ML20209G590
| ML20209G590 | |
| Person / Time | |
|---|---|
| Issue date: | 09/16/1985 |
| From: | Stello V Committee To Review Generic Requirements |
| To: | Bernero R, Cunningham R, Jordan E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), Office of Nuclear Reactor Regulation |
| References | |
| REF-GTECI-A-49, REF-GTECI-RV, RTR-REGGD-01.099, RTR-REGGD-1.099, RTR-REGGD-1.99, TASK-A-49, TASK-OR NUDOCS 8509190579 | |
| Download: ML20209G590 (2) | |
Text
_ _ _ _ _ - _ _ _ _ _ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ - _ - _ _ _ _ -
Y' p ug%,
UNITED STATES
.gi NUCLEAR REGULATORY COMMISSION r
I 3
U7 i W ASWNGTON. D. C. 20555 k
1 sw, e w l
1 i
f FWRATI:M FOR:
Robert Bernero, NRR Edward L. Jordan IE RicFard E. Cunningham, NMSS Denwood F. Ross, RES Clemens J. Heltenes, Jr., AE00 Joseph Scinto, ELD I,
FROM:
Victor Stello, Jr., Chairman Comrittee to Review Ceneric Requirements 51R ECT:
CPGR MEETING UO. 81
,i I
The Cocrdttee to Review Generic Recuirements (CRGP) will meet on Wednesday.
l Septerh r 25, 1985, from 12:30 - 5:00 p.m. in Room 6507 MhBS. The agenda is as felicus:
- G. Arlotte (RES) will brief the CRGP concerning the l
12:30 - 1:30 p.t.
existing and fcrthcoming guidance associated with the decomissioning rule (Category 2 item).
i I
G. Arlotto (RES) will present for CRGE review, proposed i
1:30 - 2:30 p.m. -
Revision 2 to Pegulatory Guide 1.99. Radiation Danace to Reactor Vessel Materials. A copy of the proposed Regulatory
[
Guide, which was considered by the CRGR at Meeting No. 79, 1985 memorandum from f
was enclosed in a September 6,(Category 2 iten).
f V. Stello to the CRGR members T. Speis (NRR) will present for CRGR review the proposed i
2:30 - 4:00 p.n.-
Pegulatory Guide entitled " Guide for Licensee Preparation and NRC Staff Review of Plant-Specific Analysis Required
{
i by the Pressurized Thermal Shock Rule, 10 CFR 50.61 l
f (US!A-49 Resolution). A copy of the proposed Pegulatory i
Guide was enclosed in a September 6,1985 memorandum f rom L
V. Stello to the CRGR menbers (Category 2 iten).
P.Baer(IE)willpresentforCRGRreview,theenclosed I
4:00 - 5:00 p.n. -
l proposed IE Bulletin entitled " Steam Binding of Auxiliary l
Feedwater Purps" (Category 2 iten).
l 1
If a CRGR nember cannot attend the meeting, it is his respersibility to l
assure that an alternate, who is approved by the CRGR Chairman, attends the t
- meeting, I
Persons making presentations to the CRGR are responsible for (1) assuring f
that the information re uired for CRGR review is provided to the Comnittee
' afh l i
1 (CRGR Charter - IV.B), 2) coordinating and presenting views of other
/
)
@i r
l 4
i SEP 16 rd i
i i f
i offices, (3) as appropriate, assuring that other offices are represented during the presentation, and (4) assuring that agenda modifications are coordinated with the CRGR contact (Walt Schwink, x28639) and others involved with the presentation. Division Directors or higher management should attend meetings addressing agenda items under their purview.
I i
In accordance with the ED0's March 29,1984' memorandum to the Comission con-cerning " Forwarding of CRGR Documents to the Public Document Room (PDR) " the
[
enclosure, which contains predecisional information, will not be released to
~
t the PDR until the NRC has considered (in a public forum) or decided the j
matter addressed by the information.
t
)l Original Signed by V. Stello r
Victor Stello, Jr., Chairman Comittee to Review Generic i
Requirements i
Enclosure:
As stated j
cc: SECY Comission (5) j
)
W. J. Dircks i
Office Directors Regional Administrators G. Cunningham t
G. Arlotto l
l T.~ Speis R. Baer
[
l
)
Distribution:
i VStello JRoe JHSniezek TRehm j
RG"R Staff DEDROGR cf JZwetzig EFox JPhilips JHenry i
FHebdon WLittle RErickson Central File i,
PDR(NRG/CRGR) RHernan 7
l I
i
/
j OFG :ROGR/5
- RU /D
- DEDROGR 1
.....:.3..
7......
NAME:WSgtnk tezek
- VStello l
h/85r--------:9//85
, DATE :9/13/85
- 9 1
i
-