ML20209H561

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to Course of Action Submitted 850910,Rev 3 to Auxiliary Feedwater Pump Turbine Overspeed Trip Throttle Valve Problem & Rev 3 to Toledo Edison - Pilot-Operated Relief Valve (PORV) Operation
ML20209H561
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/31/1985
From: Williams J
TOLEDO EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20209H568 List:
References
1202, NUDOCS 8511110169
Download: ML20209H561 (15)


Text

,;- - .

bo TOLEDO

%ms EDISON Docket No. 50-346 JOE WILUAMS. JR w ve. s n m r -

License No. NPF-3 l$l$l*$

Serial No. 1202

' October 31, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

The enclosed materials comprise Revision 3 to the Davis-Besse Course of Action submitted to you on September 10, 1985 (Serial No. 1182). A list of effective pages and document control receipt containing instructions for revising this document are included in the revision package. The document control receipt must be returned to Toledo Edison Company to ensure compliance with our document control procedures.

Very truly yours,

~

/

VJM: ah Enclosures cc: DB-1 NRC Resident Inspector i

l yung81%6 S

hob C

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 L. ,