ML20209E157

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 70-1113/87-04 on 870323-27 (Ref 10CFR2.790 & 73.21).No Violation or Deviation Noted.Major Areas Inspected:Investigation of GE UO2 Powder Measurements
ML20209E157
Person / Time
Site: 07001113
Issue date: 04/22/1987
From: Bates J, Mcalpine E, Son Ninh, Seymour D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19292H171 List:
References
70-1113-87-04, 70-1113-87-4, NUDOCS 8704290444
Download: ML20209E157 (1)


Text

,'CoNTAINS 2.790 IMoWWAhoN MATI#fAL TTANN/u. 3F.1RE7.'ITH g>n at *g UNITE 3 STATES o

NUCLEAR REGULATORY COMMISSION

[4 REGloN 11 g

g j

101 MARIETTA STREET, N.W.

't ATLANTA, GEORGI A 30323 APR 2 21987 Report No. 70-1113/87-04 Docket No. 70-1113 License No..SNM-1097 Licensee: General Electric Company Date of Inspection: March 23-27, 1987 Type of Inspection: Announced Material Control and Accountability Inspectors: --

0 U (f 4

$/.22/57

/Joh '

Bates, Safeguards Chemist Date S'igned

/

S1m lE 4lAol9~1 Son-Q.~NinbrFuer Facilities Inspector Date Signed

~

lOn h

/L

?

Deb 6hih' A. 'Seymour, pemical Engineer Date Signed Approved by:

EkM"b 4/2.2/87 E. J. McAlpihe, Chief, Ma\\erial Control and Date Signed Accountability Section, Nuclear Materials Safety and Safeguards Branch, Division of Radiation Safety and Safeguards

SUMMARY

Scope: This special reactive inspection included an investigation of General Electric's UO2 powder measurements.

Results:

No violations or deviations were identified.

i 8704290444 870422 PDR ADOCK 0700 3

C lh'o'hQRfwmI

"'