepared By: ~
[ b.
Date: 2-5-%
m b
^
Date:
Reviewed By:
42,[ [ff7' Approved By:
4.s6 Date:
l
]
i~
DUQUESNE LIGHT COMPANY s
NUCLEAR GROUP,
Quality Assurance Unit i
Evaluation - 10CFR50.55(f)
J
SUBJECT:
BVPS-2 PSAR, Section.17~
6.1 Page Affected by the Change 17.1-1A 6.2 Identification of the Changes The position " Executive Vice President" has been removed from Figure 17.1-1A, attached, since he has no Unit 2 responsibilities. The position " Chairman of the Board and President" has been separated into the two new positions i
shown.
6.3 Reason for the Changes These changes are a part of an orderly transition of management responsi-bilities prior to the Chairman of the Board's mandatory retirement in 1987.
6.4 Basis for concluding that the revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B and the Safety Analysis Report Quality Assurance Program description' commitments pre-viously accepted by the NRC:
The administrative changes made still provide for the organizational freedom necessary for the QA Program to operate.in accordance with the requirements of 10CFR50. Appendix B.
l i
Prepared By:
Date:
- 2. 4 L
- fIL Reviewed By:
Date:
Approved By:_
[ ( 44 1
Date:
fo/f4
)
)
?
President Chairman of and the Board Chief Executive Officer l
I Administrative Power Supply Nuclear Croup Services Group
---~--~~~~~~~~~~~~~
Group Vice President Vice President Vice President Vice President of Special Nuclear Projects l
I I
I I
I l
l Nuc lea r
.imt Construction Nuclear Operations Nuclear Services Quality Assurance BVPS-2 General Services Materfals F.ngineerinA General Manager General Manager Manager Project General Manager Managenwn t Manager s.cncral Manaaer i
Figure 17.1-1A t.eaend Duquesne Light Company Organisation for Quality Assurance Lines of Responsibility Beaver Valley Power Station - Unit 2 Preliminary Safety Analysis Report
-Lines of Communication
-