ML20210A840
| ML20210A840 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/11/1986 |
| From: | Travers W Office of Nuclear Reactor Regulation |
| To: | Standerfer F GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20210A845 | List: |
| References | |
| CON-NRC-TMI-86-091, CON-NRC-TMI-86-91 NUDOCS 8609170358 | |
| Download: ML20210A840 (1) | |
Text
u
.. s
'^
UISTRIBUTION:
i.._v DN 50-320
"' T NRC PDR Local PDR TMI Site r/f TMI HQ r/f s
DCS September 11, 1986 r
f4RC/TMI 86-091 av MTMasnik CCowgill fCha Docket No. 50-320 er ACRS I
fir. F. R. Standerfer fl own Office Vice President / Director, THI-2 Service List GPU Nuclear Corporation i
P. O. Box 480 Hiddletown, PA 17057
Dear Mr. Standerfer:
Subject:
Recovery Operations Plan Change No. 35 i
Reference:
Letter from F. R. Standerfer to W. D. Travers, 4410-86-L-0129 dated August 18, 1986 (ROP' Change Request 39) g 5
.4 The referenced letter proposed additions to the Recovery Operations Plan q
requirements to include calibration and operability requirements of additional 4
criticality monitors in the reactor building. The change was submitted to support defueling operations.
Based on our enclosed safety evaluation we have concluded that the proposed changes will not present an undue risk to the health and safety of the public.
We therefore approve the proposed changes and are enclosing the amended pages for Recovery Operations Plan Change fio. 35.
j
/
Sincerely, o
ORIGINAL stGNED BY:
Wintom D. Travers 8609170358 860911-William D. Travers PDR ADOCK 05000320 Director P
PDR2 TMI-2 Cleanup Project Directorate
Enclosure:
As stated
.c cc:
T. F. Demitt R. E. Rogan J. E. Frew
- I S. Levin s
J. J. Byrne A. W. !! iller Service Distribution List (see attached)
" * " "...IMI.CP.Q..
..TF
..JM p Imius;g...,A
.. L.S.....Wm Av. rs.
A
../.h.l.86 9////86,
9/,]//8 s:c ronu ns oo-soi nacu o24o OFFICIAL RECORD COPY
_