Forwards Technical Evaluation Rept EGG-EA-6941, Conformance to Reg Guide 1.97,Davis-Besse Nuclear Power Station. Licensee Conforms to or Is Justified in Deviating from All Variables in Reg Guide 1.97
ML20209D975
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/31/1986
From: Roberts E
IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
To: Carrington M
Office of Nuclear Reactor Regulation
Shared Package
ML20209D981 List:
References
CON-FIN-A-6483, RTR-REGGD-01.097, RTR-REGGD-1.097 EWR-117-86, NUDOCS 8704290406
Download: ML20209D975 (1)


Text

_ _ _ _ _ - _

. , Ppft

/NEA Idaho National Engineering Laboratory October 31,1986 Mr. M. Carrington, Program Manager Office of Nuclear Reactor Regulation U.S. Nuclear Reactory Commission Washington, D.C. 20555 TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO REGULATORY GUIDE 1.97, DAVIS-BESSE NUCLEAR POWER STATION," EGG-EA-6941, NOVEMBER 1986 EWR-117-86 Ref: NRC Form 189, " Program for Evaluating Licensee Conformance to R.G. 1.97, Rev.2, and SPDS Implementation" (FIN A6483), October 1983

Dear Mr. Carrington:

Transmitted herewith is the above subject technical evaluation report.

This report documents the EG&G Idaho evaluation of Davis-Besse Nuclear Power Station's conformance to Regulatory Guide (RG) 1.97,

" Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plants and Evirons Conditions During and Following an Accident".

This evaluation, which was completed under FIN A6483, has determined that l the licensee either conforms to or is justified in deviating from all I variahloe ia n,c 1.07.

Very truly yours,

/

A' E. W. Roberts, Manager NRC Headquarters Support 9p

Enclosure:

As Stated cc: 1. Ahmed, NRR-PBPE J. J. Lazevnick,NRR-PAEI G. L. Jones, DOE-ID P. Shemanski, NRR-PBPE J. O. Zane,EG&G Idaho,Inc. (w/o Encl.)

SEGzGeom.sne.4905 DelRay Avenue Suite 201 Bethesda, MD 20814 8704290406 841031 PDR P

ADOCK 05000346 '

PDR