Advises That Based on Review of Request to Eliminate Plasticity Index (PI) Requirement from Const Specs for Cover & Liner Matl,Nrc Concludes That Elimination Would Reduce Confidence in Selected Matl.Umtrap Review Form Encl
ML20210C289
Person / Time
Issue date: 04/27/1987
From: Hawkins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James Anderson
ENERGY, DEPT. OF
References
REF-WM-64 NUDOCS 8705060143
Download: ML20210C289 (2)


Text

r l

DISTRIBUTION DockSt File WM-64 PDR/DCS WM-64/TT0/87/04/21/0 DBangart, RIV T01sen DGillen, WMLU LLW Branch, WMLU URF0 r/f APR I71987 FMiera, OR URF0:TTO Docket No. WM-64 040WM064810E James R. Anderson, Project Manager Uranium Hill Tailings Project Office U.S. Department of Energy Albuquerque Operations Office P. O. Box 5400 Albuquerque, New Mexico 87115

Dear Mr. Anderson:

My staff has completed their review of the request to eliminate the Plasticity Index (PI) requirement from construction specifications for cover and liner materials.

The URF0 staff concludes that for a design element, the PI should not be eliminated from the construction specification, and to do so would only reduce confidence in selected material for construction of the cover and liner.

Should you have any comments or questions, contact Tom Olsen of my staff on FTS 776-2813.

Sincerely, Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office Region IV

Enclosure:

UMTRA Document Review Form Case closed:

040WM064810E

.J 0h:

0FC :

UR

(:

NAME : T01sen

EH kins

_ _ _ _ _.. _ _ _ _ _ _/ l v DATE :87/04/25 77:

0705060143 870427 PDR WASTE WM-64 PDR

s ULTRA DOCUMENT REVIEW FORM SECTION 1 Site:

Lakeview, Oregon Document:

Request to Delete Plasticity Index Requirement from the Specifications for Radon Barrier and Liner Construction at Lakeview Oregon Geotechnical Commentor: Thomas T. Olsen, Project Manager 3

The URF0 staff has completed its review of DOE's request to eliminate the Plasticity Index (PI) requirements from material specifications at the Lakeview, Oregon, UMTRA project.

The URF0 staff concludes that the deletion of the PI requirement is not in the best interest of the project.

It is URF0's position that deletion of the PI will serve only to lower the confidence level of the material selected for the cover and liner.

)