CPERATIONS StM1ARY i -
AUGUST, 1986 The Unit er.tered the Annth of August at 100% power producing 820 MWe gross electr! cal ganeration. RC-P-lC (reactor. coolant pump) continues to operate with increased #1 seal leakoff flow. Operation of the pump continues with Westinghoose guidance. The plant continued at 100% power the entire month with gross acnoratioc of 830 MWe at the close of this reporting period.
MAJ0k SAFETY RELATED MAINTENANCE I
i Durirg the nnnth of August, TM1-1 perforraed no inajor mainterance items on safety related equipwjnt,
)
q I
+
9 1
1 1
t 4
i l
1 I
I l
4 i
a
{
G609100252 060331 PDR ADOCK 0D000209 R
PCR f
IEDY
///
i
OPERATING DATA REPORT DOCKET NO.
5t>-289
\\
DATE 06/32/86 COMPLETED BY Ql. Sm/th TELEFif0NE 217} 948-?351 OPERATING STATUS NOTES
- 1. UNIT NAME:
THEEE MILE ISLAND UNIT 1
- 2. REPORTING PERIOD:
AUGUST
,1986.
- 3. LICENSED THERMAL POWER (Mirr) :
2535.
- 4. NAMEPLATE RATING (GROSS MWE) :
871.
- 5. DESIGN ELECTRICAL RATING (NET MWE) :
819.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
824.
l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
776.
(
- 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICIED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
(
THIS MONTH YR-TO-DATE CUMMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.
5831.
105168.
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 4805.7 38622.3
- 13. REACTOR RESERVE SHUTDOWN HCUES 0.0 990.8 1874,1
- 14. HOURS GENERATOR ON-LINE 744.0 4749.6 37783.5,
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GPOSS THERMAL ENERGY GENERATED (MW3) 1880564.
11893003.
91243400.
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 613726.
3916582.
20306735.
20328821.
- 18. NET ELECTRICAL ENERGY GENERATED (HXH)
- 578924, 3677109.
- 19. UNIT SERVICE FACTOR 100.0 81.5 35.9 )
- 20. UNIT AVAILABILITY FACTOR 100.0 81.5 35.9
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.3 81.3 34.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 95.0 77.0 32.9
- 23. UNIT FORCED OUTAGE RATE 0.0 5.1 61.1
- 24. SHUTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACil Refuelinq Outaqe, November 1. 1986 - 4 to 6 months
- 25. IF Si!UT DOWN AT END OF REPOFT PERIOD, ESTIMATED DATE OF STARTUP:
p -; -
,s*.
q
' R-AVERAGE DAILY UNIT POW 2R LEVEL f
e
'i.
DOCKET NO; 50-205 UNIT
't MI-1 PATE 8/31/86 COMPLETED BY {,W, Sdth' l
TELEPHONE (717) 94i3-8551 MONThz -AUGUST DAY' AVERAGE DAILY FOWER LEVEL DWI AVERAGE DAILY FOWER LEVEL (MWE-liET)
(MWE-NST) 1 776.
17 773.
2
~773.
le 773.
j.
3 774.
19 774.
l.
4 778.
20 777.
5 776.
21 780.
6 775 21 779.
7 774.
23 775.
t 8
773.
24 778.-
l 9
- 771, 25 786.
10 773; 26 783.
11
- 775, 27 776.
12
- 783, 28 788.
f
.13 784.
29 792.
14 731.
~30 7J9.
15 777.
31 787.
16.
770.
,g 7
l i
't 3
-)
.f f
j-3 i
I 4
I
DOCKETleo. J0-289 UNIT SHUIDG'WNS W POWEK REDUCng UNIT NAME _M'l -
_ [_
DATE 60.1/%
CGierLEifD 8'r. C.W. Smyth etEPORTWMD _ AllGilST_.~
TILtFNONE 'IlD MH-8451 s
o:
o Yn{)'
E**
d"'
5%
EL Cause a Corictus, i t --
la t<
Ll f,2s
$.? E p"I A. eve :.,
E""'
) *% *?
Na 0 ie3*.
s n o m m e,,,,,c, i ; j s-hePC ;
j *
- i cri J )
o, 6,
s
'I l
s
~~~%_
m_
1
_~ ~
u 1
1 J
p 4
~
)
l g
NO SHffTDOWit 1,
t 3
4 I
1 1
-l i
i l
l 1
1 2
3 4
F-Forted Reason:
Mecod:
Eshibit G - Instructions
% Stieduled A Fquipment Fadure(Explaia) t-Manual for Prepwaimn of Data B-Maintenance iTest 2-Manual Sersm.
fitsr> Sheeis ibe Licensee C-Refue'.g 0 Autonnue Scram.
Esen Repost tLERI File (NtlRLG.
D-Regulatory Resirkiion 4-Other ( tiriaml 01611 1 -Operator Training & Lkenw I uminaison 5
F-Adnunstraine INfutni I. Smie Source G Operastonal I irus (ITpl.am p iI Other iE spi,smI 6
i Actually used Exhibits F & 11 NUREC 0161
f REFUEL.ING IWORMATION REQUEST 1.
Name of Facility: Three Mile Island Nuclear Station, Unit 1 2.
Scheduled date for next refueling shutdown:
November 1,1986 3.
Scheduled date for restart following refueling:
March 20,1987 4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
Yes If answer is yes, in general, what will these be?
Conversion to 18 month fuel cycle with associated changes to Power Imbalance, Quadrant Tilt and Rod Insertion Limits.
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
No If no such review has taken place, when is it scheduled?
To be determined.
5.
Scheduled date(s) for submitting proposed licensing action and supporting i nformation:
Hoverrber,1986 6.
Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None 7.
The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:
(a) 177 (b) 208 8
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The present licensed capacity is 752.
There are no planned increases at this time.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1991 is the last refueling discharge which allows full core off-load capacity (177 fuel assemblies).
m GPU Nuclear Corporation NggIg7 Pcst Office Box 480 Route 441 South Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Djal Number:
September 12, 1986 5211-86-2157 Director, Office of Inspection and Enforcenent U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk
Dear Sir:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report August, 1986 Enclosed please find two (2) copies of the August,1986 Monthly Operating Report for Three Mile Island Nuclear Station, Unit-1.
Si ncerely, H.-D. 1'ucill Vice President & Director, TMI-1 HDH:DVH:spb cc:
Dr. T. E. Murley Attachments 0015C GPU Nuclear Corporation is a subsidiary of the Goncral Public Utilities Corporation ygG hl t