Log # TXX-6260 File # 10110 903.9 M
- llll' ':=lll:
L 3
1ESELECTRIC February 2, 1987
%illiam G. Counsil 1:m utiw ila hesidem U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 PIPE SUPPORT INSTALLATIONS SDAR: CP-86-63 (INTERIM REPORT)
Gentlemen:
By letter logged TXX-6027, dated October 16, 1986, we notified you of a reportable item involvingJipe support construction deficiencies.
This is a follow-up interim report on a reportable item under provisions of 10CFR50.55(e).
Currently, the requirements for the Hardware Validation Program (HVP) have been incorporated into the applicable quality inspection procedures and personnel training has been performed to assure consistency and accuracy in the implementation of this program. Unit 1 inspections are currently underway 4
with an estimated completion date of September 1, 1987. Unit 2 inspections will be performed as part of the final inspections required for support certification. We anticipate sub,mitting our first quarterly status report by April 20, 1987.
Very truly yours, W. G. Counsil BSD:amb c - Mr. Eric H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV Q20gy{ 73 5