Submits Info to Identify Preservice Insp Program Criteria & Methodology for Visual Exam (VT-3) of Component Supports Selected for Exam Where Portion of Support Covered/Buried W/ Insulation
ML20210B122
Person / Time
Site: Beaver Valley
Issue date: 01/30/1987
From: Carey J
DUQUESNE LIGHT CO.
To: Harold Denton, Tam P
Office of Nuclear Reactor Regulation
References
2NRC-7-020, 2NRC-7-20, NUDOCS 8702090079
Download: ML20210B122 (2)


Text

e

  • a a

am 3'46 g

2NRC-7-020 Beaver Valley No. 2 Unit Project Organization Telecopy (412) 3 52 Ext.160 I,$,"s'oxe1$"'

January 30, 1987 2

Shippingport, PA 15077 Mr. Harold R. Denton Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. Peter Tan, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 PSI Progran, Insulated Component Supports

REFERENCE:

1)

DLC Letter 2NRC-5-154, dated December 26, 1985 Gentlenen:

The following infonnation is provided to identify the Preservice Inspec-tion Progran Criteria and Methoaology for Visual exanination (VT-3) of conpo-nent supports which were selected for exanination where a portion of the support (within the IWF exanination boundary) is covered / buried with insu-l ation.

The insulation will not be renoved during the PSI exanination, based on the ASME Section XI, IWF 1300(e), which states in part, "Where the mechan-ical connection of a non-integral support is buried within the conponent insu-lation, the support boundary may extend fran the surf ace of the conponent insu-lation provided the support either carries the weight of the conponent or serves as a structural restraint in conpression." An alternative to the code is being utilized to include those supports not otherwise covered by this exenption.

Exceptions to the above will be:

1.

When relevant indications are observed which have been evaluated as unacceptable for continued service and which are observed adja-cent to the portion covered / buried by insulation, the insulation shall be renoved in that area and visual exanination (VT-3) shall be perfonned for the balance of the conponent support to the IWF boundary within the insulated area.

2.

When bulges or insulation distortions are observed in the coupo-nent support contiguous area.

These exceptions will apply when any canponent support has relevant indi-cations, regaroless of the exclusion by IWF 1300(e).

The Acceptance Standards for tonponent supports selected for exanination snall be in conpliance with IWF-3410, Acceptance Standards - Component Support Structural Integrity, ASME Section XI,1980 Edition, Winter 1981 Addenda.

000$k12 t9

. -... =. _..

=._-.

United States Nuclear Regulatory Connission Mr. Harold R. Denton, Director PSI Progran, Insulated Component Supports i

Page 2 i

j The above is considered as an alternative to the ASME XI PSI Progran for BVPS-2, as verbally concurred between DLC and NRR during January.5, 1987 telecon.

DUQUESNE LIGHT COMPANY l

By i

W. W Carey V

Sr. Vice President JJS/ijr l-NR/

ON/SUPP AR cc: Mr. P. Tan, Project Manager Mr. J. Beall, NRC Sr. Resident Inspector Ms. A. Asars, NRC Resident Inspector i

INP0 Records Center NRC Docunent Control Desk i

i i

i l

l i

t i.

(

l i

f ls D_

p

,.., - - ~,,, - -, - -, _,,

., _, _.. _ _.., _...,.., -