ML20209H971

From kanterella
Jump to navigation Jump to search
Order Scheduling Hearing Re Remanded Issue in ALAB-845 on 860922 in Philadelphia,Pa.Served on 860912
ML20209H971
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/11/1986
From: Hoyt H
Atomic Safety and Licensing Board Panel
To:
FRIENDS OF THE EARTH, NRC OFFICE OF THE GENERAL COUNSEL (OGC), PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
CON-#386-674 ALAB-845, OL, NUDOCS 8609160096
Download: ML20209H971 (1)


Text

67'/

1X r'E T H UNITED STATES OF AMERICA CPL NUCLEAR REGULATORY COMISSION ATOMIC SAFETY AND LICENSING BOARD *86 SEP 12 P2 :28 BEFORE ADMINISTRATIVE JUDGES:

0FFai.

. H N M m

Helen F. Hoyt, Chairperson 00CKETito >

Dr. Richard F. Cole fir A NCw Dr. Jerry Harbour EMD SEP 1219?S

)

In the Matter of

)

Docket Nos. 50-352-0L

)

50-353-OL PHILADELPHIA ELECTRIC COMPANY

)

)

(Limerick Generating Station, September 11, 1986 Units 1 and 2)

ORDER (Tine of Hearing Designated)

The hearing on the remanded issue in ALAB-845, scheduled to be held on September 22, 1986 in the Conference Room, Independence. Terrace -

Room 78, Holiday Inn, Midtown, 1305 Walnut Street, Philadelphia, Pennsylvaria 19107, will be begin at 9:00 a.m.

FOR THE ATOMIC SAFETY AND LICEN G B ARD r

av Helen F. Hoyt, Chairper@n' Administrative Judge hbR i

DO K 00352 G

PDR

.