o 2 Address Reply to: Post Omco Box 767 b/ Chic.Go. Illinois 60690 0767 April 21, 1987 U.S. Nuclear Regulatory Connaission ATTN: Document Control Desk-Washington, D.C.
20555
Subject:
LaSalle County Station Units 1 and 2 Detailed Control Room Design Review (DCRDR) Implementation NRC Docket Nos. 50-373 and 50-374 Reference (a): Letter from H.L. Massin to H.R. Denton dated October 29, 1985.
Dear Sir:
This letter is to provide a description of activities being conducted to resolve the Human Engineering Discrepancies (HEDs) at LaSalle County Station. These HEDs were identified in a Detailed Control Room Design Review (DCRDR) for which a summary report was submitted in Reference (a). That submittal identified the HEDS, the corrective actions to resolve those HEDs and a tentative schedule for those actions. The schedule provided in Reference (a) was predicated on prompt NRC approval for Commonwealth Edison's disposition of each of the HEDs.
Since the submittal of reference (a), some of the minor items have been completed. However, no action has been taken towards the design of HEDs requiring major changes. The work on these HEDs is awaiting NRC approval of the proposed resolutions.
l The new schedule (attached) has been prepared to complete the changes in a timely manner while avoiding subjecting the operators to continually changing panels or rework of major changes which would involve additional costs. One significant problem identified is that the Containment Monitoring Panels (PM 13 J) must be completely rebuilt. This will be difficult during a regular refueling outage and requires much effort to effectively plan other activities around this rebuild effort.
8704290220 870421 l
4 hDR ADOCK 05000373
/
PDR 8
I \\
U.S. NRC April 21, 1987 i
Your approval of the proposed resolutions is requested by June, 1987 if at all possible. We would be pleased to meet with your staff to assist with the review in any way possible to expedite approval.
If you have any additional questions regarding this matter, please contact this office.
Very truly yours, C. M. Allen Nuclear Licensing Administrator 1m Attachments cc:
P. Shemanski - NRR Region III Office NRC Resident Inspector - LSCS M. C. Parker - IDNS 2985K l
l l
l
[
I Maior Chances Page 1 of 5 l
i i
" Implementation HED Number Pace f Un11 Date by Outaae HED Descrintion
- 13. 15, 354 90
- 1. 2 Note 2 Lighting Enhancement 353, 500 86 33, 34 46
- 1. 2 Note 2 Addition of Telephone 348, 349 102 20 103 30 105 26 116 0
Note 2 Plant Communication System 27 117 48, 51. 57, 64, 160 1, 2 Note 2 Canponent Rearrangement /
- 75. 360, 364 160 Er.hancements to the Main I
366, 398. 401 160 Control Room Electric Panel 551 160 87 424 235 430 468. 337 5
- 1. 2 kate 2 Revise the "5 CRAM Air 249. 267, 386 131 Pressure" Annunciator 391, 496 131 406 243 448 213
]
206 33 1, 2 Note 2 Revise Feedwater &
179 65 Condensate Panel (PH03J) 547, 373 66 164 241 365 380 86 407 184 408 191 409 203 410 259 411 262 414 275 416 276 417 277 418 553 428 472 406
- 1. 2 Note 2 Rearrangement of Recorders -
61 397 RWCU System /Recirc. System 1
i Maicr Chanaes pig) 2 cf 5
- Implementation HED Number Page #
yn11 Date by Outace HED Descriotion 341 26 1.2 Note 2 Rearrangement of Containment 370 122 Monitoring Panel (PM13J).
384 129 This panel will be rebuilt.
