ML20209D159
ML20209D159 | |
Person / Time | |
---|---|
Site: | Satsop |
Issue date: | 07/16/1984 |
From: | Brocoum S Office of Nuclear Reactor Regulation |
To: | Novak T Office of Nuclear Reactor Regulation |
References | |
CON-WNP-1354 NUDOCS 8407230415 | |
Download: ML20209D159 (2) | |
Text
dk /'
}
Q.,r"GV
, .RR.Ia1984 .
t i MEMORANDUM FOR: Thomas H. Novak, Assistant' Director for l Licensing (
j Division of Licensing '. s a' THRU: James P. Knight, Assistant Director for Components & Structures Engineering Divisio of Engineering t
FROM: Stephar. Brocoum, Acting Chief Geosciences Branch Division of Engineering
SUBJECT:
EDO #14529 - SUBPOENA REGARDING BONNEVILLE POWER VERSUS WASHINGTON PUBLIC POWER SUPPLY SYSTE!! (WPPSS)
Attached is a list of the relevant documents requested in Hazel Smith's note of June 10, 1984. The specific types of documents were further delineated by G. Knighton on July 10, 1984. The documents themselves were delivered to V. Herses on July 12. If you have any questions contact R. McMullen x24415 or J. Kimball, x28999 of the Geosciehces Branch.
Stephan B occum, Acting Chief Geosciences Branch Division of Engineering
Attachment:
As stated cc: w/ attachment J. Knight H. Smith l G. Knighton V. Nerses B. Singh S. Brocoum L. Reiter J. Kimball R. M-M 1on l
7230415 840716 V4-ADOCK 05000508 At
- 2. Af ' ,
y}
"'"> .0E;GTS... .... ..Q ....... 1.GS.S.... ..... . . 0. .E. .:.G..D. .. '.:h.
.S..E..M.
.:. AC - . . .S. .E. . . . .
- u. ,
""'> .RNcMul'.le'n.:s.l.JKi l...... .L k,3.,.
c ....... ...S!ltacoum.... .R.Kr.jsh,t,, ,, , ,,,,,,,,, ,,,,,,, ,,, ,,,,,,,,, ,,,,,
- > ..,72,I.tB4.,, ,,,,,,.,7 M M.,,, ,, , Z[,@[84,,,,,,,,
2/.16/84......[ . 7/.hk/$4....... , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
- s5po2*n-4*w i wae re:w aia no co.sacu c2' OFFICI AL RECORD COPY ..,,..--_;_
$);4 \
~
y k \
h s. .
Document Title or Description Date
- 1. Supply System Nuclear Project No. 3 April 28, 1983 Geology and Seismology. Questions
- 2. Oraft Safety Evaluation Report - Geology November 1,1983
, and Seismology - WNP No. 3 ,
- 3. Proposal to USGS Research Program Funding Period 1 October, for the USNRC - Northwest U. S. 1983 to 1 October, 1984 Subduction Zone Seismic Risk Assessment i
- 4. U. S. Geological Survey Questions on the April 21, 1983 WNP-3 site.
- 5. Meeting notice from NRC to USGS May 26, 1983 regarding June 23, 1983 meeting
- 6. Letter from NRC to USGS to discontinue July 27, 1983 geology and seismology review in view of the expected suspension of construction of WNP-3
- 7. Note from GSB Branch Chief to reviewers ' August 26, 1983 and section leaders regarding completion of the WNP-3 Draft SER.
- 8. Letter report from NRC Geological November 25, 1983 Consultant Dr. D. B. Slemmons on geology of WNP-3 site and region. '
- 9. First Quarter Report - FY Northwest Oct. 1, 1983 to V. S. Subduction Zone Seismic Risk Dec. 31, 1983 Assessment USGS
- 10. USGS Contract with NRC: Geosciences September 19, 1983 Nuclear Facility Case Reviews IV from February,1983 (includes to January,)1986 the WNP-3 review work i
JUL 2 9 i44 h * .
Docket No.: 50-508 APPLICANT: Washington Public Power Supply System FACILITY: Nuclear Project 3
SUBJECT:
MEETING
SUMMARY
On July 10, 1984, NRC and applicant representatives met in Bethesda,
!!aryland, to discuss the details of the applicant's position with respect to deconvolution. A meeting notice and attendance roster are enclosed (Enclosures 1 and 2 respectively).
The applicant presented information on the following items: (i) WNP-3 situation and status, (ii) WNP-3 structural review sumary, (iii) Licensing documents tracking system history responses to Structural Engineering Branch questions, (iv) Sunnary of structural audit, (v) Seismic dynamic analysis comparison of finite element / boundaries approach and elastic half-space approach and, (vi) conclusion. The highlights of the applicant's presentation are shown in Enclosure 3.
It was agreed that the Structural Engineering Branch would review the materials submitted to them and provide their comments at a later date.
g!
s B. K. Singh, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosures:
As stated cc w/ enclosures: '
See next page DL:LB#3 D:CIih3
~
BKSingh:pob GKnighton 7//84 7/ 3/84 A
q '
7 a
o Meeting Sumary Distribution
- Local POR PRC System NSIC LB#3 Reading Attorney, OELD G. Knighton B. K. Singh J. Lee V. Nerses NRC Participants B. K. Singh G. Knighton Jeff Kimball Owen Rothberg Lyman Heller C. P. Tan S. P. Chan bec: Applicant & Service List l
l l
t i
j l
i
,~. - '
[ 'e
~ 't, UNITED STATES
!- NUCLEAR REGULATORY COMMISSION h ,*- a$ WASHINGTON, D. C. 20555 '
%, ,/ 'JUl.19 E34 Docket No.: 50-508 APPLICANT: Washington Public Power Supply System FACILITY: Nuclear Project 3
SUBJECT:
MEETING
SUMMARY
On July 10, 1984,.NF,C and applicant representatives met in Bethesda, Maryland, to discuss the details of the applicant's position with respect to deconvolution. A meeting notice and attendance roster are enclosed (Enclosures 1 and 2 respectively).
The applicant presented information on the following items: (i) WNP-3 situation and status, (ii) WNP-3 structural review summary, (iii) Licensing documents tracking system history responses to Structural Engineering Branch questions, (iv) Sumary of structural audit, (v) Seismic dynamic analysis comparison of finite element / boundaries approach and elastic half-space approach, and (vi) conclusion. The highlights of the applicant's presentation are shown in Enclosure 3.
It was agreed that the Structural Engineering Branch would review the materials submitted to them and provide their comments at a later date.
().- -'
B. K.'Singh, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosures:
As stated cc w/ enclosures:
See next page (7[fY f, hY
_v i ur 9
a T WNP 3 Mr. D. W. Mazur Managing Director Washington Public Power Supply System .
i P. O. Box 968 3000 George Washington Way Richland, Washington 99352 .
I Nicholas S. Reynolds, Esq. ;
DeBevoise & Liberman j 1200 Seventeenth Street Washington, DC 20036 j G. E. Doupe, Esq.
Washington Public Pow.er Supply System 3000 George Washington Way ,
Richland, Washington 99352 hr. Nicholas D. Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 .
Olympia, Washington 98505 Mr. Douglas Coleman Washington Public Power Supply System P. O. Box 1223 Elma, Washington 98541 Resident Inspector /WPPSS 3/5 c/o U.S. Nuclear Reagulatory Commission P. O. Box 545 Elma, Washington 98541 Regional Administrator - Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Eugene Rosolie, Director Coalition for Safe Power 410 Governor Building 408 Southwest Second Avenue Portland, Oregon 97204 Nina Bell Nuclear Information & Resource Services 1346 Connecticut Avenue, N. W.
Washington, D. C. 20036
3 ,
Enclosure 1 sw ~ s rny msr ~c?
WJM 1 $ '2st Docket No.: 50-508 MEMORANDUM FOR: George W. Knighton, Chief Licensing Branch No. 3, DL FROM: V. Nerses,- Project Manager, Licensing Branch No. 3, DL
SUBJECT:
WNP-3 MEETING 1
DATE & TIME: Tuesday, July 10, 1984 l 9:00 am - 12:00 pm , I LOCATION: P-110 Phillips Building '
1 Bethesda, Maryland PURPOSE: The applicant will present to the staff the details of their position with respect to deconvolution.
AGENDA: See enclosed PARTICIPANTS: WPPS3 D. Coleman, et al .
NRC i V. Nerses, B. X. Singh, P. T. Kuo 1
l Victor,Nerses, Project Manager Licensing Branch No. 3, DL
(
Enclosure:
Agenda
! cc: See next page
' Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy",
43 Federal Reoister 28058, 6/28/78 Those interested in attending this meeting l
should make their intentions known to the Project Manager, Vi m fikr>(es_at I
(3 01) 492-7238, by no later that July 5,1984. , M-nY k
- "'**> DL:ta#3... .... fg L .3......... Ohh..
o m -c) 8, i,p,h,),c h,,_ ,,,(, s,e s , , ,, ,,,G,y,Kn,jp, ton, ,,,
......t (f.:... . ....
mc > 6,C,y/,8,4,,,,, ,, 6//y/84
, 6//%84 .
J. Enclosure 1 (Continued)
, WNP 3 Mr. D. W. Mazur -
Managing Director '
Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 Nicholas S. Reynolds, Esq.
DeBevoise & Liberran 1200 Seventeenth Street Washington, DC 20036 G. E. Daupe, Esq.
Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 '
Mr. Nicholas D. Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98505 Mr. Douglas Coleman Washington Public Power Supply System P. O. Box 1223.
Elma, Washington 98541 Resident Inspector /WPPSS 3/5 -
c/o U.S. Nuclear Reagulatory Commission P. O. Box 545 Elma, Washington 98541 Regional Administrator - Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Eugene Rosolie, Director Coalition for Safe Power 410 Governor Building 408 Southwest Second Avenue Portland, Oregon 97204 Nina Bell Nuclear Information & Resource Services 1346 Connecticut Avenue, N. W.
Washinnton, D. C. 20036 i
1 i
o
. m, Enclosure 1 '(Continued)
STRUCTURAL ENGINEERTNG BP,ANCH M,EETING I. INTRODUCTI0N II. h'NP-3 SITUATION & STATUS III. STRUCTURAL AUDIT & FINDINGS IV. DECONVOLUTION FINDING (AF #1)
V. HISTORICAL PERSPECTIVE OF WNP-3 WITH RESPECT TO DECONVOLUTION VI. SUPPLY SYSTEM RESPONSE TO AF #1 A. INTRODUCTION B. PURPOSE AND SCOPE C. ANALYSIS D. COMPARISON OF ANALYSIS RESULTS E. CONCLUSIONS VII. NRC QUESTIONS AND COMMENTS ON SUPPLY SYSTEM RESPONSE TO AF #1 VIII. NRC QUESTIONS OR COMMENTS ON OTHER SUPPLY SYSTEM RESPONSES
! IX. NRC CONCLUSIONS
.' J-3 Enclosure 1 (Continued)
PEET?NG NCT!CE DISTFI?UTION:
Docket tio(s): 50-500 NRC P;ITICI:ASTS ~
No.C PDP.
