Amend 172 to License NPF-49,revising MP3 Licensing Basis Associated with Design Basis SG Rupture Accident Analysis Described in Chapter 15 of MP3 FSAR to Address Unreviewed Safety Question
ML20209D643
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/02/1999
From: Clifford J
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20209D648 List:
References
NUDOCS 9907130189
Download: ML20209D643 (2)


Text

p.,

~

gegWoog 3*

-t UNITED STATF.S g

g NUCLEAR REGULATORY COMMISSION g

WASHINGTON, D.C. 20555-4001 S

%,..... s o

NORTHEAST NUCLEAR ENERGY COMPANY. ET AL.

DOCKET NO. 50-423 MILLSTONE NUCLEAR POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 1 72 Ucense No. NPF-49

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee) dated June 5,1998, as supplemented by a [[letter::B17490, Forwards Response to NRC 980910 & 1218 RAIs Re Util Proposed LAR Re Revised SG Tube Rupture Analysis, .No New Regulatory Commitments Are Contained within Ltr|letter dated January 13,1999]], complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authonzed by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and i

E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the l

Commission's regulations and all applicable requirements have been satisfied.

l 1

t e

l-9907130199 990702 PDR ADOCK 05000423 P

PDR L

l 2-

2. Accordingly, changes to the Final Safety Analysis Report (FSAR) to reflect the description i

of the revised steam generator tube rupture accident analysis to address the changes in the

{

offsite dose and margin to overfill analyses as set forth in the application for amendment by l

the licensee, dated June 5,1998, and supplemented by a [[letter::B17490, Forwards Response to NRC 980910 & 1218 RAIs Re Util Proposed LAR Re Revised SG Tube Rupture Analysis, .No New Regulatory Commitments Are Contained within Ltr|letter dated January 13,1999]], are j

authorized.

3. This license amendment is effective as of the date of issuance, and shall be implemented within 60 days of issuance.

i FOR THE NUCLEAR REGULATORY COMMISSION l

DI i

James W. Clifford, Chief, bec on 2 Project Directorate 1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Date of issuance: July 2,1999 1