1 499 137 289 207 452 208 161 227 162 231 325 233 197 363 286 363 362 363 371 363 476 363 I
478 363 194 365
- 1. 2 Note 2 Rearrange Vent and Purge Damper Controls 465 3
- 1. 2 Note 2 Add 'Hain Turbine Bypass 231 34 Valve Open" Annunciation 313, 465 204, 212 69 72
- 1. 2 Note 2 Additici of Guardrails 10 82 i
356 84 0
Note 2 Relocation of Oxygen Breathing Line 0321 11
- 1. 2 Note 2 Improve Reliability of Feedwater Reg. Valve 0431 134
- 1. 2 Note 2 Revise Turbine Control &
Stop Valve Logic 479 402 1
Note 2 Reverse Station Air Compressor Controls 552 141 1
Note 2 Relocate Cycled Condensate Tank Alarms l
Minor Chances Pag 2 3 cf 5
" Implementation 1
HED Numb.gr Page #
Malt Date by Outaae HED Descrintion 6
56 Note 1 Control Room Work Space 10 82 Note 1 12 83 Note 1 115 51 Note 2 167 57 Note 1 322 12 Note 2 446 57 Note 1 487 7
Note 2 488 12 Note 2 377 120 Note 2 Communications 515 120 516 120 2
188 145 Note 1 Annunciator Warning Systems 198 154 Note 1 199 155 Note 1 200 156 Note 1 201 157 Note 1 202 158 Note 1 204 154 Note 1 1
248 139 Note 2 i
264 148 Note 1 202 158 Note 1 270 121 Note 2 370 122 Note 2 i
379 121 Note 2 248 139 Note 2 i
495 153 Note 1 1
118 171 Note 2 Controls 120 178 Note 2 144 186 Note 2 152 187 Note 2 98 224 Note 2 Visual Displays 112 210 Note 1 161 227 Note 2 i
162 231 Note 2 1
169 265 Note 1 171 269 Note 1 172 266 Note 1
-m
-s
Minor Chances Pag) 4 Cf 5
- Implementation HED Number Pace #
UD11 Date bY Outaae HED Descristion 290 211 Note 1 313 204 Note 1 369 265 Note 1 448 213 Note 2 450 226 Note 1 461 215 Note 2 481 248 Note 1 521 244 Note 1 542 237 Note 1 96 283 Note 1 Labels and Locations Aids 105 284 Note 1 108 280 Note 1 113 296 Note 1 114 298 Note 1 173 274 Note 1 174 275 Note 1 176 276 Note 1 178 321 Note 1 210 308 Note 1 211 308 Note 1 212 309 Note 1 213 310 Note 1 214 311 Note 1 278 298 Note 1 288 323 Note 1 294 312 Note 1 295 314 Note 1 304 317 Note 1 342 322 Note 1 368 381 Note 1 449 279 Note 1 470 280 Note 1 1
484 281 Note 1
)
504 320 Note I 520 313 Note 1 526 299 Note 1 545 292 Note 1 418 335 Note 1 419 336 Note 2 422 340 Defer until the $POS review i
_______.__________________.___a
Maior Chanaes Pagt 5 of 5
- Implementation HED Number Page #
Un11 Date by Outaae HED Descrintion 4
46 370 Note 1 Panel Layout 47 371 Note 1 54 385 Note 1 77 375 Note 1 88 425 Note 1 94 377 Note 1 261 413 Note 2 506 387 Note 1 81 432 Note 1 Control-Display Intergration 319 434 Note 1 320 436 Note 1 527 438 Note 1 j
J
- The impletation dates are based on Unit refueling outage after the OCRDR submittal. This is consistance with the datas in the DCRDR, Final Swanary Report. The following outage schedule is assumed for implementation, l
I Note 1: If the NRC's approval is obtained prior to June 1987, the resolution to this HED will be implemented during the February 1988 and July 1988 refueling outages for Unit I and 2, respectively.
Note 2: If the NRC's approval is obtained prior to June 1987, the resolution to this HED will be implemented during the July 1989 and March 1990 refueling outages for Unit 1 and Unit 2 respectively.
Note 3: If the NRC's approval is obtained prior to June 1987, the resolution to the HEO will be implemented during the January 1991 and August 1991 refueling outages for Unit 1 i
and Unit 2, respectively.