Submits TMI-2 Cleanup Project Directorate Weekly Status Rept for Wk of 870126-0201
ML20209J342
Person / Time
Site: Crane 
Issue date: 02/02/1987
From: Travers W
Office of Nuclear Reactor Regulation
To: Harold Denton, Miraglia F
Office of Nuclear Reactor Regulation
References
CON-NRC-TMI-87-009, CON-NRC-TMI-87-9 NUDOCS 8702060287
Download: ML20209J342 (3)


Text

y s.

Rf ? '

w;w A

/

w

__ J QNb M

February 2,1987

[d 1,

flRC/THI-87-009 m

~

E MENORANDUM FOR:

liaro1d R. Denton,-Director R

Office of Nuclear Reactor Regulation m,,

b Frank J. Miraglia, Director Division of PWR Licensing-B g

FRON:

William D. Travers Director b"

Tl11-2 Cleanup Project Directorate 3$

SUBJECT:

NRC Ti1I-2 CLEANUP PROJECT DIRECTORATE WEEKLY STATUS T

REPORT FOR January 26 - February 1,1987 1.

.DEFUELING Defueling continued using the Airlift Defueling System. The rate of N

defueling using this system is not as great as originally M

anticipated and only one canister was filled during the weak using J

this method. Ilowever, the Airlift Defueling System is considered

,m' useful in picking up material which might not be lifted using other

3 techniques.

2.

ENVIRONMENTAL MONITORING g

US Environmental Protection Agency (EPA) sanple analysis results

?

show that Till site liquid effluents are in accordance with t

regulatory limits, ilRC requirements, and the City of Lancaster g

Agreement.

Till water effluents are sanpled from the station (Units 1 and 2) u discharge and analyzed by EPA. Gama spectrum analyses of the seven daily composited sanples for January 10 - 17, 1987 indicated no 1,.

Till-2 related radioactivity.

i EPA's gama spectrum analysis of the NRC's THI outdoor air sample b

for the period January 20 - 29, 1987 showed no reactor related i'i radioactivity.

The Lancaster water works intake composited seven daily samples January 11 - 17, 1987. The gama spectrum analyzed by EPA showed no reactor related radioactivity.

?

3.

AUXILIARY AllD FUEL HANDLING BUILDIfiG ACTIVITIES b:

Testing of the Auxiliary Sump Transfer and Sump Solidification W

Systems are complete.

f Diesel generator basement scabbling continues.

P Flushing of piping in the i%keup Punp Roou "1B" was completed.

i b'

Robot " Louie 2" was used in scabbling of the Seal Injection Valve y

Roon during the week.

6 L7, 8702060287 870202

.m.. >

DR ADOCK 050003g0

--. -.-~~--

wm>

PDR l

n:c ronu ne no-e0) NRCM 0240 OFFICIAL RECORD COPY

N r

!!arold R. Denton 2

February 2,1987 Frank J.111raglia NRC/TMI-87-009 4.

NRC EVALUATIONS IN PROGRESS Technical Specification Change Request nuubers 49 and 51 and the associated Recovery Operations Plan Change Requests 31 and 33.

Technical Specification Change Request 52.

Technical Specification Change Request 55.

Solid Waste Facility Technical Evalention Report.

lleavy Load Safety Evaluation Report, Rovision 3.

Processed Water Disposition Proposal.

Safety Evaluation Report for Use of Plasna Arc Cutting Torch.

Tenporary Reactor Vessel Filtration Systen Safety Evaluation Report, Revision 3.

Pressurizer Defueling Safety Evaluation Report.

5.

MEETINGS On January 27, 1987, Dr. Willian D. Travers spoke before the Lancaster Kiwanis in Lancaster, PA on the current status of the THI-2 cleanup project.

On January 28, 1987, Dr. Uillian D. Travers gave a prescatation in Rockville, MD on the status of the TNI-2 cicanup project to the Center for Devices and Radiological llealth, Department of Ikalth and llunan Services.

The next reting of the Advisory Panel for the Decontenination of Three Mile Island Unit 2 will be held on February 26, 1987, at the Lancaster Council Chambers, Public Safety Building, 201 Dorth Duke Strcat, Lancaster, PA. The NRC and GPU Nuclear staf fs will respond to the Panel's questions on the liccr,see's proposed disposition of the accident-generated water and on the NRC staff's Draf t Environmental Irpact Statenent on the disposal of accident-generated water.

There will be an opportunity for public cornent.

The ueeting will tentatively begin about 3:30 PH and contiaua into the evening.

The exact tine for the meting will be announced in the future.

Persons desiring to speak before the Panel are requested to contact Mr. Thoaus Snithgall at 717-291-1042, or write to hiu at 21.".3 Marietta Avenue, Lancaster, PA 17603, su that they may be pieced on the necting agcnda, original signed by John Thomas for:

Willian D. Travers Director THI Cleanup Project Directorate

'"C'>

lsunump DATE) nne ronu aia no soi nncu o2d OFFICIR RECORD COPY j

.g -

x-Harold R.'Denton 3

February 2, 1987 Frank J. ftiraglia NRC/Tf!I-87-009

~;,

x.

M ItiTERiiAL DISTRIBUTIO!1

~T.TiTRAL FILE C

^

f(RC PDR

-LOCAL PDR-7'

' EDO

-b OGC A

EPA' w

DOE k,

RI Regional Administrator D-RI Division Directors Public Affairs, RI State Liaison, RI

/"

Tl!I I!Q r/f T!!I SITE r/f Till-2 Project Section File Till-1 Resident Office (5) v Till Cleanup Project Directorate (14)

I L

f$

t

'_k' b

?

I t

l' L'

l-n

(.cerice >.T.MI.CPC T.M. I.C.P.D.

.T.M. I l

..T.M.I.C D

.%994.

..CCw9 r.......n....s.......n.. m....

.............l-L, ~ o"* >

2./. 2./.87....... 2./. V.. 87.... 2./. A../.87.....

. 2/.2../.87 L""ff " *f'f " ff' " "f "f 2' O F F l C l A L R E CO R D C O PY

._