t Commonwealth Edison One First Nation:I Pla19. Chicago, llhnois Address Reply to: Post Othee Box 767 Chicago, Illinois 60690 July 9, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC. 2D555
Subject:
Byron Generating Station, Unit 2 Braidwood Generating Stations, Units 1 & 2 Request for Additional Information to FSAR Question 423.45-Diesel Gen. Testing NRC Docket Nos. 50-455 and 50-456/457 Reference (a):
May 14, 1985 B.J. Youngblood Letter to D.L. Farrar (b):
February 11, 1985 T.R.
Tramm Letter to H.R. Denton (c):
February 1, 1985 B.J. Youngblood Letter to D.L.
Farrar
Dear Mr. Denton:
This letter provides additional information requested by Mr. Youngblood in response to FSAR Question 423.45.
Our revised response is as follows:
"All Byron Unit 2 and Braidwood Units 1 and 2 testing required by Section C.2.a will be performed in the diesel generator preoperational test, FSAR Table 14.2-25a, except for Part C.2.a(2),
which is tested in the ECCS Full Flow Test, Table 14.2-33, and Part C.2.a(7), which is not applicable because the design does not require switching of one fuel oil supply system to another to meet the 7-day requirement.
Testing for Byron Unit 1 was conducted as part of that unit's preoperational test program which was completed in 1984 to the provisions of the existing FSAR.
The Byron Unit 2 "A" diesel generator was tested under the Byron Unit 1 test program."
Attached is the revised FSAR Table 14.2-25, new FSAR Table 14.2-25a, and Appendix 1.108.
Please address any questions that you or your staff may have concerning this matter to this office.
One signed original and fifteen copies of this letter and the attachments are provided for NRC review.
Very truly yours, e//
8507120405 850709 hg NM PDR ADOCK 05000455 w
A PDR y'
A. D. Miosi Nuclear Licensing Administrator II 0348K
- ----- -- b I ---
t B/B-FSAR AM_ENDMENT TABLE 14.2-25 DIESEL-GENERATOR BYRON UNIT 1 AND 2A. DIES _EL-GENERATORS tyreoperarlonal Test)
Plant Condition or Prerequisite Prior to core load.
Test Objective To demonstrate that each diesel generator can start and assume its rated load and to verify operation of alarms, indications, controls, and safety features.
Test Summary Each diesel will'be started and loaded a number of times under normal and simulated accident conditions to prove conformance to Regulatory Guide 1.108, Revision 1, Regulatory Positions C,2',a, parts (.1), (3), (4), (6), (9) and C.2.b during this test.
Confomance to Regulatory Position C.2.a, parts (2), (5), (7), and (8) will be demonstrated in other Preoperational Tests or in plant surveillances. Data collected during this test to prove confomance includes voltane, frecuency, and
- current, s
Acceotance Criteria Each diesel generator will be tested to prove conformance to Renulatory Guide 1.108, Revision 1, Renulatory Positions C.2.a, parts (1), (3), (4),
(6), (9) and C.2.b.
l l
L 14.2-37 s
n-C'
, f.,
' t.
9 g,
.q\\'
B/B-FSAR AMENDMENT 7
(
3.
' TABLE ' 14. 2-2 5a
.s.
DIESELIGENERATOR
(
4 1
s.
BYRON UNIT 2B~AND BRAIDWOOD DIESEL-GENERATORS
~
t (Preoperational Test) s t.
Plo tit Condition or Prerequisite Prior to core load.
Test Obiective N
ho demonstrate that each diesel; generator can start and assume its rated load and to verify; operation of alarms, indications, controls, and safety features.s' N
TSst' Summary Each diesel will be started and loaded.a number of times under normal and simulated accident conditions to prove conformance to Regulatory Gui"de 1.108, Revision 1, Regulatory Positions C.2.a.
parts (1), (3), ( 4 )',' ( 5 ). ( 6 ), (8), (9)1 and C.2.b during this test.
Conformance to Regulatory Position C.2;a, part (2) will be demonstrated in Table 14.2-33.
Data collected during this test to prove conformance includes voltage, frequency, and current.
Acceptance Criteria s
Each diesel generator will be' tested to prove conformance to Regulatory Guide 1.108, Revision 1, Regulatory Positions C.2.a.
parts (1), (3),'(4),;(5), (6), (8),'(9) and C.2.b.
14.2-37a~
8
,. \\.
r-O
,o B/B-FSAR AMENDMENT REGULATORY GUIDE 1.108 Revision 1, August 1977 PERIODIC TESTING OF DIESEL GENERATOR USED AS ONSITE ELECTRIC POWER SYSTEMS AT NUCLEAR POWER PLANTS The Applicant complies with the applicable requirements of this guide for the Byzon Unit 2 "B" diesel generator and for the Braidwood Units 1 and 2 diesel generators.
The Byron Unit 1 and Unit 2 "A" diesel generators were tested prior to the issuance of the Byron Unit 1 operating license, under FSAR Amendment 41 which took exception to Position C.2.a(5).
A1.108-1 l
.