Text
,
USEC A Global Energy Company July 15,1999 GDP 99-0121 Dr. Carl J. Paperiello Director, Office of Nuclear Material Safety and Safeguards Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Paducah Gaseous Diffusion Plant (PGDP)
Portsmouth Gaseous Diffusion Plant (PORTS)
Docket Nos. 70-7001 & 70-7002 Compliance Plan Status Report INFORMATION TRANSMITTED IN ENCLOSURE 2 IS PROTECTED FROM PUBLIC DISCLOSURE AS CONFIDENTIAL COMMERCIAL OR FINANCIAL INFORMATION AND/OR TRADE SECRETS PURSUANT TO 10 CFR 2.790(d)(1) AND 9.17(a)(4)
Dear Dr. Paperiello:
In the Introduction section of the PGDP and PORTS Compliance Plans, the United States Enrichment Corporation (USEC) committed to provide the United States Nuclear Regulatory Commission (NRC) with periodic reports on the implementation status of the Compliance Plans.
Accordingly, enclosed is the Compliance Plan Status Report for the period of January 2,1999, through June 30,1999. As required by the Compliance Plan, the executive summary portion of the status report contains a listing of Compliance Plan issues that were completed / closed during this reporting period and a listing of Compliance Plan issues that are scheduled to be completed during the next reporting period. Additionally, as required by the Compliance Plan, Enclosures 1 and 2 contain a detailed listing, sorted by noncompliance, of the individual commitments within each Compliance Plan issue.
In accordance with 10 CFR 76.33(e) and consistent with the NRC's Decemi er 18,1995, letter, the information related to Compliance Plan issues A.1 through A.5 for PORTS, and A.1 through A.7 for PGDP is considered to be proprietary commercial and financial information pursuant to 10 CFR j
2.790(d)(1) and 9.17(a)(4) and is exempt from public disclosure. These Compliance Plan issues
{
have been clearly identified as proprietary information in Enclosure 2 to this report.
(ht t' 7 It G diL OQ 9907230288 990715 PDR ADOCK 07007001
/\\
,, C,
- PDR, P [),._
t I
0 t l
6903 Rockledge Drive, Dethesda MD 20817-1818
\\
Telephone 301564-3200 Fax 301-564-3201 http://www.usec.com OfDces in Livermore, CA Paducah KY Portsmouth. OH Washington, DC e
1
r?
Dr. Carl J. Paperiello -
July 15,1999
.GDP 99-0121, Page 2
' Updates to the Executive Summary section of this report are indicated by change bars in the right-hand margin. Ifyou have any questions or require additional information concerning the enclosed report, please contact Russ Wells at (301) 564-3245. There are no new commitments contained in this submittal.
- USEC plans to submit the next Comoliance Plan Status Report to NRC by February 15,' 2000, which will cover the period from July 1,1999, through January 31,2000.
Sincerely,
~
/1 5.A.
)jI Steven A.Toelle 4
Nuclear Regulatory Assurance and Policy Manager
Enclosures:
As stated cc:
NRC Region III Office, Patrick Hiland NRC Resident Inspector - PORTS, David Hartland NRC Resident Inspector - PGDP, Ken O'Brien
-- NRC Special Projects Branch, Robert Pierson
.. NRC Project Manager - PORTS, Yawar Faraz NRC Project Manager - PGDP, Charles Cox DOE Regulatory Oversight Manager, Randall DeVault i
t
{~
7