OPERATING DATA REPORT DOCKET NO.
50-336 DATE 7/14/86 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Ext. 4417 OPERATING STATUS 1.
Unit Name:
Millstone Unit 2 Notes Items 21 and 22 2.
Reporting Period:
Revised May 1986 cumulative are weighted 3.
Licensed Thermal Power (MWt):
2700 averages.
Unit operated 4.
Nameplate Rating (Gross MWe):
909 at 2560 MW Thermal prior 5.
Design Electrical Rating (Net MWe):
870 to its uprating to the 6.
Maximum Dependable Capacity (Gross MWe):
888.75 current 2700 MW Thermal 7.
Maximum Dependable Capacity (Net MWe):
857.25 power level.
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr. -to-Date Cumulative 11.
Hours In Reporting Period 744 3624 91440 12.
Number Of Hours Reactor Was Critical 744 3624 66161.7 13.
Reactor Reserve Shutdown. Hours 0
0 2205.5 14.
Hours Generator On-Line 673.5 3553.5 62271.2 -
15.
Unit Reserve Shutdown Hours 0
0 468.2
- 16. Gross Thermal Energy Generated (MWH) 1809751 9548923 157652725
- 17. Gross Elec. Energy Generated (MWH) 583300 3090800 51432279 18.
Net Electrical Energy Generated (MWH) 560484 2979037 49300256 19.
Unit Service Factor 90.5 98.1 68.1 20.
Unit Availability Factor 90.5 98.1 68.6 21.
Unit Capacity Factor (Using MDC Net) 87.9 95.9 64.0
- 22. Unit Capacity Factor (Using DER Net) 86.6 94.5 62.9 23.
Unit Forced Outage Rate 0.0 0.0 16.6 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Scheduled for refuelina in September 1986.
Duration = 14 weeks 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A i
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
^
INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A
+
COMMERCIAL OPERATION N/A N/A l
8609100250 960714 ADOCK0500g3J6 DR
-