Text
.
f-
. Georgia Power Corroany 333 Piedmont Avenue Atianta, Georga 30308 j-Telephone 404 22G6526 Maihng Address.
i.
Post omce Box 4545 Attanta, Georg130302 h
i Georgia Power
- h. :
L T.3ucwa t?e southern es ctnc syste,n e
Manager Nuclear Engrneenng and Chief Nuclear Eng:neer NED-85-824 0275R October 25, 1985 U.S. Nuclear Regulatory Commission Attn: Mr. Bruce Boger Acting Chief, Operator Licensing Branch AR 5221 Washington, D.C.
20555 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 1
NRC DOCKETS 50-424, 50-425 CONSTRUCTION PERMITS CPPR-108, 109 ALVIN W. V0GTLE NUCLEAR PLANT, UNITS 1, 2 OPERATOR-LICENSING EXAMINATION SITE VISIT-REQUIREMENTS THROUGH SEPTEMBER 1989 (GENERIC LETTER 85-18)
Gentlemen:
In response to the subject letter, Georgia Power Company (GPC) requests NRC staff site visits to conduct operator licensing / instructor examinations through September 1989 as indicated on the enclosed schedules.
If the NRC is not able to support our requested schedules, please respond to this office as soon as possible.
1.
Yours Very truly, j
B511110203 851025 gy 4_
PDR ADOCK 05000321 Y
PDR L.T. Gucwa j
[
JJB/blm Enclosure j
t xc: :J.T. Beckham, Jr.
D.0. Foster H.C. Nix, Jr.
4-
.G. Bockhold, Jr.
0p Dr. J. Nelson Grace (NRC-Region II) 9 Senior Resident Inspector-Vogtle L
. Senior-Resident Inspector-Hatch 8
}
Manager, Nuclear Training i
..u._._,.___,._.
c.nc i osu re
' s..,
OPERATOR LICENSING EXAMINATION SCHEDULE Facility E.
I.
Hatch II NRC Region FY 1986 FY 1987 FY 1988 FY 1989 1.
Date 2/17/86 Dateg8/86 Date 12/7/87 Date 10/10/88
- R0 15 3
12 12
- $R0_ _ 2 8
2 2
~
- SRO Upgrade 2
2 2
- Instructor Certification 4
2 2
0
- SRO Limited to Fuel Handling 2.
Date Date6/22/87 Date 6/20/88 Date 6/26/89
- RO 2
3 3
- SRO 8
2 2
- SRO Upgrade 2
2 2
- Instructor Certification 2
0 1
- SRO Limited to Fuel Handling 3.
Date Date Date-Date
- RO
- 5R0
- SRO Upgrade
- Instructor i -
Certification
- SRO Limited to Fuel Handling Please indicate initial cold license examinations by placing an asterisk (*)
l by the date. Please indicate examinations intended to extend an operator's i
[-
licensetoasecondorsubsequentunitwithtwoasterisks(**)(e.g., Unit One is in operation and Unit Two is approaching fuel load.
Three R0 candidates with no previous license are to be examined on both Units One and Two and five RO candidates with Itcenses on Unit One are to be examined to j
extend their licenses to Unit Two.
Indicate (2/15/85. RO 3.5**)).
a
,e *..
REQUALIFICATION EXAMINATION SCHEDULE Facility E.
I.
Hatch NRC Region II FY 1986 FY 1987 FY 1988 FY 1989
.a 1.
Date__9/30/8 6 Date 9/30/87 Date 9/30/88 Date 9/30/89 2.
Date Note 1 Date Note 1 Date_ Note 1 Date Note 1 3.
Date Date Date__
Date 4,
Date__
- Date_
Date Date Note 1 - PLANT HATCH WILL USE SEGMENT EXAMS AS EACH SEGMENT OF REQUALIFICATION PROGRAM IS COMPLETED (4 PER YEAR).
ANNUAL SIMULATOR EXAMINATIONS WILL BE COMPLETED AS INDICATED.
THE REVISED PLANT HATCH REQUALIFICATION PROGRAM IS CURRENTLY
. IN REVIEW PROCESS.
l I
i i
l l
(
r.fic usurg I
' s...
OPERATOR LICENSING EXAMINATION SCHEDULE Facility A.W. V0GTLE NRC Region 11 FY 1986 FY 1987 FY 1988 FY 1989
- 6-16-86 WRITTEN
- 10-13-86 WRITTEN 1.
Date *7-21-86 SIM & ORAL Date *11-17-86 Date 2-8-88 Date 2/89 SIM & ORAL
- RO J 20 g**
10
- SRO 30 30 35**
10
- SRO Upgrada finstructor Certification 4
- SRO Limited to Fuel Handling 2.
Date Date 2-9-87 Date 8-8-88 Date 8/89
- RO 20 10 10
- SRO 1
12 10
- SRO Upgrade finstructor Certification A
4
- SRO Limited to Fuel Handling 3.
Date Date_ A-1n-87 Date Date
- RO 9s**
- SRO v**
iSRO Upgrade I
- Instructor Certification
- SRO Limited to L
Fuel Handling i
Please indicate initial cold license examinations by placing an asterisk (*)
by the date.
Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**) (e.g., Unit One is in operation and Unit Two is approaching fuel load. Three RO candidates with no previous license are to be examined on both Units One and Two and five RO candidates with licenses on Unit One are to be examined to i
extend their licenses to Unit Two.
Indicate (2/15/85, RO 3.5**)).
(
h I
i
- -. -.. - - - -. -. - ~. - - - -
... ' o...
ll
- 4.
4 -
- REQUALIFICATION EXAMINATION SCHEDULE Facility A. W. Vogtle NRC Region II 1
FY 1986 FY 1987 FY 1988 FY 1989 l
l 1*
1.
Date_
Date 12-8-86 Date 12-14-87 12/88 Date
.1 Date 3/89 2.
Date Date 3-9-87 Date 3-14-88 1
j-3.
Date Date 6-8-87 Date_ _ 6-13-8 8 Date 6/89 4
j 4.
Date Date. 9-14-87 Date 9-12-88 Date__
9/89 d
p
(
i i
(
l ef*
- i t
I i
l i
4 m.
/,
-