Local POR TIC t: SIC VNerses PDC Systen aBKSingh E LE3 Rsading PTKuo Rf-avio H. Derton/E. Case D. Eisenhut/E. Fuesie T. Novak J. Yc':ngblood A. Schwencer E. *densam F. litraglia E. Butcher D. Crutchfield . .
C. Grimes, Acting .
^
G. Uclahan .
C. Thor.as G. Lainas S. '.*a rga E. '.assa c J. ' ilie-J. Stolz R. Yonner S'. Johnston J. P. Knight
- R. Mattson L. Pubenstein
- W. Houston D. Muller I. Speis F. Schroeder .
F. Rowsome H. Thompson T. W. Russel ACRS (16';
Attcrney, OELD D. L. Jordan N. Grace F. Ingram, PA Receptionist (Only if necting is held in Bethesdai Project l'.anager VNerses J. Lee bec: Applicant & Service List rm - , - -r --
,s s, Enclosure 2 Attendance List -
Name Organization Title i B. K. Singh NRC/NRR/DL Project Manager G. Knighton NRC/NRR/DL Chief, LB#3 J. Porrovecchio EBASCO Lic. Supervisor Jeff Kimball NRC/GSB/DE Seismologist Eugen Rosolie Coalition for Safe Power Intervenor (CFSP)
D. W. Coleman Wash. Public Power Supply Licensing Manager Supply (WPPSS)
A. D. Kohler WPPSS Program Director D. M. Bosi WPPSS R. H. Wang E8ASCO Services, Inc. Super. Civil Engr.
M. C. Hsieh .EBASCO Services, Inc. Princ. Civil Engr.
K. D. Chiu EBASCO Services, Inc. Assc. Consult.
Engr.
Owen Rothberg NRR/CE Engineer /Exreviewer H. Worchel EBASCO Project Engineer Lyman Heller NRC/NRR/DE Geotechnical Engrg.
Ldr.
C. P. Tan NRC/NRR/DE Structural Engineer S. P. Chan NRC/NRR/DE Structural Engineer i
I r
r i
l 1
WNP-3 SITUATION AND STATUS
. Enclosure 3 O PROJECT IS 76% COMPLETE 0
FULL CONSTRUCTION ACTIVITIES STOPPED DUE TO LACK OF FINANCING 0
CONSTRUCTION RESTART DATE TO BE DETERMINED BY BONNEVILLE POWER ADMINISTRATION IN NEXT FEW MONTHS PROJECT PLANNING PRESENTLY BASED ON A JULY 1985 RESTART DATE AND A JUNE 1989 FUEL LOAD PUBLIC PROCESS IN WHICH ALL PROJECT COMPLETION ALTER-NATIVES WILL BE EVALUATED 0
DESIGN IS APPROXIMATELY 95% COMFLETE O PRESERVATION PROGRAM IMPLEMENTED .
0 ESSENTIAL DESIGN & LICENSING ACTIVITIES CONTINUING 0
PREPARATIONS FOR OPERATIONS CONTINUING 0
400 FULL TIME EQUIVALENT PEOPLE WORKING ON THE PROJECT 0
RESPONSES TO NRC QUESTIONS CONTINUING 496 QUESTIONS RECEIVED 397 RESPONSES COMPLETE '
~
21 PARTIAL RESPONSES PROVIDED MORE RESPONSES WILL BE PROVIDED IN JULY / AUGUST REMAINDER TO BE PROVIDED FOLLOWING CONSTRUCTION RESTART.
O SUPPLY SYSTEM INVOLVEMENT IN CESSAR-F ACTIVITIES MAINTAINED 0
DRAFTSAFETYEVALUATIONREPORT6DSER)EXPECTEDFROMNRCLATER THIS YEAR 0
EXPECT TO RECEIVE MORE NRC QUESTIONS. -
m WilP-3 STRUCTURAL REVIEW Sul1 MARY O STRUCTURAL REVIEW QUESTI0lls .
l 37 COMPLETE RESPONSES 1 PARTIAL RESPONSE 0 25 FINDIllGS FROM STRUCTURAL AUDIT AT EBASCO 3 FINDINGS CLOSED PRIOR TO ISSUANCE OF NRC'S 11/02/84 REPORT 1
-16 RESPONSES COMPLETED VIA 06/27/84 LETTER TO NRC 1 RESPONSE PLANNED FOR LATER IN 1984 D
) * '
,O m- -
r
-. a. . . , .
. ^
N. ,
' . , I i e e t g.
j e
! . . 6 t l ,
. t .
e f .
' . 1 i e 4 t 6 .
I '
. . . [. g . ,
,r i
- l l 3
. 'e .
l, g !, e
, e .
s
- l I t I ! /
j i
, i i !
i 1. t s e t
- y. a e
t a c . s . s .
< g . .
I
, l .
f i
. i e p I e a e
' l t i I '
e
, 1 i !
e
- i ! t .
t .
. a .
- g 1 ,
e I
g i.
l
. e l e t .
l l '
, . I. i l i. l .'
- e j f l ,'
. t i j .! i .
t l l [
. ! . . i l
! ' i i
e i . . i - '. ,
< t t 6 . I n e > 4 4 - O "* > n w > re C f's e - r: n ,c c t== 0 = e n O rJ N e n < r* *> O - ru a? e ' N 4 rJ N O g
I et O n . - C < O .c > eg .= r; = PJ EJ - - PJ n M N n 4 o n f': n el et n n r't 4.r= v v v e e v v e n e e s;2 L. r4i e- PJ e e PJt :rd- .*4 * :T. - ed O. e N..=T e t* TeTsC. . ee? aQatO T =.ev v sn i -e fJ ineT e :": e v v ve vave=:Yet- v. T e ee aT ,e
== e= st T r4e Y e v.
. N "J "J N N N *4 N N *1 rJ ?? fa n v n f" =r e ("t e t'! "! "I e e v t*t n a f" t"t t") r'! e ti f* n n n "I *- e "' e " r* -
OOOOOOOOOOOOOOCOOOOOOOO- OOOOCOOOOOOOOOCCCCOO
+ ; * *
- i e I i t
= i t 8 1
1 l .
> 'A -
.- . t .
- - C I e u O .:s 5-m v u .u u u u v u.ci u o:u v u,u u u u u u,u r u u = u.ui u u u u u u, u u u u u u, u u ,u uuuuu O- i a 4
- l 1
I l . .
- l 6 i
i a
-
- l
=* id C
N N N rs N T4 N rd el N fyfW N *f ko c cs=rt 4 rs % "4 N'N 4 A A rd N o N rv fu re % ru N n rt rd fy fs N N N N ev -
OC0-N f's NCNO t'J u N O f4 O Cri = OtC== .> N> O 0 C 0 0 0 0 O O ~ O> O> O O
.P Nw N O C . == D c= 0 =.e0C O = O C O-=- == - C rt C.* O
-* W O C
- -- O- -- - -- em OO O O.-n vet'C 0ewOe -C-e == O e OD C Oa3 u e e 0 0 0 C 0 O eNOL' n7 C- O O O c= O4C - --
w 5-
=< rd N P1 N 08 'T PJ N *9 m *v n r* f") av n r? e e rf w 5 m n e e e "7 f") e e n n l er* n n t'! n n e e (7 e f" f**
Ut 43 O C 3 O O O O O O = 0 :.3 0 C ll3 C C C O C C O C 3 O O O O O C :l 0 0 0 C O C C = ll3 3 O C O O O O O
>m u g .o.. o. c-
. .o. - .o. .e.a.
.c. .c.. .c .c. .o. .c .o. . c.. c. c. c-
.c. =:.e. .
.c. c. .c. .o. > .=. .c. ,c. . .e. .e. .d. .e. .:. .c. .d. e .:l.. .c. . r,. .. o ..-
g3 =
C I '
. , l.
g=,
,p s ;
- I' l.
A t
- [
i .
mO . .
t' & C O C O O O O O O C O C ** r' "? :"? :"! f'? f7 ?? ** "7 "1 f") f": f"1 ** "1 m r* '" "1 '": f* "* "1 M "3 "; M *3 "* f9 ** "" rJ r; P.
N N N N N r: tt r;;t rt r. O O O C C O C O O O O C O C C 0 0 C O O C O O 0 0 0 O O C C C C 0 0 0 C u >=
< .J W O O O *: O O O O O O O o n a n n n 41 n n :n n a n n n n n n n n a n n c n a r o n a n n n
= = 00000000COOc0ooOOOOOOOOOOOOOOOOOOOCCCCCOOCOC---
e= u o< f': N gO O O PJ *:: OrJ O f JJ3 NO GO rJ O TVCe4 CO WO nO t'l *1 C 3MO!"!CnOt'*OOO"IO**1 C l'OOOnO"' O r? O :"!Or2lllOCnCn C nn O f':
O"C'" O NO-* O r* O MO NC n "I %.M :".I . . r* *-
d.
. .g . .
0 ?.. .O. 0.* > . .> > > 2.* >... 0. .0. 0. .3* C.* . .c. .:. .o 0 C.'. .O' .>. . .4r. .:. 0 > ll- C-.0. ...c :. c. .il'.=. >. .c.= .:l.. 2 0- t* W* >. D. s c La-. V 4.'.
=0n f . : 1 . '
p l' . g .
- I
! l mg i
i + I. t
- o. t . .
gw- e :
a g ur y= N ft 4 N r:- $ rJ 02CO2-~
CC=0CC < < N < $ $ <= <z ~S=< $. . .
$ <: :< < w S c 4 < e < $ <:
O.CO:Q: :< <: _$ $ #d := < < :<. sC0: o n --<<gs-
< g . * .
i Eh
-u i .
. I e
t M CT, i f . e b-e .
I r* ri N t irt e
w' y
C 'O O 6 l
. .i !.
