Forwards Draft Revised Alternative Shutdown Sys Procedures, Including Rev 0 to 44.110.20 Re Condensate Storage Tank Level Channel Calibr & Rev 0 to 44.110.21 Re Standby Feedwater Flow Channel Calibr
ML20209H793
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/06/1985
From: Jens W
DETROIT EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20209H799 List:
References
VP-85-0206, VP-85-206, NUDOCS 8511110229
Download: ML20209H793 (2)


Text

., - - - - - -

= - - - - - - - - - - - - - = - - - - -

Wayne H.Jene -

U

??lcO"$$a,ons I DehoiF ra l%O hh Nuclear operations -

November 6, 1985

~

VP-85-0206 Director of Nuclear Reactor Regulation Mr.'B.-J. Youngblood, Chief

', Licensing Branch No. 1 Division of Licensing-U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear-Mr. Youngblood:

~

Reference:

. Fermi 2-a NRC Docket No. 50-341 NRC License No. NPF-43

~

Subject:

Alternative Shutdown System Procedures The atte.ched draft procedures associated with the Alternative Shutdown System are being transmitted for your p

'information as requested by the Fermi 2' Project Manager.

[

All are subject to change, without notice, as testing and walkdown of the. procedures is accomplished.

l-

-All but one of the sixteen procedures associated with l-operation and surveillance of the Alternative Shutdown L

Panel are attached.

Procedure 20.000.18, " Control of the i

Plant from the Dedicated Shutdown Panel" will govetn j'

. operation'of the plant in the event of a fire in the control center complex as indicated in Section 1.1.

Procedure 47.000.83 will be used to test the telemetry associated with the Alternative Shutdown Panel after installation.

Procedure 48.000.05'will be used to conduct a complete test of the Alternative Shutdown Panel after installation.

This procedure will subsequently be modified for conducting the 18 month surveillance required by F

proposed' Technical Specification 4.3.10.2.

[

m u m m al k i

F-

I Mr.'B. J.'Youngblood

~

November 6, 1985 VP-85-0206 Page 2 j

l Procedures 44.110.20 through 44.110.26 will be used for

~ instrument channel calibration required by proposed Technical Specification 4.3.10.1.

Procedure 24.107.03 will

- be used to perform the surveillance tests and valve line-up

- on the Standby Feedwater System.

Also included are the Alarm Response Procedures related to the Alternative l

Shutdown Panel.

The remaining procedure.to perform the Combustion Turbine Generator surveillance in the proposed Technical Specifications will be sent to you upon

{

completion.

Per agreement with Mr. Lynch, we are forwarding three copies of the attachments.

If you have any questions i

regarding this matter, please call Mr. R. L. Woolley at (313) 586-4211.

Sincerely, l

~