ML20209F481

From kanterella
Jump to navigation Jump to search
Forwards Circulation Water Chlorination Data Inadvertently Omitted from Operating Monitoring Rept for Third & Fourth Quarters 1984
ML20209F481
Person / Time
Site: Hatch  
Issue date: 06/28/1985
From: Nix H
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20209F484 List:
References
GM-85-652, NUDOCS 8507120475
Download: ML20209F481 (3)


Text

..__,

Georgin Power Company Post Offica Box 439 Caty, Georgia 31513 Telephone 912 367-7781 912 537-9444 Edwin 1. Hatch Nuclear Plant June 28, 1985 GM-85-652 Plant E.

I. Hatch ETS Non-routine Report Docket Nos. 50-321 and 50-366 United States Nuclear Regulatory Commission Document Control Desk Washington, D.

C.

20555 Circulation water chlorination data was not submitted with the 3rd and 4th quarter 1984 Operating Monitoring Reports to the Georgia Dept. of Natural Resources, Environmental Protection Division.

Attached is a copy of the report of a non-routine environmental event that has been submitted as required by Environmental Technical Specifications section 5.7.2b.

This is being submitted to you per the same specification.

/

LLL L t,/GeneralManager

- tH.

C.

Nix b

CgSBT/v12 xc:

R.

J.

Kelly R. E. Conway J. T. Beckham, Jr.

P. D. Rice K. M. Gillespie D. R. Altman Superintendent of Regulatory Compliance R.

D. Baker Control Room Document Control 8507120475 850628 PDR ADOCK 05000321 i

R PDR

\\

1 t

_jid Go-crq:-) FC-:.es sisTC74

l. Ie 3_I3 Fwjrr.cn ec w e

s'hnta Gecry WW3

' It'e& ore 40 526 55:E Marlero Address'

/

Post Offee Sor 1545 Aflanta. Geoga 3030 g-

-4

+-

GeorgiaPower

. Engineering and Ccnstruction Services c+ s e _ ner;en.treg,1 e -

May 30,1985

-~

j)=;<

~.,

i - '

' Qf. }

~

4 PLANT HATCH

~

?+

- ;e;g%: -

. NPDES Permit tio. GA 0004120 4

Circulating Water Chlorination Data L

~.

u

.o

-y

' 'i.QL:

Mr. David M. Llord Program Manager Industrial Wastewater. Program Environmental Protection Division 270 Washington Street, S. W.

Atlanta, Georgia 30334

Dear Mr. Word:

Attached are the subject data sheets as requested by Mr. Larry P. Kloet in his May 15, 1985 letter which was received by us on May 21, 1985.

3 These data were inadvertently omitted from the 3rd and 4th quarter 1984 Operating Monitoring Reports.

If you have questions or comments, please advise.

Yoursgerytruly, D ('

1 s

  • \\/

.g W. R. Woodall, Jr.

Manager of Environmental Affairs Gt(G:pd Attachment

.s3 q.3,

.t bc:

J.T.B.

i K.M.G.

,?!

J.R.J.

3 K.E.A.

-f H.C.fl.

E H.R.H.

=W B.L.M.

.D EV911-021j f;g n

-2 5.,;.=",..

e

9d ce r pepartment of piatural $csources 4

'h'~

ENVIRONMENTAL PROTECTION DMSloN 270 WASHINGTON STREET. S.W J. LEONARD LEDBETTER ATLANTA. GEORGIA 30334 Commissiorer May 15, 1985 Mr. W. R. Woodall, Jr.

Manager of Environmental Affairs Georgia Power Company P. O. Box 4545 J'] ' l Atlanta, Georgia 30302 Re:

Plant Hatch flPDES Permit flo. GA 0004120 r,. -

Dear Mr. Woodall:

Circ water chlorination data were not submitted with the 3rd and 4th quarter 1984 reports in compliance with the referenced plant's'perrc.it requirements. Please submit these reports or a written notice of noncom-pliance within fif teen (15) days of receipt of this correspondence.

Sincerely,

/ arry P.

- oet, P.E.

L 3

Environmental Engineer Industrial Wastewater Program LPK:bk l

l g

S RECENED M AY 2 i w35 EIN. AITAd

.