, i g { 4 n == 6
[
4 *? .rg . C ,
PJ a . OO O =.iO .O O O O .O O.O n- -! C q= . . . .
n q= ~4 s e- es : e t w .n r: ~? . P. - N it r; n - :~ n ra r; rt .~ :~ r~ e w t\ ~ e s wu
- 00OO 0000000 CC 0000 00 OO 00 OoOOOO C 00O
- h. 7. vs% % <OOOOOO~ehANOWW4sessNOONWOOdO 00000000-70 OOOOOOOOOOOCOOOOOCOOOOO.OOOOOOOOOOOOCOOC00000
. . . . . . <<t
.'s . 5 > n A *1.*: " ri .- - = =: ; r: a: : = * .* % O - = "I f=, n - r .- - - r- - ~. t* "' a s s .
OCOOOCOOOOOOOOCOOOOOOOOOOOOOCOOOCOCCOOOOOCOOO:O e
8 a *
? E' e 44- f* O OO : f6 >
<s..<== <<<<<< << 's <
=
ua I L I N O < == == 0 < O < < P4 < < < =C. C < < < < < < 0:::::::=;
N = s r: r; *; s - w s r. s s s s ssssssssaseesasssss ssss < 4 < 4 4: < n"..C <C < .C <ssss CQ:OOO O C2:: = : =3:O OO OO : :
t
.i 5= ---h, OO- n T e n 4 N O O P O . N h e v... .* C N. -. .O P. . r;O$ N . , NNrN. nen4AO n N r; n n rc.7. :0=r j n . .
et" .? A A O
- r - r : .-
>= '
5 5 0 o 5 .9 O O - 0 0 - .00E00o00C00000000000000000COcOCoOOOCCO *g **
00u 0 0 0 0. 0000000 r. esa n N u.. 0 000 k_[=
L'
_C
! r. a .- N-I P4 f4 r. r4 ft r. re P. Ce N fu f4 rc f4 r4 f4 P4.a ..*f4 r.Nr 0. n u : 0 0 C 0,0 0 C 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 9 0 0 0 0 i nP.N*4-*tuPJr.*suP.r. r;rsJ N rsu.*a : c. ed n esr:T4P. r? r.
- r. fu4 .r..P.
- f. P.- .*..*4r:r..**. r.4* 2. .<<
. .. .. 1
. . . .. - --- - =- - -.m r-* 1-- ;-s-- t-s
- c - . .-*- ;. .-
e
. . _ 7
' . . s , , ,
.I l , [)
- 6 j l . -
i g i
t f a 8
i
. . . g i
. i i !. j ' i ; e j ,
- ,* . l '
8 l e i , , ,
t*
i
- 8. I ' i r$ < a. 4 t.
s i
- - i
- l. *
! : j [
, t g
i ! , j ;
- i La .
u a g . ,
'f. .
t ! ,
i l i .
I I, i I i l, l i
- 8
- ! f. 4 . ; i .
t i
t i
e f' ' -
-{.
f
, 7 f s 8
f j i 6 .
t o g
,I 8
- g. #. ?,
g I n ,
I I !
E I ! j 4 4 f . ' l t
i g l .
l.
.
- s
. 1 -
t i 1
. e 1 -
. . I
- - i :* .
- : i i s i i* g I t .! .
, e .
' = 0 O *= 0 n n M M ar e n n 4 N C c O N rf N ; i I '
= N e n p 4 n n n r* n N s n N N N N C C C 3 0 '
- 1 t
. Oe vs e *s vne e ar e eN:C e, 3e.e O feC, CsO6 O OaCe0e0e0 g .
a LJ C.
>. e s a t +
- l ennnenneeneenweveveeve . l t !'
m = c c c c c c c c c c c c .o o m Ie c o = =.
i i ,
i ! '
4 l 6
- ,' l i .
>. a l 1 i ea .t
} *
- au -
- 5; M, j m ij uuusuvuuuuuuuuuuu,uuuuu a '
i 'a
- g i
.m . .
l.
. I i , e U
- i l t +
O N N n N N rd N N N N N N N N N N N h A N % N NN
}
- j Q rif 4 .3. .O. . C.
<N -C . C..eCo.n C f.2,M 2-4 Q N N5 .c 4s,N s t{o N.oOt2 N -
t * -
-- u .
. W.:
D- e C - =
e-rcenne , C - - C .C. n= Qe -Q n COOCCQQCQ e c e e v .c.
n un m I .
I i
2- o w =- eo m e oc su cc o.o cc-cvoomoecde=c- == cm : : a: -c :c: oc-e
(,
m-2 m ------------ - .----- -- ;. -
> i-i e ,
t i 8
- 4 i r
2_e= s"ei
- i,
. i.
t s: y :- 1 n u n n n re n n n n n n u u n n n n n u n n . g i i.
I u
<5 aw-ocooococococococcosco=
i I e
e
+ 1 i e -
-ug u< nnnnnennnnnnnnnnnnnnnn * ;
i, t i
C'. e. i. e.
- =en t i ; i i ,
I '
We
- 8 5e - -
l MHg C .
f
- . I 555555555555{$55555555 1
8 xk m 2, W -~~~~~--~~~- ~~~~~--~~
a, ,
k 04
=m i , .
{ .
.. 1
-y . i I.
l 5 - * ' .
4 $C r ,
I l u
. i i e
+
I mi : : l I E
> .t
! . i
- i u.
i . ,
3 i '
t
, = -
a.
O 3 ).
'$, (
t "u in "'t -
' +
3
~
sssssss ssss .s - % .sssss
==========
5 c . I, < <s <s <s <s <s <s <s < s < s < s <
s s < s< s< s< s< s< ,. < <s <s s <s .
=====================~~ 4 i
= i i
.ce -w i,
-= , . .
u=
y ;; : D eN - =e o -n n e.n<~oe.e- nn n ocosco----.--- - un.nnu i
- aI tuttutkahkkktthuthukka t i f
.... .. . . - . . , .. . . , , n .. ... , : r r... , .c. . . .
O
SUMMARY
OF STRUCTURAL AUDIT .
FINDING NUMBEj ISSUE RESPONSE 1 DECONVOLUTION / FINITE ELEMENT ELASTIC llALF SPACE RESPONSE METil0DOLOGY SPECTRA GENERATED AND COMPARED TO FINITE F' F**ENT RESULTS. j 2* PEAK llH0ADENING OF RESPONSE IIROADENING PERFORMED IlY USERS.
SPECTRA BY EllASCO 3* DIFFERENCES IN ItESPONSE SPECTitA H.G. 1.60 VS ACTUAL EXPECTED IN FSAR SECTIONS SPECTRA - CONSERVATIVE SPECTRA USED.
11 CONTAINMENT lluCKLING TO BE Pit 0VIDED. ,
i i'
j 5 EARTil00AKE TIME IIISTORY THUN- SPECTRA ENVELOPING VERIFIED. '
CATION IN ll0R I ZONTAL 1)l RECTION.
l 6' INPUT OF MODijl TO COMPUTER CORRECT INPUT DEMONSTRATEI) ilY MODE SilAPE OUTPUT DATA.
I -
i
4
SUMMARY
OF STRUCTURAL AUDIT (CONT'D)
FINDING NUMllER ISSUE RESPONSE 7' POISSON'S RATIO FOR MAT AND CORRECT VALUES USED .
WALLS
~J
'l 8 FINITE ELEMENT MODEL SENSI- PROVIDED TIVITY kNALYSIS i
9' PROPERTIES OF FRESil AND VALUES USED ARE WITillN Tile WEATilERED SANDSTONE MEASURED RANGES 10* CONTAINMENT INTERNAL STEEL STHUCT- HODEL CONSISTENT WITil INDUSTRY URES MODELED AS PIN-Et4DED DESIGN PRACTICES.
11 PEAK llROADENING PER R.G. 1.122 Illt0ADENING PERFORMED !!Y USERS. 3 ItEFER TO RESPONSE TO 220.22 FOR CONFORMANCE TO R.G. 1.122 12 VALUE OF POISSON'S ItATIO FOR CORRECTNESS OF VALUE DEMONSTRATED.
S0ll STRUCTURE INTERACTION 13*
- TilERMAL EXPANSION COEFFICIENT APPit0 Pill ATE METil0D USED .
l 'j
SUMMARY
OF STRUCTURAL AUDIT (CONT'D)
FINDING NUMBER ISSUE RESPONSE lll ROCKING OMITTED FOR INTERFACE EFFECT OF OMISSION ON DYNAMIC NODES BETWEEN ROCK AND STRUCTURE RESPONSE NEGLIGIBLE st M atre -)
15 VALUES OF Soll SPRING MODULI. CORRECTNESS OF VALUES DEMONSTRATED
. 16* SRSS PROCEDURE FOR MAT RESPONSE MADE TO QUESTION 220.17 - METi10D DOES NOT APPLY TO MAT 17 EFFECTS OF ASYMMETRICAL COMPONENTS EFFECTS DEMONSTRATED TO DE OF ACCELERATION NEGLIGIBLE
}8 USE OF SOME ACCELERATIONS IN JUSTIFICATION OF PROCEDURE SillELD BUILDING ANALYSIS PROVIDED /
19 VERIFICATION TilAT RESPONSE SPECTRA EQUIPMENT QUALIFICATIONS VERIFIED WERE PROPERLY 11ROADENED BY USERS 20 SillELD BUILDING STATIC ANALYSIS INPUT DATA VERIFIED INPUTS 21 LOAD COMBINATIONS FOR SillELD LOAD COHillNATIONS ARE CONSERVATIVE BUILDING
SUMARY OF STRUCTURAL AUDIT (CONT'D)
FillDING FillBER ISSUE RESPONSE 22 NEGATIVE PRINCIPAL STRESSES FOR CONSERVATISM OF DESIGN DEMON-j SilIELD BUILDING STRATED FOR COMPRESSION AND BENDING CASE j
[ 23 COMPATIBILITY OF STATIC AND DYNAMIC VERIFICATION PROVIDED ,
ANALYSIS OF DRY COOLING TOWER
! O A ST B A LY l V EG IBLE FE T 2.4 DEMONSTRATION TilAT ALL APPLICABLE DOCUMENTATION PROVIDED DEMONSTRA-LOADS AND LOAD COMBINATIONS WERE TING ALL APPLICABLE LOADS AND
! CONSIDERED ,
LOAD COMBINATIONS WERE PROPERLY CONSIDERED. /
" SUPPLY SYSTEM RESPONSE WAS ACCEPTED BY NRC IN Tile AUDIT REPORT ISSUED NOVEMBER 2,1983. r e
WASilINGTON PUBLIC POWER SUPPLY SYSTEM WASilINGTON NUCLEAR PROJECT N0 3 SEISMIC DYNAMIC ANALYSIS COMPARISON ;
0F FINITE ELEMENT / BOUNDARIES APPROACil AND
)
ELASTIC llALF-SPACE APPROACll JUNE 198f1
' ~
n PRESENTATION OVERVIEW FOCUS ON RESPONSE TO AUDIT FINDING NO. 1 - - ACCEPT-O ABILITY OF THE WNP-3 FINITE ELEMENT SEISMIC MODEL AND DECONVOLUTION ANALYSIS TECHNIQUE l 0 REVIEW FINITE ELEMENT MODEL SELECTION BASIS j O PRESENT ELASTIC HALF SPACE STUDIES AS VERIFICATION OF THE DESIGN BASIS FINITE ELEMENT MODEL HALF SPACE ANALYSIS TECHNIQUES MAJOR ASSUMPTIONS SEISMIC FOUNDATION AND BUILDING MODELS '
COMPARISON - - FEM VS HALF SPACE ,
. RESULTS IMPACT - - ENGINEERING EVALUATIONS O CONCLUSIONS I
6 9
a
RESPONSE TO FINDING #1 AN ELASTIC HALF-SPACE APPROACH FOR SEISMIC DYNAMIC, ANALYSIS OF EATEGORY I STRUCTURES HAS BEEN PERFORMED IN RESPONSE TO THE STAFF'S REQUEST. THE ANALYSIS RESULTS CONFIRM THE ACCEPTABILITY OF THE FINITE ELEMENT / BOUNDARIES APPROACH EMPLOYED FOR THE WNP-3 ,
SEISMIC DESIGN. .
