ML20209G053

From kanterella
Jump to navigation Jump to search
Supplemental Application to Amend Licenses NPF-11 & NPF-18, Revising Tech Specs to Reflect Mgt Organizational Changes
ML20209G053
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/03/1986
From: Allen C
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20209G058 List:
References
2040K, NUDOCS 8609120357
Download: ML20209G053 (2)


Text

. . - - - .- _ _ _

l

- COnNnenwealth h e 6 ,

\

A' one R-d Nabonal Plaza, Chicago. IEnois Address Reply to: Post Omco Box 767 I

Checa00, Illinois 60600 0767 September 3, 1986 i

5  ;

Mr. Harold R. Denton, Director '

I Office of Nuclear Reactor Regulation j U.S. Nuclear Regulatory Commission Washington, DC 20555 I

i

Subject:

LaSalle County Station Units 1 and 2 Supplemental Information to proposed Amendment to Technical Specification for Facility Operating License NPF-ll and NPF-18 Management Organizational Changes NRC Docket Nos. 50-373 and 50-374 Reference (a): C.M. Allen letter to H.R. Denton dated December 20, 1985.

5 I

Dear Mr. Denton:

pursuant to 10 CFR 50.90, Commonwealth Edison proposed to amend Appendix A, Technical Specification, to Facility Operating License NPF-ll and NpF-18 in Reference (a). This supplemental response is in reply to questions

!' from your staff in a September 2, 1986 telecon. The reviewers concerns are that the words originally submitted were not specific enough to ensure that i

each superintendent only approves overtime for their own departments and i that it could be inferred that the authority to authorize overtime could be delegated to'a lower leve) supervisor.

I To sati&f : hon concerns the wording on page 6-3 has been modified to clarify the ict ht, tiease replace proposed Technical Specification page

6-3 with the new pages stw
losed. The changes from the original submittal are indicated by the date 9/02/86 in close proximity.

Since these changes are administrative in nature, there is no j change to the Significant Hazards Considerations submitted with Reference l (a).

i f

, \t 8609120357 860903 PDR ADOCK 05000373 P PDR

H. R. Denton September 3, 1986 Commonwealth Edison is notifying the State of Illinois of our request for this amendment by transmittal of a copy of this letter and its attachments to the designated State Official.

Please direct any questions you may have concerning this matter to this office.

One signed original and fifteen (15) copies of this transmittal and its attachments are provided for your use.

Ver truly yours, C. M. Allen Nuclear Licensing Administrator 1m

Enclosure:

Technical Specification Change to NPF-ll and NPF-18, page 6-3 cc: Region III Inspector - LSCS A. Bournia - NRR M. Parker - State of Ill.

2040K

- - .