NOTICE OF VIOLATION Illinois Power Company '
Docket No. 50-461 A[aresultoftheinspectionconductedduringtheperiodOctober22through December 5, 1986, and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1985), the following violations were identified:
1.
Technical Specification 6.2.2(f) requires that the licensee establish controls to limit working hours of Health Physics Staff to not more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any seven-day period, excluding shift turnover time, and requires that any deviations from these limitations be authorized by the plant manager, his deputy, or higher level of management.
Contrary to the above, Radiation Protection Department personnel worked as much as 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> in a seven-day period during October 1986, without the specified management authorization.
This is a Severity Level IV violation (Supplement IV).
10CFR20.408(b)and20.409(dualinvolvedb) reguire that reports be made to the 2.
Commission and to the indivi of the radiation exposures ofeachindividualwhohasterminatedemployment.
Such re wrts are recuired to be furnished within 30 days after the exposure of the incividual has been determined or 90 days after the date of termination of employment or work assignment, whichever is earlier.
final radiation exposure termination reports were Contrary to the above,ithin 90 days after the date of termination of not always furnished w employment or work assignment.
Specifically, during the period from October 1985 through August 1986, at least eleven individuals were not furnished with reports for 94 to 140 days after their dates of emplo pent termination.
This is a Severity Level V violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement (1) corrective action orexplanationinreply, including)foreachviolation:
taken and the results achieved; (2 corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown st /s/87 dfhm g Dated W.
D~. W dr, Chief Emergency Preparedness and Radiological Protection Branch