SUFFICIENT ANALYSIS HAS BEEN PERFORMED TO DEMONSTRATE THE ACCEP-TABILITY OF THE PRESENT DESIGN BASIS FOR WNP-3 (I.e., A FINITE ELEMENT APPROACH).
THE DETAILS OF THE ELASTIC HALF-SPACE ANALYSIS AND COMPARISON OF THE ANALYSIS RESULTS OF THE WNP-3 DESIGN BASIS ARE PRESENTED BELOW. .
i O
e S
SELECTION BASIS FOR FINITE ELEMENT SEISMIC ANALYSIS .
0 FIN 11E ELEMENT / BOUNDARIES APPROACli WAS Cll0SEN SINCE IT IS GENERALLY ACCEPTED AS Tile BEST ANALYSIS HETif0D FOR A DEEPLY EMBEDDED STRUCTURE.
0 USE OF FINITE ELEMENT APPROACH REQUli!ED Tile USE OF DECONVOLUTION ANALYSIS. '
f 0 PROCEDURE FOR SEISMIC INPUT FOLLOWED Tile GUIDELINES OF NUREG - 75/087 AND WAS ACCEPTED FOR Tile CONSTRUCTION PERMIT. i e
e b
IIISTORICAL PERSPECTIVE OF WNP-3 WITli RESPECT TO DECONVOLUTION / FINITE ELEMENT ANALYSIS s
(1) 0 CONTROL MOTION APPLIED 0 CONTROL M0rion APet:Ep -
AT FOUNDATION LEVEL AT PLANT GRADE.
O DECONVOLUTIGN ANALYSIS ALLOWED
.)
(2) 0 BOTil FINITE HOUNDARJES AND 0 EiTr!En F.INITE ELEMENT OR
!!ALF-SPACE APPROACHES FOR llALF-SPACE APPROACilES FOR INTERACT ION ANALYSIS. . INTERACTION ANALYSIS.
9 4
w
ELASTIC llAI F-SPACE STilDIES - PURPOSE / SCOPE 0 Tire ruRPOSE OF Tt:13 STUDF le TO DEMONSTRATE THE VALIDITY OF Tile ORIGINAL FINITE ELEMENT ANALYSIS USING Tile INDEPENDENT ELASTIC llALF SPACE METHOD OF ANALYSIS.
0 ANALYSES WERE PERFORMED FOR EACil 0F TifE TilREE ORTHOGONAL DIRECTIONS (N-S, E-W, AND VCRTICAL) SEPARATELY FOR ONE-TO-ONE COMPARISON WITil illE FINITE ELEMENT ANALYSIS RESULTS. >
0 CATEGORY I STRUCTURES INCLUDED IN COMPARISON ARE:
A) EAO n) SillELD OUILDING C) STEEL CONTA!NMENT VESSEL D) INTERNAL STRUCTURES INCLUDING RCS COMPONENTS 0 ONLY Tile SSE is uSED FOR COMPARISON PURPOSES OF MAXIMUM RESPONSES ,
J 9
e vs- w
I
- 4 a n, s
i is i s
g 'i,
. i g .2 s g % %
%s \s.
\ \
\. . s
'. \ \ .
//\ . ' ./ \
/' '
\/ \
/.\ g
\
3 e
- I , .. '.,,
/ . . . ?
/ /
/ ../ / / i
.~
A, s l / .
/ a f
,/ .i / .-
/
/
,/
/ . . . .
/ ,'/
s
\ ). 3/ .
. ' *\s
's.
s.-
A_ -\ ,
~
u :. .~-.. .
\- % \ .
_3 _'6. \ '
e
/ .<
i
\/?J. p, .%
a' ' ' *
/ . ,
/
/.'-
.?
f'. --y ' \. ..
',\
a,
,: s
~..., /
e-
., s/.
, ,. s, . \
j\ l,' %
/ s </ !
' 'hjl'r ' , ,.
\s / ,
.g N
' J'
- k, 'e 4
./ 4 a '?Jg -
f ,
m r~
- \ lr, i " ,.4017 /
- J':, g(T--- '
- s. Q- w.
.. - .' /
q ;'.. ,'/).* , s 3, j..\ . Jt* /\
E'.
. .g i
\ t,%,y' -i
.e
\ .: .
sf g nys \
/ . , , ' ' _ f ,.. ,. g
. s
\'N
.7 x,
.,e.
- 4. ~..j,,
b
\
\\
Ys -
- s //
j
-s
'i. , , '
'Iid&T,I
. f=--
[? .* -
'\ \ '
\' '\'.'.
~:.~.~; *.~.~ ~4 . '*; ' k.'~ .\ 'st.%',' \"
- s. i
.sM.
\
\ r . . ;.. 2,, / .. ", ( ,,
s s
. -m t s .i
'~~~~
- Y .D / -
- 1. 11 ' \ \
~_
- i. .' [ -:;i-- ,
i . - -
/ pe. ,
t'ou
'~ w p r**'
s
\, .
.t _ . ,. . . f g . _
a.fs - _.h 4
a
.a. .
e
.=;__- _ __.;..
ELASTIC llALF-SPACE ANALYSIS TECilNIQUES o
0 USED Tile TIME-HISTORY, MODAL SUPERPOSITION METHOD.
4 0 EMPLOYED NASTRAN COMPUTER CODE - INDUSTRY ACCEPTED. .
Q <;
O ANALYSIS RESULTS GENERATED FOR COMPARISON ARE:
A) NATURAL FREQUENCIES AND MODE SilAPES
- a) MAXIMUM OUILDING ACCELERATIONS i
C) FLOOR RESPONSE SPECTRA l
i I
i e
b i
l
', ~ . ; -
ELASTIC llALF-SPACE MAJOR ANALYSIS ASSUMPTIONS 0 ANALYSIS ASSUMPTIONS ARE AS FOLLOWS:
A) CONTROL MOTIONS ARE APPLIED AT THE FOUNDATION LEVEL OF Tile STRUCTURE , w, j
- B) IIALF SPACE AND EMBEDMENT FOUNDATION PROPERTIES ARE LINEARLY COMBINED ,
C) COMPOSITE MODAL DAMPING RATIO IS LIMITED To 0.20 AS TiiE UPPER BOUND
's
\,
D) THO-DIMENSIONAL ANALYSIS ,
E) MODAL SUPERPOSITION INCLUDED 23 MODES ue TO 33 CeS e
e
ELASTIC llALF-SPACE ANALYSIS MODEL 0 E0uivALENT ROCK SPRINGS ACCOUNT FOR TWO MAJOR SOURCES OF. INTERACTION
- 1. ELASTIC llALF-SPACE EFFECTS
- 2. EMBEDMENT EFFECTS
}
O DAMPING OF Tile FOUNDATION ROCK CONSISTS OF:
- 1. RADIATION DAMPING - MAJOR SOURCE - USED FORMULAS FROM ELASTIC llALF SPACE TilEORY AND APPLIED A REDUCTION FACTOR FROM R.C. MURRAY, ET AL (REFERENCE ~
2)
- 2. MATERI AL DAMPING - MINOR EFFECT - USED Tile AVERAGE DAMPING RATIO OF Tile ROCK OF 0.025 FOR Tile SSE CONDITION O DASitPOTS AT Tile FOUNDATION MAT INCLUDE BOTil RADI ATION AND MATERI AL DAMPING 5
e 0 DASilPOTS AT LOCATIONS ABOVE Tile MAT CONSIDER ONLY Tile MATERI AL DAMPING b
e
'-) m.
SEP 6 1984 Docket No.: 50-508 APPLICANT: Washington Public Power Supply System (WPPSS)
FACILITY: Nuclear Project 3
SUBJECT:
. MEETING
SUMMARY
On August 23, 1984, NRC and applicant representatives met in Bethesda, Maryland to discuss the details of their position paper on subduction zone earthquake. A meeting notice and attendance roster are enclosed (Enclosures 1 and 2 respectively).
The applicant presented information on the following items: (i) WNP-3 situation and status, (ii) Anticipated geologic investigations of geosciences program, and (iii) characteristics of the Juan De Fuca/ North American Plate Boundary. The highlights of the applicant's presentation are provided in Enclosure 3.
The technical presentation was made by Dr. Greg Davis, geological consultant to WPPSS. The major open issue is whether or not there is potential for a great earthquake (magnitude 8 or greater) in the site region as a result of the subduction of the Juan De Fuca oceanic plate beneath the North American continental plate. Available evidence supports active subduction but is insufficient to determine if it is occurring seismically or aseismically. Dr.
Davis stated that the problem was still unresolved but based on the most recent study by WPPSS, the case for aseismic slip is more strongly supported now than it has been in the past. The evidence on which that opinion is based falls into four categories: geodecy, earthquake fault plane solutions, comparison of the geologic characteristics of the Juan De Fuca/ North American plate boundary with other plate boundaries around the globe, and comparison of the seismicity of the Juan De Fuca/ North American margin with other margins worldwide.
