ML20209D975
| ML20209D975 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/31/1986 |
| From: | Roberts E IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY |
| To: | Carrington M Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20209D981 | List: |
| References | |
| CON-FIN-A-6483, RTR-REGGD-01.097, RTR-REGGD-1.097 EWR-117-86, NUDOCS 8704290406 | |
| Download: ML20209D975 (1) | |
Text
_ _ _ _ _ - _
Ppft
/NEA October 31,1986 Idaho National Engineering Laboratory Mr. M. Carrington, Program Manager Office of Nuclear Reactor Regulation U.S. Nuclear Reactory Commission Washington, D.C. 20555 TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO REGULATORY GUIDE 1.97, DAVIS-BESSE NUCLEAR POWER STATION," EGG-EA-6941, NOVEMBER 1986 EWR-117-86 Ref: NRC Form 189, " Program for Evaluating Licensee Conformance to R.G. 1.97, Rev.2, and SPDS Implementation" (FIN A6483), October 1983
Dear Mr. Carrington:
Transmitted herewith is the above subject technical evaluation report.
This report documents the EG&G Idaho evaluation of Davis-Besse Nuclear Power Station's conformance to Regulatory Guide (RG) 1.97,
" Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plants and Evirons Conditions During and Following an Accident".
This evaluation, which was completed under FIN A6483, has determined that l
the licensee either conforms to or is justified in deviating from all I
variahloe ia n,c 1.07.
Very truly yours,
/
A' E. W. Roberts, Manager NRC Headquarters Support 9p
Enclosure:
As Stated cc:
- 1. Ahmed, NRR-PBPE J. J. Lazevnick,NRR-PAEI G. L. Jones, DOE-ID P. Shemanski, NRR-PBPE J. O. Zane,EG&G Idaho,Inc. (w/o Encl.)
SEGzGeom.sne.4905 DelRay Avenue Suite 201 Bethesda, MD 20814 8704290406 841031 PDR ADOCK 05000346 P
'