The staff was satisfied with the efforts of the applicant and provided oral coments. Detailed comments will be provided at a later date following review l of the applicant's submittal.
On&$inAL ESNED BT B. K. Singh, Project Manager i
Licensing Branch No. 3 Division of Licensing
Enclosures:
As stated cc: As stated i
DL:LB#3 BKSingh/yt h ' :) (3 es K'11ghton j 9/ 5 /84 9/g/84 9/$/84 m2PDR ADOCK 05000509 -
A PDR
I
, ,- ~.
l WNP 3 ,
1 Mr. D. W. Mazur Managing Director Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 .
Nicholas S. Reynolds, Esq.
DeBevoise & Liberman 1200 Seventeenth Street Washington, DC 20036 G. E. Doupe, Esq.
Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 Mr. Nicholas D. Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98505 Mr. Douglas Coleman Washington Public Power Supply System P. O. Box 1223 Elma, Washington 98541 Resident Inspector /WPPSS 3/5 c/o U.S. Nuclear Reagulatory Commission P. O. Box 545 Elma, Washington 98541 Regional Administrator - Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Eugene Rosolie, Director Coalition for Safe Power 410 Governor Building 408 Southwest Second Avenue Portland, Oregon 9720A Nina Bell Nuclear Information & Resource Services 1346 Connecticut Avenue, N. W.
Washington, D. C. 20036
._ ~
WNP 3 Mr. D. W. Mazur Managing Director Washington Public Power Supply System P. O. Box 968 3000 George Washington Way -
Richland, Washington 99352 Nicholas S. Reynolds, Esc.
DeBevoise & Liberman 1200 Seventeenth Street -
Washington, DC 20036 G. E. Doupe, Esq.
Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 Mr. Nicholas D. Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98505 Mr. Douglas Coleman Washington Public Power Supply System P. O. Box 1223 Elma, Washington 98541 Resident Inspector /WPPSS 3/5 c/o U.S. Nuclear Reagulatory Commission P. O. Box 545 Elma, Washington 98541 Regional Administrator - Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Eugene Rosolie, Di>ector Coalition for Safe Power 410 Governor Building 408 Southwest Second Avenue Portland, Oregon 97204 Nina Bell Nuclear Information & Resource Services 1346 Connecticut Avenue, N. W.
Washington, D. C. 20036
o GEOSCIENCES BRANCH MEETING I. INTRODUCTION II.. WNP-3 SITUATION & STATUS III.
SOPPLY SYSTEM POSITION PAPER ON SUSDUCTION ZONE EARTHOUAKE IV. SUPPLY SYSTEM PLANS V. NRC COMMENTS VI. NRC PLANS e w/usos 9 W/OTHERS '
VII. U,SGS PLANS VIII. SUPPLY SYSTEM COMMENTS IX. DISCUSSION
, -- - - - - , - - - - . , .,,a- , -.. ,--. .._ .. ,,--., - , , . ,--.- .. . --.- - . - _,-, -.n, . . . - , . .-- . - - .
D '
Enclosure 2 AMencknce L;g
_'. A N P - 3 MeeLg 3 /,
7 ,
- 9 B. K. Singh NRC/NRR SL L3 3 hf0 tCt Manap/'
S Gucaum tv.9.c/saqu.fcu kswa, Gmy su n~
k,,, f nfI iwt/Mcc/os /Gsa &<.sme/cy< s t
/V,6e iJ Coalt% Av. rale Rwie+- Inscrwn cv-St /* N'CC 6 b / 0er, h, % I 0'ch NcOk l$an A//2<* css Go Qi,-/
Alax h ) a. w AcRs S hW N'neer
, $ s') s./ O A9 c* 4 C $ t*/'d *O t? 5 *,.1
- - . .*U6
< .. N . Y' E.6%'sJ2.6 U $d~ { 6 .= *~ L. : . ** -
- b. .h, /jj_, 3o J g'c)(7/2$ 3 baufat 7;c u"7~
W. Kiel wiybs 6-%%+
j f l]')/? f! W f)$$ b](?. 0.C [ l l /?.
- h. $U, 0 06 [lllQ ..//,
' I M lly,4, frejy-h hlg,1y G7 . A. Da.v rs /DPl%s GooHsJ6.sC Pmessa, of 6cology 7AfME /&Afd6%%!9/'foc4VC Aff/ptn'fGry, C /ranwu// AfC boe m t+. nod u:ceeuw ums setece Ethh L).
A)Ett s ES AinA A/pi/Dc/cgas 2
. E g U g s 3 o G w ooe<.e. m.= E--
6 4% . .
.. . , " '"""* 3
. 'TlP-3SITUATIONANDSTATUT ^
0 PROJECT IS 76% COMPLETE O FULL CONSTRUCTION ACTIVITIES STOPPED DUE TO LACK OF FINANCING 0 CONSTRUCTION RESTART DATE TO BE DETERMINED BY BONNEVILLE POWER ADMINISTRATION IN NEXT FEW MONTHS PROJECT PLANNING PRESENTLY BASED ON A JULY 1985 RESTART DATE AND A JUNE 1989 FUEL LOAD PUBLIC PROCESS IN WHICH ALL PROJECT COMPLETION ALTER-NATIVES WILL BE EVALUATED 0 DESIGN IS APPR0XIMATELY 95% COMPLETE 0 PRESERVATION PROGRAM IMPLEMENTED 0 ESSENTIAL DESIGN & LICENSING ACTIVITIES CONTINUING 0 PREPARATIONS FOR OPERATIONS CONTINUING 0 400 FULL TIME EQUIVALENT PEOPLE WORKING ON THE PROJECT 0 RESPONSES TO NRC QUESTIONS CONTINUING 496 QUESTIONS RECEIVED 397 RESPONSES COMPLETE l
21 PARTIAL RESPONSES PROVIDED MORE RESPONSES WILL BE PROVIDED THIS YEAR REMAINDER TO BE PROVIDED FOLLOWING CONSTRUCTION RESTART.
t 0 SUPPLY SYSTEM INVOLVEMENT IN CESSAR-F ACTIVITIES MAINTAINED 0 DRAFT SAFETY EVALUATION REPORT (SER) EXPECTED FROM NRC LATER
- THIS YEAR 1
0 EXPECT TO RECEIVE MORE NRC QUESTIONS.
a
~
GEOSCIENCES PROGRAN ANTICIPATED GEOLOGIC INVESTIGATIONS FY-85 (7/84-6/85) .
9 BROADBAND NETWORK e PLATE COMPARISON STUDIES e MARINE IERRACE INVESTIGATIONS e THERMAL / MECHANICAL MODELING e LAKE SEDIMENT STUDY e " CRITICAL" EARTHQUAKE STUDY FY-86* (7/85-6/86) e RANDOM EARTHQUAKE e CRUSTAL / SITE AREA FAULT INVESTIGATIONS e PueET SOUND SEISMICITY e BROADBAND NETWORK FY-87* (7/86-6/87) e GROUND MOTION STUDIES e PROBABILITY STUDY e BROADBAND NETWORK OUESTION RESPONSES i e AuaVST, 1986 e NOVEMBER, 1987 1
I TENTATIVE, SUBJECT TO ANNUAL REVIEW.
a CHARACTERISTICS OF THE JUAN DE .
FUCA/ NORTH AMERICAN PLATE BOUNDARY .
Presumably ongoing compressive deformation of sediments at the base of the continental slope suggests active plate convergence
- Complete absence anywliere along boundary of large historical earthquakes interpreted as interface events
- Complete absence along boundary of reported low-angle thrust mechanisms indicating relative plate movements ,
a Virtual absence of shallow seismicity that might indicate presence of shallow plate interface a Presence of dominant N-S compression in focal mechanism ; '
determinations In North American plate
- I
- Complex strain field based on contemporary leveling and geodimeter measurements
- Small size of the Juan de Fuca plate ,
(k ---
'j
i CHARACTERISTICS OF THE JUAN DE '
FUCA/ NORTH AMERICAN PLATE BOUNDARY .
(con't)
)
- Presence of subplates (Gorda, Explorer) that appear to have l ceased subducting and are internally deforming l
l
- Low convergence rate . )
l
- Youthfulness of the subducting crust
-
- Burial of the offshore plate boundary and trench by voluminous late cenozoic sediments ,
j
- High heat flow values from the sediment-covered portions of the Cascadia Basin a High fluid pressures in subducted sediments generated by i) dewatering at the offshore plate Interface
- No compelling evidence to support segmentation of the subducting Juan de Fuca plate
- Existance of an active adjacent volcanic arc .
(
.. . O 2 2 2 s2 's i .
$f *1 4 4 4 4 i i i t i 4 . .-
e-I
- j. 2 g g l l .
2 , ja M: L':.*.
I l
k -
I
- g fj i{ilf-i -
l l _
- .'*5 l - l u 1
$ I 5 d!:5 !
. - a
.- l. .s,e- .
- - =
' 'A.u 4 . [
l
- 1. 2 a
';[6',J],
l i !. =I i l.2~i; t1
- -[ . i i iL ! &
- t. ~ ..r. 6 *
- 2r
- $21 35 i .5 .ii i :g .! $ :.
- . d..' l . .
- !-_ , =ji c
- p o . ea P g. .c.:.s*. .
f ..
r .- - 7 E:~ [g
< * - .=- =f gt e1.= a.
, -Si
- g. .tN' .J s1 e . .# .1 z 8 8 gg [g g.: u 2 i nie rt .g i l 9: ,* . .:l .? l- a t i g- O g.. m o \q' , e q "
> *E}.
..",.,-)l .nJl* a.l l t
.**c ., .t:C. , s o .
- J l- 3
- . s-C. * * .n. J i j
'**'*I
.j .:. #lMT l- is 8 m-4
.J .
(='.'.;l'#* N.gh 1 I-4E
-.al-!
A
\
[
- da
. s -l L i .4 g o jg5
" 2 + ,f ug \
ti-:- J,
- ugl _ 1_ - N r
,j. .. g- gr* \ ti
- 1 l- l~ g \
. .g '. I l_ c -
m m
m
- 8 e
= l- O 3 '
/ : 28 w . cv - -
t la l
l-
/
- es
/ :- e4
- - I !?
=. l l- ~-_
.* : lJ l l g l g g g-
- "O *.a ~
IE JI 51 e
l l- 4 l l- Es o- ! n s l- ma l Es l >-
Dd I I- s
.: s 23 I
l x .g I
qQl l l ~C lo is p
m .d, l 38 es 7 -
! l- as l
i I_ 33 I l l- 3l?
.l l l- es I l l~ 8"5 1 l i-l l l- -
r_ I l I_ c i
I I
! t I i i i r i~
2 :- a e 2 a = g' y)
O r ,
m i I I I L. ~O o
j-R e i O
v ~
e 2 o
Q m
I 3
5 3
o
[ og gg ~
gNm .
s O e 9 E b o i i
=!
O $e M i q 1 5
D$
~ .
O il y .
Qs g DED 5
i
%" l s
"$4e e
- 4
'e O
_ o is e
e W j he '
R j, l 9 ee 9
, _ - ~
e
~
eO
- O i
e !!
ees l
l & 2
%s ~
' s O
$)$
g sa O O O O W n S%NO'1Iy ny HLd50 1
. ,m -
12 I I
~
I l h8.5C. Chile l o 1 o5 ~*
8.2 S. Chile lo - NE. Japan 8.5 9.O 8.2 g _
o Kuriles Kamchatka Peru 'o 8.3 8.1
,Tongo C. America 8.8 8 '
- 7.1 Al tions
- Java 7,9 o w \7.2,
- Kernddec Sumatra \
Q Izu-Bonin , o 8.0 E6
- 7,g % yus d.9.2 p -
- New Zealand 8
- 3
~
e 7.2 -0 a Marianos 8.6 CC 4 -* SW. Japan 7.9 o a N'* 85 Juan de Fuca 7.5 3 Caribbean 2 -
. 70 -
. Scotn. a
>Q
. I I I I ! ! !
iso 14 o 12 0 loo 80 so 40 20 o Age m.y.
l l
l mu==a.....--.-._m,-,.~.-~~..-~.,_,
l , e . - . m , . ~
l .,,,_.~....~.~~m~..,r-,,.~- - ~ ,- - - - m .~. _ . - .- .~ .,, m .,
I
(~5 f
~
4i x g h r
- q' .
I
's. ,- .' a . **
1 kN T.,
t ;'
N 33*N * ..A .\. .x - .
h '
hp ,
N ,
')~ *
... o i.... .
'.% 9 ' W.s : . - %. ., e,3 . .
a*** * *~ _ ..
- .; * <f f* %y , . _
3:
., . :. Q. .,.. ': * ..
1s n
. . y:,7 e<.y ..%, .,.
'.:'..[. '..; $' %..3 i..
.f: ' -
c o. ..;. ..',*.I.u.
. - \. f.,#
. ..g,. ,.$ h . _..~ ., ..s%
- 5 .. .
gg *W ,
g* ,* .6 *. .v. '.
,m .
..A.
3y *f4 $k GS*W FIGU"I "' gg cters f*08'id tn f* US pp ousee ** #g ig7: to 5941.
isee tent ,e, sincus# I
T A
g0 kns _ _ _ _ _ Q 3p 40,0g .
! i .
I 30
- e3 kP 44 i I
N * .
N _
i
_ . - . _ _ . \ !
9o .
A - - - - - - - - -
i 120 T C Shikoku -
t i i i i lionshu i i B '
- VA T .
Sl$ g Puget Trough , , iA 1- -
'" " N,0;,;; G$ h;on*Pfl % ? J1$g,'yfjjiMMMg'g,ia0
- ..!.. .... g ...... ,.. N. 5 enlent of
% ##'** *'"als a g e u
ng 4 (T;,g,i.iit.'j*.,g;s-
%~,l.}",,i, , , , , ,' '} }
, . , s,
' subduction
- for past 1 to 6 my subducted 7 - - 'I' 5 'I' -
Dlate ? ?
- at 3.5 cm/yr)
{
FIGUftE 5: Comparanve geometry and geology cf the Juan de Fuca/Nonh Amerleen and Phelppano Sen/Euraslan plate kiteractbne.
A. Comparatrve profJos of the plate interfaces The Geornetty of the Juan de Fucalticeth American Interface is taken from Figure I; that of the Phdippine Seaturassan interface to largely from idrahara.1961.
- 8. Csustal geology of the Eurasion upper plate storig a tJV/-SE section from the tienkel Trough itsench). T. to Honshu Island. Pre-Conorote con-tinental Bihospiere entends to alleast the acuthern coast!!ne (C) cf Sh&oku Island (Kimurs.1974) Cenozolc accreted deposits are shown by the panern between i and C. No contemporary volcanic arc is present in Honshu.
C. Crustal geobgy of the florth American plate stong the line of section tilustrated in Figure 1. The boundary between pre-Cenoroic occreted terrane and Cor.oroic rocas accreted la fearth America underenes the Puget Trough. The mapr bw-angte fault near the coastEne (C) .
separates hanging wat Eocene basalts of the Crescent Formellon from Eocene to Pleistocene sediment of the underlying accreted wedge Locaten of stus Irwust laut as Irom Snavelf and V/agner (1983). Figures h the bwer Juan de Fuca plaie bdicate that the age of oceanic krhosphere beneath it Wr4P-3 siee is approssanately 12 m y ar.d that she oceanic Inhosid iese beneath the site was beneath the offstore esench (now fdled) ort/ 6 malion years ago. VA = volcanic etc.
~ -' .,
y -
g._:.4, ,
{ f N. s
.i r
, ,~- ~
- e. .
o gg -.
.. . . ,. s.> % . -_%, .. .
~.- \ .-:
P. .
j-Q- : f, ~a '. ' * / W s.
An.Cc
, i
' 1, N
- s.
. .f . .
- o - ,n * .
c R >:.
, g . .:-
. . ~ f: .,
- -)
/ p < ~' . r- / .
.... b. ' d, ' . ..
.n,~
iE *e
~
~ e.
e
. g8. e
~
~
.<. h. ,.Q,. b
.~._
%. e. p/ i
-. e
. . 'N, ' w
,sc\. . r,.
s.% ~ - e .i C'-SL$ 2 w.R. r -
. sfe,- ag q'TN , NM '. g
.O a.
3
- /
4 ;$
. , , %,\ '
.-$, .Ds,s $ll (a(.s /
. , . ,.~. . . '., . ;>-
^
o ,- ,
a g-
,g t' . . e-- a, \ .
{Y* $f. c . .. _.*' f Yh t-
. . , , m
.<, . ~ -
S$..5'V I!N L S *l
- % , O ; ,t.' lW"s i
~. / 19 ., v.rO
.s.~ /
.s. - s, 9 a r . -
\ .o
~s si' R.
i
.,e . ' s. .
.. . . m \,. u'?.
- j / sf
,: g( -
.g 5 g
e j e3. - ' , - it,.
% y '. gg 0
.r. i<. ; -
. . . p n . t a - .
' A~ 8 - h.
.. 7,h -hl
- 0~.]
~ '
. g.- .' t E \
0 1if FR, e.'-
S . ... If J f / . 7> %
e .1 -
-*r ik
~o;
?'
N-4 1:
?. ?:. ' .:- -
~ '
.i.i ; , a
....~g
~
/ .; g6 s a ,, -
c ,-
- n. y ..
[*. , ,N~'., ~.f-s g...
- 4:
11 4.Qt:p.Q p .. 3.
3 l_,.
4 j .g"v - Q, :',s- x .3
,' .oi a.
- g:. rsq.A s.
p.
.s c.
- :r w w. - a U
qM
'g a I~v? :m.s .A.
e -
u g, s S. u 5g cmN,. ',
5
'.gu s --
~.
,. - $ a-
.r -
w'.
- - '- - , 4 4..'
/ .
c u ,.'m..... ' ,. /. i s 5_i m_
.g s
- 1. 3. %, % .
~! :,
s w.
0,glyN...
) .,.,. . _ t.
~u
~
4_) ...- % u ' . n.
. C 3s ca
... ._ s ' ;\. ,,., ,
x s . s_, - .-
.j, -:-
- / .i s c', ...- . .
. y; .a.> t A ) , . u, , i < s, . s.
r w- \,, . . ;< ;
- s. .s , ,s \ / x z'
.. s .
s - ~
F.~q- , f. ... 5/._y ..V .
.; - ')
g\- L" -
' .l i w ..
s,,,,K' t .
../.- e
.8
.j,,
g.1., N. -
I / <
g.g g
, {
,--. >. n
> # , r-
. , .s < n.
M~
3
, a .jS..
- v. ,
Ek. pf N',N,
(
L.:-C. ,c .!
)*i 3
t
)/... .
6~ '
f 6 3.1 y
1
.t.
17 ' A .' ,./
i
,.%sy\..,.'si s , . ..
4'. Aa D -
?g.
j'{cfe-L.
.Fy.
. - s
%,x,
- K'Q., : ... , . 4.n. , s;,p .
L':(.' g ,;'L ,
- sy,1,. <s,c=-
s.-
y g .2 2 .- =. ., . ,' ,._. t
. '~~ ~y g' . )y. % --* w,.g '\s,
~
~ R
- 1. , +\.s - i -
~, . , ~ e. w .. . . <<
,- , j.
- g ,e'- . ;m P# .s- 1 +s ws. ...
- f. , .,
% ' ' '- V,&f. '8,w.lm- N' ',. \ g [f , /
.mm e*
m
- - \s s.
t 1 a -
2
- o }
> L.
~= ..
y... QQ, f,; , .. , l} , > ,
}/
. -~
B 28* 127* 12 6* 125* 12 4*
I 94 , ._., 4a=y+ /';g V,g?"r' . .
qq:.<3 l / ,. N Q T q . . '.$. ,, ,
', %a/'VANC0UVER T .j -
v9<. %E' A. ..
~
- ,, ; ~ n' .,
~
IS L AN D ji' e..<
ses ; ., .s t
~~'
g)
! 9* y
' t . .y1,ly
,.I' 'k ,
-7
$ y,./"
,[jTf
- Q, ,..__
"' *g#
\ ,N . s . .t 3. ' g l- . _
ay i
, .- - : I
.'. ~
/b? ! / . ' . 8 .- #
'"""\ 71 / I[..n: .~
,/, U r i i .
< ( @ '- s Y],hhek. \ l l LX ,!ij Y
l'
'y
'l
. ,,i x wir/,.<j u.;p&% : s -
y j
,e g
u , gs.q
!f % --[
4p s%
} % ~%.. .)'v 2g i
],[
i,
,) / k ,),,,ME,\,i .r
'l '\, \ ,kv(, h 'v .( v p y ( -
s s .'
aqw. - y %-
s
\, ,.
a gr.: ,y V t,s .
n.
,...1
.., : g i, I.., f-g w 'I' ; lo.# S W r N Y T[ . t,
\ t ..-
.\1V
-- ^
4 o ,i
/ t I
,44 tories' Deep
- \ fY, , ' ~b '
- !i.
l %f / '
-(
.- b q ..
Il i N. , j .'\ k ! a / \. \/ !/ . . . - '
'#'\
'N "'.\(-
'{ I@ ~ % hMb1 b, ..?. c. g \i \;.l.j' sad e J,t(l 8l-- %,l!' % MQL%G- Q:nf) *)l d'6 ~ l. ,,
i.,r
/
. . a . -s v.
... v
,i s/ -
j . '
( e
,. L,,s*. N .i .. . ., , ! -
.,/;
... .. .- . ~ . -
~ y 1.k y - * -
\' ,
p 128* 12 7
- 126* 125* 12 4' canuma n==~e e 400 me isonagg ry Scypn Larts11mnan er ec24poggArtry e 40 a ssar summme ess==e seems es== -
P100Mt 7 Baryviou'y of trte hare.= Semes asms curversernas maripn. eausteneesem Srimari Coeurewme. Waarwigton and riertrtweeseeri Crepon. Leien are to esert, oavvie n faciens From mee i3 son. semymove: Aaea os trio Paarviseasom Pactic Ocean. U $. News CCeanogroosi.c ortice M O. P.4 Pee.1309, t$71 k
/ - ~.
- 2 YE YE . h 595 .
i % o, .
3 35 %
-2 3- .
852
^
I I$
l l z
, I .I i
- lM l-
=>s,L :csa: I~ ::: s Ij i ' i i
I g -- I g I
. I i j i }-
- s. I s I
~
l l I / h g i i i / {a-
-I I j o{ l I lhs
=r i i l /
I I I I / $$
's E[ l il 1 ii
/ .
$T eJirc3 m 8 r;- ~ ~ - / :. 2 h i I &&
?. -
I l 4=
'I -
ol~ I l l I $.1 2 2 '- I I $. ai x -
I 35
~
/ ""
w e -
.I f k O
z I j *5 4 81 -
l 12 H L I i~
E t I f 35 o SI . I I af c-2 ,'s ., I / $5 t-* I I *b Oro 2 83E138E I I l
ng g .
I I na~
l I MI>
S - l I II
- E g- - II $$
ac II .c g - II
. I I 3 - lI lI S :.1 I sts a
$^ ' ' ' ' ..,
^
2 2 8 ? 8 8 (NM) H.Ld30 ,/
)
- !! . ~
.. y
)
l~ c 5J; p
- 9 , TJ x co l
~
- ~
..: _. s A '" ,, ~ \ ;
W,-gl~ ) tj e. -
-w a:
1 f/ J' f~.f. m.t -
j,i
-3 . I Yf i
) /, j .
g I
u- ?
- ~
\\ % -
lg k i,- i L.
IQ Ih ' , .
!l g' a ts Il, >,' 1 I
i 3
]
3 4 , ta 1 i _-
1]
ly W 3i 1
8
.- l=
- 2 W
{.
3 a a me5' -
l b $
- y( : ;3 -l5
~ l 1 g6 E m ,
' .I \ ij $ l: b 3 h 5'ibli
,7 c
,byh $
, <{,. <
' . .i . i l
ijs a h '
' u.io m i.i $
ti h*g l
- ,khI tjjar: tali il[di 5 4,
,I i b
- ! $ibliEbbh I p/
r 1 5
r l
e
@@@@ SQGGi@a' E j.
[ -' /
{
a s
a 3
e
, , l',l;I 11 11 - -
i n $f I ss-
,i.-
,; J1 : s,i s.}.,.o_!
j i
- q. =
! p i f=3 ta uvili !
. 3g 4 4
! 11=4 5 n3
\iV I grssjiie
$ 't b
E5bb5bbb l ~fl:h'
~
.... ll! 2E8@@@@@@
e, 4
- -, ., =.= , - . . . . . , .. . . . . . .
A. -
u ..... -
A. *
] -
,[ .- -
- .x . s _.
-~-
. . - . . :., e~ .~.~- _ _
..,,,,,,~ --.~__- ,
i f ...f .1"'
g l -(s.s.
s,,-
~ . .
saet. uio,.
- W:
- - -a. -r o.s c .. -
. . ??
~ .
m= i_ ...._ ~ .__. , ,
c1
.--.-e-a, -...- . ...-. - - - . -~ ~ ~ . .
3>a.. .
n,-..........
,=, , , ,
=
. . . - ~ , . .
A, Ca.pe.alu .ai. i.. ae ...rw.4 .uk. se os aoc= .a. '
M Pu.c e a a. ,.mt. . pen gec n 6 e u,, , u-- in . .. [7] **=.a . 'd a.' ' a -. ' ' '. '='. 9 *t%'
I /
[fM U.pe uic.a. massie. ss tw aec sa ) {g v h.I p.,.n ii k.,, :.s.s. g-m3 )
i te, i c.. e ....- e s w. - : [jr] 7, s o 6.u.a.s i A c Fr;; 1 s.aa = .a ese c *a.d.m. u.a.a.: M uder. E = a. =ia pii.im .< : s.ia. .":' ~ . . - . g, y : s., s 6 4.s.n.h y 5aet ni. vi.acea4. s w 6m. to. : N g w .. .. % : g i.e.,... rn.,. 4. u- a.
INDE E M AP
$OURCE: a 0 8..n. Sn ely .. .I 118e0)
FIGURE 9: Geologic cross-section of the Continente, Slope end Shell through central Orogon (mod 6lled from Snevely and othe.s.1980)
-.g t
, e-
[ #
. I
. .. ' iIi e
m }l
'if '
g,q > .
1
,/i!
IN u.g h fli I
,lii K'Y .'
'Ib-n---
~
A e
E
< \
- l l
h .\-1I YJi I
l r
N_f,, i,
'e *
}) 4 N
'/s $
i l
h $
(LL'.
1 3
t 31 f*
y 1-l,d- N
\ 1 I,-
I e s
,V*i , x 1, o .! I '~
{j : .*I' i Sh!'
- H i ->
iii n >>
h
r --
1
'3 ;
f \ %
4 % / '
\., LA?
. Q,.
%p g
~ '
- s. ,
- h, e s
- . /
'i,/
/
). -
/
4 i
'e 30. ' /
- W
\ ,/ /
" A, 5.
9'l. 9 / ?' '
Y
/ /
. ,,e, .z '!
/ V ./ : *
/ */
F
/ !
/ ., /.' /
- / / ~i
.,/
l/
,f c / I I~
l
'/
/ h fo t
/ / l
/ l l /
- QN A
',/
/f: ic
/
/
/
- ~
l / / .
i
{ J
/ /aCL '
, 2 ( / / i l . ,'5 j
, /, ,/
Am
/ \; l \
/
),' /
'7 i A, '
/
),
s,j e
1
/
/C k
/ I
/ as
- se ._ b .o ft.
Picupt its use of te #eem W ene.mq enemmerwe paowesed W vereue ==reers. Caened eas woes et cosas e nees or con.
teiemsemese.Seenosiser - . or annerneres as immees.4 saarnare, t F7st: 5 (mam,1M:n C (Hugnee end cirwre, iEt D Meowes ans Swan. Itest E (Wee.er one : - ; ten 2t P aw 0 mame se "oposi ei centese enegnee: anernames (#eeni tws:
Ar r, tota teos enee e=smee me ; u
. se enense e.wm Arrer- on Puca ciese arve conce. cancAre exannee G e Geresenet S Seeer, GP e Gesses #sen: M . Racer:3M J . vee.
_erom. sosiruw e _W ennen:. e - c,. . -- e _= $4 begne. A . Acesu: . ~.m et. e_Moois:
(w - ,
12 i i i i
\ 8.5 -- C. Chil*
G 9.5
- s. chi!,
8.2 10 -
NE. Jaoan .. .. 9.0 .. o 8.2 -
o ,
Kamenatka pens t-----a 8.5 g IKunles
~'-
- 0 j G.d.3 ..
a.)
Tonga g G,C. Amanca 8 -
73 0.1 i Aleutiansh Ogg }
Java 3 N 7.2 0
de'rmadec 7.9 h"*
Colomcia -
g ,1:u.Bonin ,
g
~
C E
" \ '
I (o " fan
,,,R v w w s S***
43 1 '
~
. -. 5.y/,3, y,y
\ 8.6 4 - e C# J'U*"
anas I 7 13
- Juan
,, y , ew N Hebt ' ne ;
h
'8 "
7g Fut.a l 2 - Canebeen e ? '
AO 1, 7.0 Tg i
Scotia j l
0- I ' i I I\ ' t 140 120 100 80 ,
60 40 20 0 AGE tm.v.I RELATION OF MAXIMUM ENERGY MAGNITUDE, Mw, TO CONVER.
GENCE RATE AND AGE OF SUSOUCTED LITHOSPHERE; CONTOURS OF Mw ARE PREDICTED MAXIMUM EARTHOUAKES M AGNITUDES BASED ON LINEAR REGRESSION OF OBSERVED MAXIMUM E ARTH.
OUAKE MAGNITUDE ON CONVERGENCE RATE AND AGE; DOTS A'lO CIRCLES ARE SUBDUCTION ZONES WITH ANO WITHOUT B ACK ARC SPREADING, RESPECTIVELY (from Heston and Kan,1 mort, in press). ERROR BARS SHOW THE POSSIBLE RANGE OF VALUES FOR CONVERGENCE RATE ANO AGE FOR EACl4 SUDOUCTION ZONE (see Table 18)
? ..; .
3 .
) -
O D '
V
! 4 a., in s Q .o :~)- n~%s, ~
\,f h ,f
- s -
N~ -
9 _ u t e l ijb
? bk bb g\ /, =========
t i "31 i ! g lt-==,,,,,,
?- 1
- s. l J%3 \
4 . . I - l'% j
\
W} ,_ . c,= &s . a,
.=
s .
,q _ 'o l G :
l 9 CANADA
.= g ==
d ". -
= = h == = = = == AA . #
- A
- .; ==
5? ./ 4 A A ~ .."... ,--EXPLORER R!DGE
= -Es 'A.- t .. ~ =.,!.a_sA A A = == . . . . . . . . .. = ,. == - = = = = = = = =M === =- -. %. . . .
- s. .
.a 50'N ~
3 Q5 .--'_ = 5 i 25 2 5= 2 4y ..
-:.., 4 Qqp. . . ii;.y.W 'T:i .m'.::< . ~
SOVA,NCO! FRAC'{UR .e A'4 4 *. g.. v.:J Q.;.. -)., s: ZONE - p ,4 S.. . :.. m
= = ==;. = , A .. .
t "o ....
= = = = '9 .... - . ;g oO !2 l
- ==
== = = == :.Q
- .==_-
. m~ .== x?* Q2;.% &,.. . et. l:;,
c o
,e == == .=.= = = = = = =
- m.="= . .=_.== ~. . =---=.
= * =*.-
b 1,. b~d s s -
= =- =.. - =C'=- ==. -= .. = = $. --*1-= =. . ,==. . ~= . ^==*s.s .. q , .+ ,4).*.g .:a = -; = .= - .,., = a 4. _+~.5 . - s es c t, = -. ...t .a4 E *, =::= *? %.m 5"" Q =EE =.:. p -.:,,.. - 2-.==_ ..== .:. . == .. . . .!.::
A
$ := ..=3 . ! . .*g N_A 7 ik - == = =
5 g . . :d=.E
== =.
e - . W. :, .,.. .. . Site
.= - - = . , .' 4 = ~a :=: 5-= = == = ,
4
= .= == == = = == = /==. : === . . =- .
- . , A4 55
=
i = =iBLANCO Y. -.& .==g a W.=;. : &,, . ... '/. 4
= = = = f =. , ! = sFRACTURE. J s .--s- G Ei !!
5 i =-~
=
ZONE ( ~442-s:.! 4 C f"p5 ". - ~ 22 7== . f.?s 4 F
- l. ,i
= = = = _-
A a - U. S. A.
- = . -==- s, 1 E
=@ == 5 A - . .. =. / . .= "m=. ,7 A..A,~2 .A7 = = = = = 4__ . _CE * = 2 == = = = :. = = ::= : = = _=
g: A- 4 A + === b ..:' 2Q ii =._c i M i = i A5 5 ' A -i. 85^:; e - E
=
2 i M i E i
* "'== .&- '81 E
i A =g= = s= i:
= = = g = =
ti- 5
=
5
= .=
5 e '=i.e... l.3
= == =
_=
== -
- [g__
== == = = =
4: . .. .. .-
.A E i i EE -
E 4 Ag h= , -
= = - - = .& ! = == :
E i Mi? ^ = i E ET A" g=E.. . 3 A
== = == ==
_=
= = = -i =c - . o ... = =4 _ . . == = =
2
= = == == == = = = = =
3 ==c=-*
= = q z ~}_.S A : A P 3 = i E dM M i I n;-
gi i isE [
-i s -
if g ,A u -i : y.gm:h
" ," ~
____y ~ m /h q MENDOCINO FRACTURE ZONE # 9 l N 4. iss.w iso.w #2s.w ico-
n i
~
EXPT.ANATION O.--..-. ..~ g 3 km. and ae.wree be. ween l970-19 78 00 %
., , , "'***'"'"'*-t=
O O a an .a. .iu.a
#*F""***"'"*"***""*#'#'*'
O O % 0b OO oo O O g O 0 oO 5== Rere 25-31~ for crou-sectson
@g \ A' db O O
cP o 0% 3
/ 8 O . O %eg 0 Q O
v 0 0 cc 0 O 0 o o . O O o o O O .. S 0 0 o ?. Preisetton O of Gro % 0 O
, 9 e o A SITE O
O , O O p O O O h ( ,s 0 E5 to Miles COURCE: Ep.centess from Crossen.1990
~
m
^*4 am, +--w.
z n -- . - n
..-.-.~~~~..e l..
I
\
y'b I %,
* ?[f~m V , . ~ -
r %_ 1 -
? .:.. . ' .z t-+T g . .,! . 3 .g . . ;.e \q sho.a.'
er,5 :). ) . ( . [. .) !, l _ m.4. ..
=== .. ' 5 ~~ . jh. '{y. .,, . .{ ~ * ~
a,
}c j . . s -'x. -
1.;{;_ 7 .c .-/ @ .- T 1\Msw- +W g- 4,- - W' . :- ;- ,
~- ** ! - / . .s -3 .
1 g
.2.- L s.:= . . g .) . t i *t*~.~,. -.j, . 1 .. \ * / @ r ~ % w-i \t \.,.e >= .\}\
j f . =
* . *
- A . .p'- j a
I. + l as ,,c., .
.J' s .= /
i j
- .. . / it , ... .--. y . .
r (.i. .- g/ f . g.- ..- - 1
. . .i . *' . ,, / (3 .
l 4 .: :* w,..n m
- .. J, . . ,. -* e s- ) *ti Y s .
L.
- l. 4
- e -
I
,.a s
l
. a ,a 'I ;,,,
w , . 2 m
- e. .. .
m (- \ I . I.
/ . 3 * '\ / . .. .~ ' J( . * *I .. - 4,, m. --{\ '
I .
-* \ * -
l . - > j . . ., Q , =. + . . t' . >, + .J j l .,
'. **1 . *"l* g* / . *- .g p; . . ~~ ~a, i -
- ey, *- *. 9 .sA.64 f*.)e. .~'
i >~
.* . j * *t m .,.,,i
- N, .
- ~ .
.N' **,..,. ** . ** a ae i ,
- s. . . , . . *. . *..
*>* * ..{B'. .
( ..
* .s * *M. . . ~.A .
l =. _ s\;. . 3 o.- .,
. n , 1, ',. h!-We" l
\
.m m i .B= = ! W =
8 E .=* M S @? y - .
$I $ = . M / =,. = EXPLORE b
CANADA M ( l 8 RIDGS _ El 2 a =s -
- O - gm T H M i == 5
=# = .
4
- <rp -
1 .
's =
s= E . _.- Explorer e. c 2
=:
_r s
- =
n, . -
==
s;
=
i
=a 3=s s
2.Sovanco e.. er . . 6 5 iMm Fractwe/
. zone -
i . , a ? . 1 aa = =. . . g i g r u, , a e* a a = m.a, = ki Q m e=
=
iE:
= ,/ oO 1g =
i E
= .
s'. . w m I E
=
s s < == e n
= ; = =
u M ty. f u, b' Es i
- =e
. \ -i
- . e w i , - .
= /=& - 1 i a ,/ 3 =n . .
- ite t i
= =-
14 7 -
/*- - ! =5 1 m i\c aa = * - ==
s u .! : n == m a=a =, e =a
= g12 7 = =n=o
- = n m :
- x - ,, /a i E
m!mu
= .
- so 's = st a aa a t in s n --
e e ' I * '/ es*N E I is ~i :/= sn ==
.y s- M , = * ==
1 . t M e;
! R =
a Blanco -
. Fracture E , / g< =/ a= . N as s . - f EE' n
3 i E a ,! Zone - 5= ! g/ r/ san'.* 5E m=
== = . m. i _e = . = IE M i. = !
M - UNfrED STATES
= a_s = = == ! a 2 -== . =
t en a i : .i .e , - r sa == a i a M 16 D E. ] E 4:1
- M i E g B M s E gf 4 ~~
2m 5= e/! Ri -.
? E se; E = = = -* = =!
E 5 = f I E*
$an EEi een EE = =
1 R $a -I r/ Ji-=E ** e ez e c , iii a
! 22 55 == I! 52 ii ( =
5 / M * - i, > 1 as sas 3 si
= .s= . a -i_==- .
E i iia 51 9 = f /. " . Es a sas 58 I. - 1
.==- . f a a -=s =
q e - Mendocho Fractwo Zone -
,- ,o ms ,.
ssisa+4
. ,y **4. ii .., e '" * ' .N b.
k ) , h 4
., .g %
mam
- FALn.T J
.1 t. . f .
4 s \ s. .~ QI. . , l_~.
. .% 4 . %+, ,; ,- ~* -l~ g\ .)
3
.%m ~~l- /+Q .' % ,) ,.1,W" ),;= \ i I \\ 1 um 7 z__, . s.N' 1 ~ - W .c M t \ \ \ . % g'3jc a.- c.a 1 =. a (: - . . . . \
g e; * " " " . \- i ar
\ __ ~=fh /
- g. . a W
. \ . ,f .u. .7 4 l :- \
j --- \ n
- M TR N\ j \.. . 's . I ./. .
- ig i
( 7 '\' M -lw, i=.4F 7 w J
}
x i.,,
;- \, 1 \
i r ,, ;
~. 6 ' ., ... . y. i . . % - ~ \ \ > \.
g
~
iq\ ,
- l. 4, ., , i 1
/j\ - (, = -
l
' ao . \ \ . '}
3 . l - \/ , ,c- ! m , 3 f.s.u.pe 8 s
\ .
- . 9 i
'sueuaos% \ FMI , . .a "" g e #
1 1 I l l
,m m . SEP 6 1984
, MEETING
SUMMARY
DISTRIBUTION, NRC POR Local PDR ! NSIC PRC System LB3 Reading Attorney, OELD GWKnighton Project Manager B. K. Singh JLee NRC PARTICIPANTS u BKSingh SBrocoum JKimball LReiter DMcMullen AWang RSavio CTramell VNerses bec: Applicant & Service List
~
Enclosure 1
. . o .
m w -== y v Q) 2 5 *.'! ' Docket No.: 50-508 ~ MEMORANDUM FOR: George W. Knighton, Chief, Licensing Branch No. 3, DL FROM: Victor Nerses Project Manager, Licensing Branch No. 3. DL
SUBJECT:
WNP-3 MEETING DATE & TIME: Thursday, August 23, 1984 9:00 am - 12:00 pm LOCATION: P.LW l19 Phillips Building Bethesda, Maryland PURPOSE: The applicant will present to the staff the details of their position paper on subduction zone earthquake. AGENDA: See enclosed. ! PARTICIPANTS : WPPSS D. Coleman, et al NRC , l V. Herses, B. K. Singh, S. Broccum, R. Savio l Victor Nerses, Project Manager Licensing Branch No. 3 DL
Enclosure:
Agenda i n c1, v n r b) n%m ., e't U no cc: See next page r 9 w' v x i l , Meetings between NRC technical staff and applicants .for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend 43 as observers Federal Register pursuant to "Open Meeting Statement of MRC Staff Policy", 28058, 6/28/78. Those interested in attending this meeting - should make their intentions known to the Project Manager, Victor Nerses, at i'Up (301) 492-7238, by no later than August 21, 1984 M / (J U '.
.)MV '"c'> DL:LSA3........ .. . nye< w i-w QL:pA3..........
ha -- -- D}(,).Bf 3 h
.}}